peek >>
Near Southeast DC Past News Items: Feb 09, 2015
In the Pipeline
25 M
Yards/Parcel I
Chiller Site Condos
Yards/Parcel A
1333 M St.
More Capper Apts.
Yards/DC Water site
New Marine Barracks
Nat'l Community Church
Factory 202/Yards
SC1100
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)
 
Go to Full Blog Archive


1 Blog Posts

In the wake of the Jan. 28 "design slam", the team working on the plans for the renovations of Van Ness Elementary is circulating a document with some of the results of that effort, which includes first renderings of what the school's exterior could look like, showing the plans to add one story onto the building's south wing, which you can compare to the current view to orient yourself (click to enlarge):
The first phase of renovations will apparently focus on the first two floors of the building's main wing along 5th Street, where the Preschool, Pre-K, and Kindergarten classrooms will be when the school reopens this fall. There would also be a reworked a reworked entrance to level the door with the first floor, and temporary parking and play areas in the courtyard on the building's northeast side.
Draft interior schematics show that south wing could eventually include the gym/auditorium and the cafeteria on its first floor. and a media center, computer lab, music/art rooms on the second, with green roofs and facing bringing the south end's exterior height up to match the 5th Street wing.
If you are wanting to get involved in the run-up to Van Ness's reemergence, the Van Ness Parent Group is the place to go.
(And one of these days I'll create my own Van Ness project page!)
UPDATE: There is also now a DC Department of General Services project page for the Van Ness renovation, with a great archive of documents from the process.
Comments (1)
More posts: Van Ness Elementary
 




                  © Copyright 2023 JD.