Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Nov 01, 2017
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

On the heels of my previous post on the changes coming to I Street SE, here's some specifics from CSX on its current timetable for the restoration of Virginia Avenue as the tunnel project begins to see the light at the end of, um, itself.
As the graphic at right from this presentation shows, it appears that the 300 block of Virginia is at the top of the restoration list, with the street itself expected to open in Spring 2018. The 200 and 400 blocks would follow in early summer, with the blocks from 5th to 9th following in late summer. This schedule also includes the restoration of the connection under the freeway to Garfield Park in early summer, and Virginia Avenue Park later in the year.
There will be some full closures of the cross streets as they get restored, with the diciest ones probably being 4th Street (expected to close from February into summer) and that bizarro 5th/6th intersection (which this says will be closed from late this year into spring).
As for what Virginia Avenue will look like when "restoration" is complete, here are the graphics from CSX, showing among other things the new separated pedestrian and cycling paths, including a cut-through path on that 4th Street triangle to allow bikes to hook up easily with I Street, the main east-west bicycle route in this neck of the woods. (Yeah, even when you click to enlarge they are tiny. Here's the PDF.)
It's rather stunning to me to actually be seeing a timeline like this--I've been writing about this project for a looooooooooong time. As to whether everything does wrap up in 2018, of course We Shall See.
 

In recent months (mostly during the time I was preoccupied) DDOT has been working on plans to reconfigure I Street SE between New Jersey and South Capitol to better handle the large amount of vehicle, bicycle, and pedestrian traffic on a road that once was sleepy but now most decidedly is not.
This Satuday, Nov. 4, DDOT representatives are holding a public meeting on what is officially known as the I Street SE Pedestrian and Bicycle Safety Improvements Project. It's at 11 am, and instead of in a stuffy conference room, the meeting will be held on the south side of I Street SE at Half Street SE (so, dress appropriately!).
Up for discussion will be a final design for this four-block stretch, which (if I am reading the graphics right) calls for the shifting of bike traffic on the blocks between South Capitol and 1st into protected lanes along the curb, with the parking lanes then acting as buffer between bikes and the traffic lanes. Vehicle lanes will still be a single lane in each direction as well as a center turn lane. There will also be flexposts at some of the intersections to prevent cars from taking turns too sharply in a way that endangers pedestrians and cyclists.
At right is a portion of the section between Half and 1st (see what I mean about "deciphering"), but if you are willing to test your ability to read traffic engineering graphic design, you can see the entire layout here.
If you have feedback, wander on by the assembly at Half and I at Saturday at 11. You can probably even bring your dog.
 




                  © Copyright 2026 JD.