Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jul 03, 2008
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

Not that there's probably anybody left in town (*tap* *tap* -- is this thing on?), but just in case, here's a few items before I downshift into low-posting holiday mode over the weekend and into next week:
* My Ballpark and Beyond column in today's Post covers some of the latest news on retail (i.e., banks) I've posted here over the past few weeks (Wachovia at 20 M, SunTrust at 100 M, plans for 900 M). There's also a blurb on the month-old news of the zoning approvals for the Waterfront Park at the Yards. The column normally appears in just the District Extra, but If you live in Prince George's County, you got a crack at it this week as they snuck it in on page 11 of the P.G. Extra, too. But note that we're scaling way back on how often the column will appear (probably just monthly from now on) since the news isn't flowing as fast and furious-ly as it was last year.
* No one's invited me to the roof of any of the sparkly new Near Southeast buildings to watch the fireworks. I'll say it: I'm miffed. I do and I do and I do for you people, and this is the thanks I get.... [/sarcastic martyr mode off]
* I've tinkered again with the big homepage map, trying to have it make a little more sense. I've added checkmarks for the completed projects, and turned the list of projects down the left side (marked on the map with boxes) into only ones that are under construction or ones which the developers have done an especially good job of making me believe they'll start soon. The rest of the map is a whole lot of stars marking proposed projects. And they're all color-coded to differentiate between office, residential, and recreational/retail.
My real desire is to completely redesign the homepage, but I haven't had any inspirations come to me yet. Although, in the meantime, I've added another three random before-and-after photo pairings down on the bottom right of the homepage (after you do a lot of scrolling), just to fill some space. I also expanded my Neighborhood Blogs list of links.
Happy 4th, everyone!
 

Rumors of this first came my way over the weekend, and now WBJ has the somewhat official word, in this article about the closing of a $60 million construction loan to allow the completion of the 200-unit Velocity condo building at First and L streets: "Rockville-based Cohen Cos. is currently negotiating a deal with a first-class hotel operator for Phase II and is in negotiations for a full building user for the 280,000 square-foot, Class A office building in Phase III." Phase II, on the north side of the block, facing K Street, was originally planned to be a twin of the building currently under construction; the three levels of underground parking are already built, which presumably would speed up any sort of construction timetable for a hotel on that spot. Phase III is the section of the block facing Half Street. The article also says that the condo building is currently 25 percent leased.
 




                  © Copyright 2024 JD.