peek >>
Near Southeast DC Past News Items: Dec 10, 2006

JDLand.com's Official Unofficial Guide, Updated for 2016!
In the Pipeline
One M/10 Van
Yards/Icon Theater
DC Water HQ
Yards/Parcel O
Lynch/Half St.
JBG/Half St.
Capper/Square 769N
2 I Street
1000 South Capitol
25 M
Chiller Site Condos
Yards/Parcel A
1333 M St.
New Douglass Bridge
More Capper Apts.
250 M St.
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
Congressional Square
SC1100
Completed
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Capitol ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

On Thursday night there was a zoning hearing for William C. Smith's planned 250 M Street office building (approval requests for both a second-stage PUD and a Capitol Gateway Overlay Review). There was a bit of concern from the commissioners about the ground-floor corner of the building that faces Canal Park and they've asked to see more renderings. Despite that, it's anticipated that the proposed requests will go up for approval at the ZC's January 8 meeting (the same day that the Florida Rock project may get a vote on its request for a second-stage PUD approval). In the meantime, the Public Hearing notice was published for a Jan. 11 CG Overlay Review for what we'll now call 55 M Street, Monument Realty's planned 750,000-sq-ft office, residential, hotel, and retail project that lines all of Half Street between M and N. They're looking for some relief in regards to setbacks, lot occupancy, private residential recreation space, and loading. See the hearing notice for information on how to participate in the process.
 




                  © Copyright 2016 JD.