Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Sep 19, 2005
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

Anyone who's lived in DC for any amount of time will be stunned to read today's Post story, "As Stadium Clock Ticks, DC Officials Bicker," detailing the difficulties of getting a design for the new baseball stadium agreed upon. Much of the trouble revolves around the desire (pushed most vehemently by Jack Evans) to have views of the Capitol Dome from as many seats at the stadium as possible. More from the story: "Evans argued that a view beyond center field of one of the city's signature buildings would give fans a sense of place and provide grand shots for national television cameras. At Evans's urging, city planners recently stopped work by Lerner Enterprises on construction of a 130-foot office building on M Street SE, one block north of the stadium. People familiar with the matter said the move angered the company, founded and run by Theodore N. Lerner, who is among those bidding to buy the Nationals. City officials said late last week that they will allow the company to resume work because it has abided by city building regulations. Company officials declined to comment. Evans also has discussed limiting the heights of buildings being planned by Monument Realty, which owns land on N Street SE that abuts the stadium site. City planners worried that such a move would inadvertently harm the creation of an entertainment and shopping district around the ballpark, which has been promised by another powerful player, the Anacostia Waterfront Corp." The article also says that groups are bickering over who has final say on the design. The stadium is supposed to begin construction in March, 2006.

 




                  © Copyright 2024 JD.