Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Dec 10, 2017
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

If you are interested in participating in the Environmental Assessment process for the redesign of Southeast Blvd., the second public meeting is scheduled for Monday night, Dec. 11, from 6:30 pm to 8:30 pm at Chamberlain Elementary School, 1345 Potomac Ave., SE.
This time around the session will be an "interactive group activity," and will also include unveiling the draft concepts for remaking the stretch of road between 11th Street SE and Barney Circle into an "urban boulvard," which would include raising the street up to the same level as L Street SE to the north, establishing connections to 13th, 14th, and 15th Streets, SE, adding pedestrian and bicycling facilities, and sneaking in some tour bus parking underneath the raised road as well. The possibility of some of the right-of-way being used for residential or other development is also part of the study.
See the official project web site for more details, or scroll through my many posts on it over the years.
 




                  © Copyright 2025 JD.