-- Winner of the 2008 Knight-Batten Citizen Media Award for Innovations in Journalism --
September 22, 2004 May 6, 2008
Half at O, Looking South (see more)      Choose Another Spot | JD's Favorites
 
 
See what happens when someone with a digital camera
gets way too interested in a neighborhood.
Follow jdland on Twitter
· Details on small tweaks to the Union Station-Navy Yard Circulator line: link (and yakking about the old @DDOTDC photos) (2:41 PM 9/2)
· Eleanor Holmes Norton weighs in on the Marine Barracks' site search: link (hint: she's not thrilled with it) (12:53 PM 9/2)
· Eggscellent! RT @DDOTDC "A Freeway Runs Through It." what SE/SW looked like when constr began 43 yrs ago link (12:34 PM 9/2)
· City Block peeks at some low-impact development/biofiltration areas on 3rd St SE north of the Yards Park: link (10:52 AM 9/1)
Latest News
ANC 6D Report #3: Newest Florida Rock Design
The last Near Southeast item on Monday's ANC 6D meeting was a request for the commission's support of the latest design of RiverFront on the Anacostia, better known as Florida Rock. This is the nearly six acres of land directly south of the ballpark, on the Anacostia River, where developers have spent 10 years trying to transition away from the concrete business currently operating there to a 1.1-million-square-foot mixed-use waterfront destination. They came close to an approved design in 2006, but in February 2007 the Zoning Commission unexpectedly sent the architects back to the drawing board, wanting a greater amount of residential space in the project, better views to and from the ballpark, and a better "expression of place."
After nearly a year, a revised design is ready to go to the Zoning Commission for approval. It now includes 323,000 square feet of residential space, 80,000 square feet of retail and 465,000 square feet of office space.
Some of the ideas floated early in the redesign process have been modified or removed, most notably "The Pitch", the plaza directly across from the ballpark's grand staircase and adjacent to the planned Diamond Teague Park. This space no longer has pitcher and catcher statues but is instead now a "festive" open plaza that will be more "integrated" with Teague and will help with the expected flow of ballpark visitors coming to and from the water taxi piers that someday may materialize out by the little red brick pumphouse.
Also, the residential and hotel buildings have had their heights grow to 130 feet, to allow for the extra square footage the zoning commission wanted. But the hotel's top two floors will now be "pure residential".
As for when some movement will actually be seen at the site, David Briggs of Holland & Knight set out a timeline based on zoning approvals, construction drawings, and the vaunted DC permitting process that estimates the start of construction on the first phase (the eastern office building) in probably fall of 2009.
He mentioned a number of times the amount of pressure that Florida Rock is under to shut down the concrete plant and to build temporary parking lots, but he explained that the site currently makes money for its company and shareholders, and there's little interest in closing it down sooner than necessary. (Briggs did say that a temporary landscaping of the eastern plaza, next to Diamond Teague, could be a possibility once the zoning approvals are received, but that the underground parking for RiverFront does extend beneath that plaza, and so excavation and construction work will need to be done there.)
It should be noted that this timeline is really about the first two phases (the eastern office building and the 160-unit residential building), because the western office building and the hotel can't be built until the construction of a new Douglass Bridge allows Florida Rock to use its land that is currently occupied by the old bridge. (The year 2016 was tossed around as a possible date for when these later phases could get started.)
Community benefits remain similar to past presentations, including an estimated 25 units of workforce housing, anticipated LEED certification for the buildings, First Source and LSDBE hiring, and a combined underground loading dock for the three western buildings, as well as the more basic amenity of replacing a huge concrete plant with shiny new buildings and access to the waterfront. The ANC has always been enthusiastic about this project, and this time around was no different, with the commissioners voting 5-2 to support the new design. The Zoning Commission hearing, for what is officially considered a modification to the project's second-stage PUD, is scheduled for March 20.
I'm really trying to just hit the newsiest items here--definitely take some time to look through my RiverFront page (have to stop calling it Florida Rock sometime) for much more detail on the current design. And read all the archived news items, too, if you want a better feel for the twists and turns this project has taken.
Advertisement:

See All Current News Items | See Older News Items

Comments

Myron Cohn says: (Jan 20, 2008 09:22 AM)
Florida Rock Properties is a subsidiary of Patriot Transportation [patr on nasdq].Call it Patriot

JDLand Comments RSS Feed

Add a Comment:

Comments are closed for this post.

