Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jun 07, 2016
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

The grapevine informs me that Forest City is moving forward with plans for a new residential building on "Parcel L," the site at the Yards along 3rd Street south of Tingey between DC Water and the Foundry Lofts where a parking lot currently sits.
It would have 270 rental units and two levels of underground parking, and currently has a targeted completion date of 2019 (which just isn't as far away as it used to be).
No renderings are available for public (or blogger) consumption, but my understanding is that it has a "terraced" design, and will be a U-shaped building with a courtyard that opens southward toward the Yards Park and the river. There will be retail along 3rd Street, but I don't know the exact amount.
Also, it should be noted that for the very north end of this parcel, along Tingey, there are also plans to have a "boutique" hotel, but there's no time frame for that.
Forest City is on the agenda for next Monday's ANC 6D meeting to give an initial presentation on the residential plans, in advance of heading off to Zoning Land later in the year.
This is not the only Yards residential project in the near-term pipeline, as the condo and apartment projects two blocks east on "Parcel O" at 4th Street are expected to begin construction in coming months. These projects would join the lineup of already completed Yards residential buildings Foundry Lofts, Twelve12, and Arris. It's also expected that there will be additional residential buildings along 1st Street SE near the planned movie theater.
 




                  © Copyright 2026 JD.