Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Jan 16, 2007
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

As I posted last week, the Nexus Gold Club is auctioning off its furnishings and, more interestingly, its nude dancing license tomorrow (Tuesday), and today the Post picks up the story. One piece of news, JPI says that the demolition of the site (which will eventually be home to the 909 New Jersey Avenue residential project) will begin in March. On the same page as the Post story, there's also a box with a short piece on the surprising move by Jack Evans reported last week to abolish both the Anacostia Waterfront Corporation and the NCRC. UPDATE: Here's an Examiner article noting that Tommy Wells, the new Ward 6 council member whose district includes a lot of the Anacostia Waterfront, is "not convinced that legislation proposed Tuesday to dissolve a District organization charged with the redevelopment of the Anacostia River's waterfront is the best way to proceed. [...] Wells campaigned in part on redeveloping the Anacostia's waterfront into a walkable community for families, with green space, shops and restaurants. He said Friday he wondered whether putting Mayor Adrian Fenty's administration in charge of redeveloping the waterfront now is prudent considering his desire to take over the District's schools."
UPDATE, 1/16: The Post reports that no one ended up bidding on the Nexus nude dancing license, perhaps because the minimum required bid was set at $2 million. But they have a cute little sidebar noting the prices that some of the furnishings went for--the 13-foot brass dancing poles went for $50.
UPDATE, 1/17: Oops, I dropped a rather important part of the Tommy Wells quote above. He is quoted as saying he is "not convinced" the legislation is the best way to proceed.
 

No doubt there will be more official announcements coming from DDOT, but in my quest to get you information lickety-split, I point you to this post on the MPD 1D message board: "The Frederick Douglass Bridge main span and approach ramps will undergo significant repair work during this year, effective this month. Repair work consists of steel repairs, deck joint replacement, concrete repairs and painting of bridge thus these repairs necessitate the closure of the bridge which will effect the ingress and egress of DC residents, DC govt employees. Traffic will be advised by a Changeable Message Sign Board daily that drivers should use the 11th St. Bridge as a major detour route during times the Douglas bridge is closed. The following schedule has been tentatively put out -- please share with coworkers, neighbors." It shows scheduled weekend closures (from Fridays at 10 pm to Mondays at 4 am) on various dates starting Jan. 26, and also mentions that the entire span will be closed from after July 4 through the end of August--I believe (but do not know with 100% certainty) this will be the dismantling of the viaduct so that the bridge exit onto South Capitol Street reaches street level at Potomac Avenue rather than O Street. As I said, I know more will be coming from DDOT, and I'll post it as soon as I have it. I'll also put all the scheduled closures on my Calendar of Events once they come from DDOT.