See All Current News Items | Browse Older News Items | Full Blog Archive

  Featured Projects 225 Virginia Avenue (the old Post Plant) 225 Virginia Avenue (the old Post Plant) Capitol Quarter, a Mixed-Income Redevelopment Capitol Quarter, a Mixed-Income Redevelopment A Complete Map and Directory of Past, Current, and Future Projects Reconstruction of the 11th Street Bridges The Washington Navy Yard The Yards Nationals Park Canal Park The Park at the Yards, to be Completed in Summer 2010 Diamond Teague Park and Piers The Park at the Yards Diamond Teague Park and Piers 1015 Half Street, Construction Currently Halted 1015 Half Street, Construction Currently Halted Rail and Bus Info Rail and Bus Info US Department of Transportation HQ Capper/Carrollsburg Hope VI Redevelopment Boilermaker Shops Retail Justin's Cafe, a New Restaurant Scheduled to Open this Spring Justin's Cafe, a New Restaurant Scheduled to Open this Spring Full Directory of Current and Future Developments Foundry Lofts
Recent Reader Comments:  
JT on Norton Objects to: The "force protection" issue is a red herring unless the Marines also plan to relocate the historic ...
MJM on Norton Objects to: I'm sure some action officer is preparing a bunch of powerpoint slides to answer those questions - t...
Jason on Norton Objects to: @Andrew - force protection of what? Who's going to invade Barracks row? When's the last time this gr...
Andrew in DC on Norton Objects to: Ugh, I find myself in the uncomfortable position of agreeing with her stance even if I find her logi...
Latest News
       
For past mile markers in the neighborhood's evolution,
see my Near Southeast DC Timeline.

Thousands and thousands of photos showing the neighborhood changing. More than 150 buildings no longer with us. All the news, since 2003. Photos from various archives showing the neighborhood in the more distant past. Maps from the early 1900s. Overhead Photo Comparisons: 1949, 1988, 2002-2008. All Blog Entries, 2003 - Present Major Events, 1799 - Present A series of blog entries looking at the neighborhood's history.


Blog Post Tag Cloud:
 1000 south capitol   100 m   1015 half   1100nj   1100 south capitol   1111 new jersey   11th street bridges   20 m   225 virginia/old post plant   23 i   250 m   400m   401 m/yards   50m   600 m/square 882/old capper seniors   70/100 i   800 nj/120 canal   801va   816-20 potomac   900m   909 new jersey   alcohol/liquor licenses   akridge/half st.   anc news   artomatic   anacostia waterfront corp.   barracks   capitol riverfront bid   pedestrian/cycling issues   blue castle   boathouse row   boilermaker shops/yards   the bullpen   canal park   capper   capper new apt bldgs   capper senior apt bldgs   capper seniors/900 5th st.   capitol quarter   capitol hill tower   casa degli angeli   chiller site/wmata   circulator   community center   cornercopia   crime   csx/virginia ave. tunnel   what's the deal?   us dept. of transportation hq   trash transfer site/dpw   8th street   east of 11th street   earth conservation corps   exxon697n   factory 202/yards   florida rock   restaurants/nightlife   foundry lofts/yards   harry's spirits   inauguration09   justins cafe   little red bldg/parkway spirits   maritime plaza   courtyard/marriott   metro   mnorth   monument/half st.   monument/south capitol st.   m street   navy yard   new jersey ave.   onyx   parking   politics   rearview mirror   retail   riverwalk   jdland stuff   south capitol st.   douglass bridge   spayclinic   square 743n   plaza on k/square 696   square 697   square 697n   square 698   square 699n/velocity   square 740   square 906   square 976   nationals park   stadium events   streetcars   teague park   traffic   virginia ave park   van ness elementary   dc water (wasa)   water taxis/riverboats   square 701   the yards   yards/parcel a/nga   yards/parcel h   yards/parcel o/trapeze school   yards park   zoning 


Near Southeast's Rearview Mirror Today in (Recent) Near Southeast History

City Government Data for Near Southeast
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
blocksiteaddress offense method reporttime
700 B/O M ST SE   STOLEN AUTO  STOLEN AUTO  08/30/2010
800 B/O L ST SE   THEFT F/AUTO  2  08/25/2010
100 B/O M ST SE   THEFT  2  08/24/2010
900 B/O POTOMAC AVE SE   THEFT F/AUTO  2  08/24/2010
2ND ST SE & K ST SE   ROBBERY  F&V  08/22/2010
UNIT B/O L ST SE   STOLEN AUTO  STOLEN AUTO  08/17/2010
UNIT B/O L ST SE   STOLEN AUTO  STOLEN AUTO  08/17/2010
700 B/O VIRGINIA AVE SE   THEFT F/AUTO  2  08/06/2010

