Since January, 2003
            
 Page Through from Before to After

More non-stadium news! I've got a tidbit or two on the Capitol Hill Tower project, as it heads toward the finish line. The Courtyard by Marriott hotel that makes up the southern portion of the block is anticipating an opening date of March, 2006 (I'll let you know when reservations start being accepted). Also, the site's developers are working on filling the 9,000 sq ft of ground floor retail that's available--a drycleaners has already been lined up, and there are hopes that a restaurant can be brought in as well. I've added a new rendering of the Courtyard elevation along L Street to my Capitol Hill Tower page--and I'm embarrassed at how the photos on that page are getting way out of date, I'm going to do some mammoth photography sessions next week, I promise. UPDATE: And I also hear that an on-site Sales Center for the residential/co-ops side of the project will be opening soon. The residences are supposed to open sometime in the second quarter of 2006. UPDATE II: And coffee lovers will rejoice to hear that there's also going to be a mini-Starbucks counter in the lobby of the hotel!
Comments (0)
   
 
 More About Capitol Hill Tower

JDLand.com Home

Comments

Sorry, comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

dcgent on Inching from Quarantining: Secon try on Bammy link https://dc.eater.com/2020/5/2nk9/21274400/bammys-caribbe...
dcgent on Inching from Quarantining: Another look at Bammy
jaal on Checking in From: @Sasq & @ Jscott280 Fellow envy here! Any updates on closing?
GaryRKarr on Inching from Quarantining: Looks like ColdStone Creamery is getting ready on Half Street.
Jscott280 on Inching from Quarantining: Apparently Bammy (in the old whaleys space) is opening up today for takeout ...
conngs0 on Inching from Quarantining: Heard the Navy Yard Bang is not on the main website any longer? Or is that becau...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/24/20
1200 B/O VAN ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/23/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/20/20
1100 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/19/20
1100 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/19/20
1200 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/17/20
100 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/15/20
1200 B/O 4TH ST SE   ASSAULT WITH A DANGEROUS WEAPON  05/12/20
300 B/O WATER ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/07/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/03/20
100 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/03/20
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/28/20
400 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 04/24/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-1   
05/14/20 
AP BOWER RETAIL LLC / null
P2006042 / SUPPLEMENTAL
1300 4TH ST SE   
05/08/20 
null / ;
P2005886 / SUPPLEMENTAL
   
05/15/20 
null / ;
P2006066 / SUPPLEMENTAL
929 5TH ST SE   
05/18/20 
CHRISTOPHER D FRENCH / CHRIS FRENCH; HERCULES FENCE OF MARYLAND, LLC HERCULES FENCE OF
F2000461 / CONSTRUCTION
1. Removal and replacement of front metal fence and gate in kind.  2. Removal and partial relocation of existing 6' tall wood fence in rear patio. The fence is currently approx. 30" inside the rear property line, and we intend to move the fence to our rear property line. The work includes removal of existing wood gate that opens from neighbor's property to our property along shared property line ...
300 M ST SE 4TH FL   
05/05/20 
FEDERAL CENTER LP / ;
P2005798 / SUPPLEMENTAL
250 M ST SE   
04/29/20 
SQUARE 769 LLC / TAMIKA STATON; OTIS
EN2001825 / SHOP DRAWING
Install 3 New Elevators - 3500Lbs @ 350FPM - Elevators 1 - 2 and 4
   
04/29/20 
SQUARE 769 LLC / TAMIKA STATON; OTIS
EN2001826 / SHOP DRAWING
Install 1 New Elevator - 4000Lb @ 350FPM - Elevator 3
   
04/29/20 
SQUARE 769 LLC / BRIAN C STROTT; NA
TL2000026 / CONSTRUCTION
9 story 173,125 GSF tenant improvement fit out.
   
04/29/20 
SQUARE 769 LLC / TAMIKA STATON; OTIS
EN2001827 / SHOP DRAWING
Install 2 New Elevators - 3500LB @ 200FPM - Elevators 5-6
300 M ST SE   
04/30/20 
FEDERAL CENTER LP / SAM HOLLEN; TBD
B2006591 / CONSTRUCTION
INTERIOR RENOVATION TO 5TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. NO STRUCTURAL. 4499 SQUARE FEET. NTT DATA.
   
05/01/20 
FEDERAL CENTER LP / null
E2007254 / SUPPLEMENTAL
   
05/14/20 
AMENTUM / null
E2007609 / SUPPLEMENTAL
111 N ST SE   
05/07/20 
BROOKFIELD PROPERTIES / MAHMOUD KHACHAN; NA
SB2000288 / CONSTRUCTION
Drill temporary eight soil borings to a depth of 80 each at the existing parking lot at 111 N Street SE, Washington DC. The diameter of the borings is 6 inches. The borings will be grouted upon completion in accordance with DCRA requirements as indicated in the work plan.
1111 NEW JERSEY AVE SE   
05/12/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E2007563 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
05/06/20 
UNITED STATES OF AMERICA / JUSTIN BELLOW; NA
B1913803 / CONSTRUCTION
PARCEL G PROJECT CONSISTS OF A NEW 12 STORY OFFICE BUILDING WITH STREET LEVEL RETAIL AND 2 LEVELS OF BELOW GRADE PARKING. 2 LEVEL PARKING APPROVED UNDER FOUNDATION TO GRADE FD1900047 & SHEETING AND SHORING SH1900050
   
05/19/20 
UNITED STATES OF AMERICA / null
M2002480 / SUPPLEMENTAL
   
05/19/20 
UNITED STATES OF AMERICA / null
P2006118 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.