WTOP reports on
four possible designs for the new
South Capitol Street Bridge. The article is somewhat confusing (although maybe it's my stadium hangover), but it does say that construction of the "moveable" bridge won't begin until 2011 (for non-bridge-o-philes like me, "moveable" means a drawbridge, not that the bridge itself will move--the bridge needs to be able to allow ships to reach the
Navy Yard). However, the existing bridge also needs work so that it can remain in service while the new bridge is built. There's also mention of a "first phase" that will convert South Capitol Street from an expressway to a boulevard--I think that's the improvements to
South Capitol Street that are coming this summer, not as a beginning phase of construction in 2011. (I'd tell you more about the plans for work on South Capitol Street this summer, but alas the
DDOT web site doesn't have anything, at least not that I can find.) And, if you use the bridge frequently, be prepared, the article says that it's possible it will have to be closed during August 2006. More as I find out.