Recent Public Space Permits Archive  
siteaddress permittee/status applicationtime expirationtime
11TH ST SE & M ST SE   Lance Percich / IN-EFFECT
excavation; new  
 07/09/2010   09/03/2010
906 3RD ST SE   ACCURATE INFRASTRUCTURE DATA INC. / IN-EFFECT
excavation; new  
 06/23/2010   09/15/2010
20 M ST SE   Wash Gas & Light Co. / ISSUED
excavation; new  
 06/09/2010   09/25/2010
1200 NEW JERSEY AVE SE   Chris Holben / ISSUED
streetfixture; new  
 07/20/2010   09/30/2010
1201 M ST SE   WASHINGTON GAS & LIGHT CO / IN-EFFECT
excavation; new  
 05/13/2010   10/01/2010
201 I ST SE   Wash Gas & Light Co. / IN-EFFECT
excavation; new  
 06/17/2010   10/04/2010
1201 M ST SE   E2CR INC / IN-EFFECT
excavation; new  
 07/14/2010   10/09/2010
308 I ST SE   Feza Koprucu / ISSUED
streetfixture; new  
 08/24/2010   10/29/2010
156 L ST SE   THUY LE / IN-EFFECT
excavation; new  
 08/11/2010   10/31/2010
2ND ST SE & L ST SE   PEPCO / ISSUED
excavation; new  
 07/07/2010   11/02/2010
11TH ST SE & M ST SE   PEPCO / ISSUED
excavation; new  
 07/21/2010   11/08/2010
1015 HALF ST SE   HALF STREET SE LLC C/O DOUGLAS WILSON COMPANIES INC / IN-EFFECT
paving; streetfixture; new  
 08/18/2010   11/30/2010
11TH ST SE & M ST SE   E2CR Inc / PENDING
excavation; new  
 08/06/2010   01/01/2011
1015 HALF ST SE   Wash Gas & Light Co. / ISSUED
excavation; new  
 07/14/2010   01/03/2011
4TH ST SE & TINGEY ST SE   E2CR Inc / PENDING
excavation; new  
 08/06/2010   01/24/2011
1005 5TH ST SE   VISTA CONTRACTING / IN-EFFECT
excavation; new  
 05/19/2010   01/31/2011
1025 1ST ST SE   Justin Ross / IN-EFFECT
streetfixture; new  
 05/10/2010   03/08/2011
1100 NEW JERSEY AVE SE   Capitol Riverfront Business Improvement CR BID / ISSUED
; new  
 03/23/2010   04/04/2011
1500 SOUTH CAPITOL ST SE   / PENDING
 
 08/24/2010   05/31/2011
200 K ST SE   Cris Flack / IN-EFFECT
paving; streetfixture; landscaping; excavation; new  
 05/19/2010   06/17/2011
1100 NEW JERSEY AVE SE   mostofa mohammad / IN-EFFECT
; new  
 06/02/2010   06/26/2011
1111 NEW JERSEY AVE SE   COLIN CLARK / IN-EFFECT
excavation; new  
 06/15/2010   08/16/2011

Recent New Approved Building Permits Archive  
full_address owner_name/descofwork status issue
1201 M ST SE   WASHINGTON GAS LIGHT CO /
REGRADING OF EXISTING OT APPROX. 2 200 SQUARE FEET DISTURBANCE TO STABILIZE EXISTING SLOPES  
ISSUED/
B1009160/
CONSTRUCTION
 08/30/2010
308 I ST SE   FEZA KOPRUCU /
IRON FENCE AROUND FRONT YARD.  
ISSUED/
F1000290/
CONSTRUCTION
 08/24/2010
300 M ST SE UNIT 6TH   FEDERAL CENTER LP / KEWAL K. KHATTA (AFO)   ISSUED/
M1002063/
SUPPLEMENTAL
 08/24/2010
910 3RD PL SE   CAPPER RESIDENTIAL II LP C/O EYP / DAVID FONTANA (AFO)
NEW 3-STORY 3-UNIT APARTMENT WITH NO REQUIRED AUTOMOBILE PARKING AS PER Z.C. ORDER NO. 03-12 03-13. (ACC TYPE M RENTAL UNITS).  
ISSUED/
B1007061/
CONSTRUCTION
 08/20/2010
305 L ST SE   CAPPER RESIDENTIAL II LP C/O EYP / DAVID FONTANA (AFO)
CONSTRUCT NEW SFD AS PART OF PUD CASES 03-12 03-13. NEW UNIT TYPE P SFD. THIRD PARTY REVIEWED PLANS. PROPERTY IS CURRENTLY VACANT LAND.  
ISSUED/
B1007074/
CONSTRUCTION
 08/20/2010
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TN = Tent; RW = Retaining Wall;

