Demolition at
Capper/Carrollsburg has moved over to the block bounded by 2nd, 3rd, L, and M streets, the last location of demolishment in this first phase. My guess is that this spot is being cleared to help pave the way for the construction of an office building at 250 M Street, although I have no news on a timetable for that. (250 M will not actually take up that entire block, it should be noted--it will front M Street, with its footprint being pretty much the parking lot that's currently there.) The 4th/5th Street demolition is in the clean-up phase (taking away the piles and smoothing the lots). And within the past few days fence stakes have appeared around the Capper buildings in the 4th/I/3rd/K block. I don't think demolition will begin there anytime soon, but those buildings are probably now cleared of tenants, and so can now be fenced off.