Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jun 14, 2014
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

Way back when, the Cohen Companies' plan on Square 699N was to build the Velocity condo building at 1st and L and then almost immediately start work on a twin residential building directly to the north.
Velocity went up, but the twin did not follow for nearly four years--after Cohen sold the empty lot to Toll Brothers, which is now building the River Parc apartment building on the site. And having a different developer build the twin has brought about a sticky situation.
Within recent days, Velocity residents have discovered that Toll's layout for the River Parc roof includes a wall that completely obscures the formerly expansive Capitol dome views from Velocity's roof deck.
This Facebook page shows the old view from Velocity's roof--and the photo below, provided by a resident, shows the new one.
In addition, the new building's design appears to place the building's 237 air conditioning units on the south side of the concrete wall, facing Velocity.
A recent e-mail to Velocity residents informed them that "[T]he ANC Commissioner, The Department of Consumer and Regulatory Affairs and the offices of Planning and Zoning have all been contacted and we are being told that all construction is being done in accordance with all plans, permits, zoning, and easements" and that "Every avenue is being pursued to somehow make this situation better for us." Alas, "[A]s long as they are within all legal parameters of their construction of this building, there is little we can do."
Capitol Dome views are a sticky wicket in the neighborhood, since almost all of the buildings that have already gone up stand to eventually lose their panoramic vistas as newer projects continue to fill in the empty spaces. (Just ask Nationals Park!)
The exceptions are 70/100 I (aka the Jefferson and Axiom) and the about-to-be-built 800 New Jersey, all of which border the freeway and so will likely keep their views pristine, as long as Capitol Hill north of the freeway doesn't suddenly start to allow 13 stories of construction.
But an impenetrable concrete wall certainly puts an exclamation point on the issue.
 




                  © Copyright 2026 JD.