Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: May 22, 2006
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

With the new US DOT HQ getting close to completion, it's time to start wondering when staff will actually start moving in. An internal Q&A recently said that the official move-in date for now remains September, but may be moved to early 2007 because of a change order for construction that GSA is negotiating. It also says that the move will take place over an 11-week period. And clearly some staff are not looking forward to the new digs, as evidenced by dotmove.blogspot.com.

 

A teensy bit slow on this, I apologize, but I did want to note that the second of JPI's two residential projects in Near Southeast, at 901 New Jersey Avenue (sometimes better known as the "Nexus Site") received approval last Tuesday from the Board of Zoning Adjustment for its variance and special exception applications. There was one condition put on the application--that any antennas on the roof be hidden from view--and JPI agreed to that. Construction will probably begin on this site late in 2006 (ditto for JPI's other site, on I Street).
 




                  © Copyright 2024 JD.