Since January, 2003
            
 (a random before-and-after moment)
November 2004
July 11, 2018
3rd at K, Looking Southeast (see more)

Lerner Enterprises announced today that construction will begin this summer on 20 M Street, a 10-story 190,000 sq ft office building, with completion scheduled for Summer, 2007. The property, designed to be "Green" and which will also have retail on its first floor, is on the northwest corner of the Half and M intersection (currently a parking lot), diagonally across from the Navy Yard Metro station and one block north of the new Nationals stadium site. No tenants have been announced. Whiting-Turner will be the general contractor. You can see a few photos on my M Street page, and I guess before long I'll be creating a 20 M page!

Comments (0)
   
 
 More About 20 M
 All posts: 20 M

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

jdc on Don't Call it: Concrete barriers also long 1st St on the side with the currently empty expanse.
walt on Don't Call it: Re: Changes around Nats Park: Today on my way out, I noticed: 1. Installatio...
walt on Don't Call it: Re: rebuilding the senior center. I'm sure there's a good reason for this, so ...
ValveetaChz on Don't Call it: Any word about square 767? There been not one peep from DCHA!
NavyYardGuy on Don't Call it: @JDland -- I get it totally. Go nats!
202_cyclist on Don't Call it: @GarfieldPark-- Yes, someone was saying that we can only speculate who Giuliani ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 10/20/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/17/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/13/19
80 M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/11/19
100 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/10/19
500 B/O L ST SE   THEFT
Theft First Degree (all Other Larceny)
 10/08/19
1400 B/O 11TH ST SE   ASSAULT WITH A DANGEROUS WEAPON  10/08/19
1200 B/O VAN ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/03/19
1200 SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/03/19
1100 B/O HALF ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 10/02/19
800 B/O VIRGINIA AVE SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 10/02/19
700 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/24/19
900 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 09/23/19
1200 B/O 1ST ST SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 09/23/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/21/19

Recent Issued Building Permits Archive  
1300 4TH ST SE   
10/07/19 
DFM DEVELOPMENT SERVICES, LLC / ARI BELMONTE; KONE
EN1903394 / SHOP DRAWING
Installation of (2) MRL KONE elevators in single hoistway. 15 Landings.
900 5TH ST SE   
10/08/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / TIMOTHY S CLEMONS; TIMOTHY S CLEMONS
M2000081 / SUPPLEMENTAL
   
10/08/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / RICHARD V CAREY; RICHARD V CAREY
P2000201 / SUPPLEMENTAL
   
10/15/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / WILLIAM B. CRIST; WILLIAM B. CRIST
E2000633 / SUPPLEMENTAL
1037 5TH ST SE   
10/18/19 
JOHN P LANG / SOLAR SOLUTION DC LLC; SOLAR SOLUTION DC LLC
SOL1901920 / CONSTRUCTION
To install 4.29 kW size of solar panels with a system height of 1.1 feet on roof of building,
4 I ST SE   
10/07/19 
CRESECENT CAPITOL VIEW MF LL / KIM MITCHELL; BEN KUNKLE
B1912371 / CONSTRUCTION
Third Party Review - Revision to Permit B1804349 (Approved Under the Velocity Program),Revision associated with additional occupiable spaces provided at the "Roof Floor" with corresponding egress, revised common space layouts and corresponding use and occupancy calculations, revisions to ground floor retail south entrance and amenity spaces at the ground level.
409 I ST SE 20003   
10/11/19 
JOSEPH KOCH / null
P2000322 / SUPPLEMENTAL
409 I ST SE   
09/27/19 
JOSEPH KOCH AND ELLEN FONG / ELIZABETH S MITCHEL; ELIZABETH S MITCHEL
B1915266 / CONSTRUCTION
Interior alteration including new kitchen, master bathroom and loft.
   
10/15/19 
SCOTT A FAULK TRUSTEE / FRED LATIMORE
E2000620 / SUPPLEMENTAL
100 M ST SE 200   
10/09/19 
SQUARE 743 INC / ;
P2000249 / SUPPLEMENTAL
100 M ST SE 7TH FL   
09/26/19 
SQUARE 743 INC / ;
P1909869 / SUPPLEMENTAL
100 M ST SE 7TH FLOOR   
10/03/19 
3NW 100 M STREET LLC / DANNY L COLEY; DANNY L COLEY
E2000146 / SUPPLEMENTAL
100 M ST SE   
09/24/19 
SQUARE 743 INC / PHILIP J. MISEY; PHILIP J. MISEY
E1911913 / SUPPLEMENTAL
   
09/25/19 
SQUARE 743 INC / NAVID PARTOVI; NAVID PARTOVI
M1904391 / SUPPLEMENTAL
   
09/27/19 
SQUARE 743 INC / MIGUEL A. MOROTE; MIGUEL A. MOROTE
E1912028 / SUPPLEMENTAL
250 M ST SE   
09/26/19 
SQUARE 769 LLC / JEFFREY D WOLF
AH1901292 / CONSTRUCTION
After Hours permit is respectfully requested from 3 am to 7 am daily.
   
