
Don't know if the work started on Friday or today, but a late-evening drive down M Street brought the surprise news that demolition is now underway on the old
WMATA Southeastern Bus Garage at Half and M. The demo is starting at its southeastern end (closer to N Street), and I can't imagine it'll take too long to dismantle the building. There's scaffolding now in place for a pedestrian walkway along the garage's M Street face. This is the first demolished building of 2009 in the neighborhood, and the 154th since I started photographing the neighborhood. (Browse the previous 153 via my
Demolished Buildings gallery.) The bus garage site, now owned by Akridge, is slated to be replaced with 700,000-sq-ft of office, residential, and retail offerings, with construction perhaps beginning in 2010.
When I was circling the block to check the extent of the demolition (made more difficult by Half Street currently being closed so that infrastructure work can be done), I drove past the Center Field Gate at the
ballpark and saw that the blank concrete wall that used to be the northern face of the Red Porch restaurant is now floor-to-ceiling windows, looking onto the plaza.