Recent Service Requests Archive  
siteaddress servicecodedescription/resolution serviceorderstatus serviceorder
6TH ST SE & VIRGINIA AVE SE   Parking Meter Request  OPEN  09/01/2010
931 5TH ST SE   Trash Container - Delivery  OPEN  09/01/2010
1108 3RD ST SE   Parking Meter Request  OPEN  09/01/2010
1201 4TH ST SE   Parking Meter Request  OPEN  08/31/2010
25 N ST SE   Parking Meter Request  OPEN  08/31/2010
1015 HALF ST SE   Parking Enforcement  OPEN  08/31/2010
1000 3RD ST SE   Residential Parking Permit Violation / Not Enforceable - Close SR
304 / 3176 THERE WERE NO VIOLATIONS AT 12:48PM  
CLOSED  08/30/2010/
  08/31/2010
M ST SE & NEW JERSEY AVE SE   Parking Meter Request  OPEN  08/29/2010
M ST SE & NEW JERSEY AVE SE   Parking Meter Request  OPEN  08/29/2010
200 M ST SE   Street Cleaning  OPEN  08/29/2010
415 L ST SE   Bulk Collection  OPEN  08/28/2010
I ST SE & NEW JERSEY AVE SE   Parking Meter Request  OPEN  08/28/2010
I ST SE & NEW JERSEY AVE SE   Parking Meter Request  OPEN  08/28/2010
I ST SE & NEW JERSEY AVE SE   Parking Meter Request  OPEN  08/28/2010
I ST SE & NEW JERSEY AVE SE   Parking Meter Request  OPEN  08/28/2010
1111 NEW JERSEY AVE SE   Parking Meter Request  OPEN  08/28/2010
1ST ST SE & I ST SE   Parking Meter Request  OPEN  08/27/2010
301 TINGEY ST SE   Parking Meter Request  OPEN  08/26/2010
331 VIRGINIA AVE SE   Parking Meter Request  OPEN  08/26/2010
400 L ST SE   Parking Meter Request  OPEN  08/26/2010
1ST ST SE & I ST SE   Parking Meter Request  OVERDUE CLOSED  08/25/2010/
  08/31/2010
75 N ST SE   Parking Meter Request  CLOSED  08/25/2010/
  08/29/2010

Recent Real Property Sales Archive  
No records added or modified since 08/19/2010.


Links of Interest

JDLand.com Wins 2008 Knight-Batten Citizen Media Award
As part of the Knight-Batten Awards for Innovations in Journalism, JDLand was given the 2008 Citizen Media Award. Read all about it.

Capitol Riverfront Business Improvement District
Covering Near Southeast & Buzzard Point.

Studies/Initiatives/Government Documents:
11th Street Bridges EIS
South Capitol St. Bridge EIS
South Capitol Gateway Corridor/Anacostia Access Study
Anacostia Riverwalk Trail
NCPC's New Vision for South Capitol Street (2005 Update)
Anacostia Waterfront Initiative (2005)
Near Southeast Draft Urban Design Framework (2003)
Urban Land Institute South Capitol Street Corridor Report (2003)
Neighborhood Strategic Action Plan (2002)
DC Light Rail Project (may run down M Street SE someday)

Capitol Gateway and Southeast Federal Center Zoning Overlays
Two documents that spell out in extreme detail exactly what the requirements are for developments along South Capitol, M, in the Ballpark District, and at "The Yards". Read also my short explanatory treatise on these two overlays.

Pre-Redevelopment Media Overviews:
A Transformed Neighborhood Awaits Stadium (WP, 8/15/05)
      includes huge map of development plans
The Morphing of a Forgotten Neighborhood (WP, 9/2/2004, PDF)
      A brilliant take on the neighborhood!
Betting Big on Near Southeast (WP, 7/15/04)
Hope for the Waterfront (WBJ, 01)
Seeking a Better View On the Waterfront (WP, 3/8/98)

Capitol Riverfront Promotional Video (May 2007)
From the Washington DC Economic Partnership, a new web site with a five-minute video promoting the $13 billion in investment that is coming to Near Southeast, the Southwest Waterfront, and Poplar Point. Lots of statistics and snazzy computer graphics show what the neighborhoods could look like in just a few years.

DC Government
Mayor's Office/News Releases
Planning/Economic Development (News)
   Office of Planning (News)
DC Consumer & Regulatory Agency
DC Office of Zoning
DC Municipal Regulations | Zoning
DC Dept. of Transportation

DC City Council
Tommy Wells (Ward 6 Council Member)

ANCs: 6D | 6B
Police: MPD-1D | PSA 105

Other Organizations
National Capital Planning Commission
Earth Conservation Corps
Capitol Hill Restoration Society
Barracks Row Main Street
Marines Community Integrated Master Plan
 

News Publications
The Hill Rag
The Southwester Newspaper

Other DC Neighborhood/City Blogs
And Now, Anacostia
SW DC - The Little Quadrant That Could
The Hill is Home
Penn Quarter Living
Frozen Tropics (Trinidad/H Street)
The Triangle
14th and You
The 42
Greater Greater Washington
Beyond DC
WashCycle
Richard Layman
 




Top of Page | Contact JD | Advertise on JDLand
Near Southeast RSS Feed

© Copyright 2010 JD.
All photos © Copyright JD - See information on photo uses, licensing and purchasing.