Please note that JDLand is no longer being updated.
peek >>
Near Southeast DC Past News Items: Oct 01, 2009
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


2 Blog Posts

From this Examiner story about today's various National Capital Planning Commission actions, news that not only did the commission (as expected) give approval to the conceptual designs for Canal Park, but that the park's development association is needing more money to complete the project: "But designs have already surpassed the $13.5 million grant the CPDA received from the D.C. Office of the Deputy Mayor for Planning and Economic Development. [CPDA executive director Chris] Van Arsdale estimates an $18 million total cost based on the design approved by NCPC, which includes a large playing field, a rain garden and a plaza that would accommodate in-ground water fountains in the summer and an ice rink in the winter. Van Arsdale said CPDA was trying to use new market tax credits through the Treasury Department to raise the millions still needed for the project."
Comments (0)
More posts: Canal Park
 

On Tuesday reader F. reported that the long-dormant Exxon at South Capitol and I was being demolished; and today neighboring blogger DG_Rad has Tweeted that the not-quite-as-long-dormant Exxon at 11th and M is being torn down today. There's been no big movements that I've heard for either of these lots, both of which were "sold" by the main ExxonMobil Corporation to its nonprofit ExxonMobil Foundation. Perhaps the city's recent blighted property tax doings spurred the demos?
For those of you who haven't been around for the long haul, let's revisit the tale of when the South Capitol Exxon went out of business:

[Here's the] link to a DOJ press release [now dead, alas] from January detailing that the Exxon's owner pleaded guilty "to fraudulently double-billing government contractors more than $120,000. [Mahmud] Rashid, 46, of Raleigh Lane, Stafford, Virginia, entered a plea of guilty yesterday in United States District Court to one count of wire fraud. According to the terms of the plea agreement, Rashid could be sentenced to between 12 to 18 months of incarceration when he is sentenced before the Honorable Richard J. Leon on June 2, 2006."

 




                  © Copyright 2024 JD.