Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Mar 06, 2015
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

* The restaurant group that owns a slew of Capitol Hill and Near Southeast restaurants, including the Park Tavern and Willie's Brew & Que, has now exited bankruptcy. (Hill Rag)
* Some additional information about the Display Ship Barry's impending departure, including that the hull is apparently structurally sound and so it's expected the ship will be towed away, as opposed to be being dismantled in place. Also, the Navy "has not yet made a decision about replacing Barry with another decommissioned ship, and there is no timeline for doing so." (USNI News)
* Bisnow takes a look at the city's "fastest-growing neighborhood," though, ahem, the ballpark was not built in 2005, guys. (Bisnow)
UPDATE: Extra-special last-minute tidbit:
* A crane will be arriving at the Community Center site next week to place the steel for the gymnasium, which is good in terms of progress but which is bad in terms of the fact that it's going to take up a bunch of parking spaces on L and then around and up 5th Street. It is expected that these parking spaces will not be available at all next week. After the gym steel work is done, though, the crane will move onto the construction site itself.
 




                  © Copyright 2024 JD.