Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Community Center
See JDLand's Community Center Project Page
for Photos, History, and Details
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


57 Blog Posts Since 2003
Go to Page: 1 | 2 | 3 | 4 | 5 | 6

New page alert! I've added a page on the New Capper Community Center that will be built at 5th and K Streets, with some great renderings of the design of the new building (thanks go to architects Torti Gallas CHK for passing them along). The 28,500 sq ft facility will include daycare for 66 children, a rec center, a computer lab, a gym, a game room, and meeting/classrooms. This building is included in the vote on Capper/Carrollsburg planned by ANC 6D on Nov. 14 as well as the zoning hearing on Dec. 19.

More posts: ANC News, Capper, Community Center, zoning
 

News from Zoning Commission land: at Monday's meeting, the text amendment to the Capitol Gateway Overlay about the stadium was finally approved. As soon as it gets posted in the DC Municipal Regulations, I'll post it here, although in the meantime you can read the text of the amendment from the July 29 DC Register. In other DCOZ news, there will be a hearing on Dec. 19 on Capper/Carrollsburg, to consider Phase I Final Approval and modifications to the consolidated and prelimary PUD. Phase I final approval references the land between 3rd and 4th and K and M Streets, where they are proposing to build 91 3- to 4-story residential units (note that the existing private homes in these blocks will not be demolished); this application also addresses the plans to build a new community center on 5th Street between K and L Streets. At the ANC 6D meeting on Oct. 17, it was indicated that the breakdown of the 91 units would be: 51 units would be 3-4 bedroom townhouses sold at market rate or moderate (80%-120% median income), 11 would be section 8 ownership units, and 29 would be public housing rental units. These units are in addition to the ones already in the pipeline for the blocks between 4th and 5th and Virginia and M--there will be a total of 208 market-rate townhouse units in these first two phases. The community center will include a daycare facility for 66 children, a rec center, a computer lab, a gym, a game room, and meeting/classrooms. AND 6D will be voting on this at their Nov. 14 meeting.

More posts: ANC News, Capper, Community Center, Nationals Park, zoning
 
57 Posts:
Go to Page: 1 | 2 | 3 | 4 | 5 | 6