Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jan 17, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


4 Blog Posts

From DDOT:
"As part of ongoing improvements to the Frederick Douglass Bridge (sometimes referred to as the South Capitol Street Bridge), the District Department of Transportation (DDOT) will perform periodic off-peak bridge maintenance repairs beginning Friday, January 26, 2007.
"These periodic weekend repairs include expansion joint replacement and under-the-bridge steel repair work. Work will also involve painting and replacing handrails and installation of new lighting.
"Due to the nature of these repairs, DDOT will temporarily close the northbound/inbound lanes starting at 10 am on January 26. The lanes will reopen on Monday, January 29 by 4 am--in time for morning rush hour. During the closure, inbound drivers will follow signed detours on I-295 North to the 11th Street Bridge providing direct access into the District.
"DDOT encourages the use of Metro as a transportation alternative. Pedestrian and bike access will remain on the bridge during the weekend closures. All closures may be subject to change and are weather permitting. In the event of inclement weather, lane closures will be rescheduled to the following weekend."
 

In the past four years, I've posted a heck of a lot of photos of Near Southeast on this site. (Though it's only a fraction of the number of photos I've taken of Near Southeast in the past four years.) As projects move forward, I tend to continue to display the oldest photos of a location but then pair them with newer photos as the landscape changes. The photos that "age off" a project page are still on my site, they're just not easily visible--until now, thanks to the new Near Southeast Photo Archive. You can either use this map to choose an intersection and compass direction to view ("show me all pictures at New Jersey and M looking northward"), or you can watch for the new Click to see all available photos of this location. icon now available throughout the project pages, which you can click on to see the archive of all photos at that particular location (like, say, South Capitol and P Street looking east-northeastward, which provides you with a pretty cool month-by-month photo timeline of the stadium construction). Be sure to read all my caveats detailing the many ways that this app isn't perfect, but I've always struggled with a way to harness the bazillion photos on the site without making the project pages any more unwieldy than they already are, and I think this is a good step; and I may now start to upload more photos even if they don't make it onto a project page, just to flesh out some intersections that aren't well represented on the site. Again, look for the Click to see all available photos of this location. icon to access the archive, and let me know what you think.
More posts:
 

Jack Evans's office was kind enough to pass along a copy of the bill he introduced (along with David Catania) to abolish the Anacostia Waterfront Corporation and the National Capital Revitalization Corporation. There's no hearing date set yet, I'll let you know whenever I hear about it.
 

Thanks to correspondent John for passing along news that slipped through (no advisories from Metro or the Mayor's office, darn them!). Tuesday (Jan. 16) at 10 am Mayor Fenty will be making remarks at a groundbreaking ceremony for the Navy Yard Metro station's expansion project. This is to increase the station's capacity from 5,000 riders an hour to 15,000, and is to be finished by Opening Day 2008, while work continues above it on Monument Realty's mixed-use project along Half Street. And maybe after the mayor's remarks, everyone can parade over en masse to the Nexus Gold Club auction. (And I do see now that the event is buried on the Mayor's schedule. I thought that religiously checking the News Releases and the Advisories was good enough, alas.)
UPDATE, 1/16: Here's Metro's press release summarizing today's event.
UPDATE II: There's also now a post on the Post's DC Wire blog (I know, it stunned me, too) about the groundbreaking, and some background on how exactly the $20 million to cover the station expansion was found; I imagine this will be similar to whatever story is in tomorrow's paper, though hopefully without the somewhat misleading "More DC Stadium Spending Woes" title. ("Woe" would be if the station weren't expanded before Opening Day; paying for it is just a shell game that governments go through all the time, and it's not like it really has anything to do with the stadium itself.)
UPDATE III: If you want video, here's WJLA's report on the event.
UPDATE, 1/17: And we'll bring this linkathon to a close with the Examiner story on the groundbreaking and the expansion.