10/03/19 
SQUARE 769 LLC / STEVEN CHEN
AH2000003 / CONSTRUCTION
Work Onsite Only - Columbus Day
300 M ST SE   
10/01/19 
FEDERAL CENTE LP C/O CHARLES E SMITH / DANI B RADOYE; TBD
B1908440 / CONSTRUCTION
interior build out new tenant into existing space to include installation of cabinetry, flooring, wall base, ceiling system, and light fixtures, hvac system and distribution / difusers, electrical panel / equipment, accessible restrooms,drinking fountain and service sink. First 1st floor only.
   
10/17/19 
FEDERAL CENTER LP / SUKWON KIM; SUKWON KIM; NA
SG1900286 / CONSTRUCTION
To install a set of illuminated LED channel letters on raceway onto wall
139 N ST SE 19714   
10/01/19 
DISTRICT OF COLUMBIA / MIKE BOONE
AH1901332 / CONSTRUCTION
PEPCO-WO#1588714505-ALLEN / EFF / PATRICK-CREWS WILL BE CHANGING A TRANSFORMER.
861 NEW JERSEY AVE SE   
10/09/19 
GRAYSTAR GP 11,LLC / KIM MITCHELL; NA TBD
SH1900078 / CONSTRUCTION
Phase 2 - Excavation and support of excavation within 50' of DC Water Trunk Sewer line include pile installations
1275 NEW JERSEY AVE SE 20003   
10/14/19 
BROOKFIELD PROPERTIES / null
P2000362 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE STE# 102A   
10/17/19 
SQUARE 742 LLC / STEPHEN TAYLOR; CHRIS PADBERG
B1913851 / CONSTRUCTION
Convert 'office' tenant space to 'The UPS Store'. Interior work only. minimum work done. 990 sq ft. No plumbing. Change diffusers and ceiling tiles. Install UPS furniture and add a few outlets.
1100 NEW JERSEY AVE SE   
09/26/19 
SQUARE 742 LLC / ;
P1909863 / SUPPLEMENTAL
   
10/01/19 
SQUARE 742 LLC / SUKWON KIM; SUKWON KIM; JJ ELECTRIC SERVICE, INC
SG1900513 / CONSTRUCTION
To install a set of LED channel letters "SUBWAY"
   
10/17/19 
SQUARE 742 LLC / WILLIAM SNODDY; TBD
B1915102 / CONSTRUCTION
Revision to previous permit number B1911194 Expansion of Tenant's Current suite into Adjacent Suite has already been "white boxed". Expansion space to consist only of workstation and Offices. Some Minor Demolition will occur in tenant existng suite in order to rework existing tenant entry and enlarge tenant reception. addition of storage closet will be added in place of existing corridor.
   
10/17/19 
SQUARE 742 LLC / WILLIAM SNODDY; CHRIS CONDON
B1913780 / CONSTRUCTION
Tenant Finish Out. Existing Conditions to be Demolished and New Space Built to Landlord Standards to Include new Ceiling grid lighting and Finishes **LEVEL 2 ALTERATION
1275 NEW JERSEY AVE SE   
10/03/19 
UNITED STATES OF AMERICA / JUSTIN BELLOW;
SH1900050 / CONSTRUCTION
Sheeting and shoring for new building
1299 NEW JERSEY AVE SE   
09/24/19 
UNITED STATES OF AMERICA / FRED T FALCONE; FREE STATE DRILLING INC
SB1900446 / CONSTRUCTION
Six 7 inch hollow stem auger probe borings to 60ft and the installation of 2.75inch inclinometer casing.
301 TINGEY ST SE C-1   
10/03/19 
SEFC 160, LLC / JEFF NOLD
AH2000017 / CONSTRUCTION
CCTV Inspection of sewer system. on 3rd Street SE btween Tingey St. & Water St.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.