Since January, 2003
            
 Page Through from Before to After

Let's run down some retail news that doesn't have to do with restaurants!
According to a sign I saw in the window on Saturday, the cleaners known as Dryy was to be opening today (Feb. 3), in the ground floor of the 55 M office building, on top of the Half Street entrance to the Navy Yard-Ballpark Metro station. According to its web site, the store offers free pickup and delivery valet service, custom tailoring, and "Dryy drop lockers."
Meanwhile, just a few steps to the east, the Wells Fargo Express Center is now open, next to Bluestone Lane in the ground floor of 99 M. And a bit to the northwest, next to BonChon, signage has sprouted for Hill Spirits Unlimited, coming soon to 1015 Half Street SE, for all of your fine wine, spirits, and cee-gar needs. (A peek in the window leads me to believe that Hill Spirits is probably still a couple of weeks away from its debut.)
I also wandered over to 8th Street for the first time in a very long time (oops), and feel the need to officially document Ovation Eye Institute and Navy Nails and Spa, even though they've been open a while (I think the nails place actually was briefly in the space that Ovation is now in). And I admit to knowing nothing about Ti Coffee--no evidence of it anywhere on the Barracks Row or Capitol Riverfront web sites, or Google, for that matter. And I don't know about the barbershop, either--another competitor for Wrenn's and Fuller's?
Finally, in the interest of fulfilling my fiduciary duty, here are photos of Congressional Cleaners 2.0, in its spot in the ground floor of the Park Chelsea on I Street west of 2nd (no signage yet), and because I can't believe I never got a photo of it, here's Steadfast Supply in its not-really-new-anymore location in the ground floor of the Foundry Lofts on Water Street, across from Ice Cream Jubilee. And, along those lines, I'm sneaking in one food-related photo, to officially add the signage of Taco City on 8th Street to my repository.
Comments (38)
   
 
 More About Retail

JDLand.com Home

Comments

CJBabyDaddy says: (2/3/20 11:26 AM)
Getting more done by 10:14am than most people do all day. Well done. At ease.


JD says: (2/3/20 11:30 AM)
Well, sort of, but more like I meant to do it last night and was too lazy. But, now I'm caught up.


michaelj says: (2/3/20 12:45 PM)
Any word on ground-floor retail in the Bozzuto condo building across from The Brig on 8th St?


202_cyclist says: (2/3/20 4:11 PM)
michaelj— my guess is either a cell phone store, a bank, a dry cleaner, or some combination of the three.


bdj says: (2/3/20 10:07 PM)
That Taco City place is really good if you haven't checked it out yet.


CJBabyDaddy says: (2/4/20 7:29 AM)
@bdj: No truer words have been written.


monkeyrotica says: (2/4/20 8:05 AM)
Don't sleep on their braised beef torta. One of the best sandwiches in the neighborhood.


jdc says: (2/4/20 9:55 AM)
Construction fencing and initial staging, including a trailer, onsite at Metro chiller site.


tw81 says: (2/4/20 10:07 AM)
Crossing DC details on Bozzuto's website (with rendering!):

link


ValveetaChz says: (2/4/20 11:14 AM)
Las Placitas needs to close...they NEVER have any pupusas! A Salvadoran restaurant without pupusas is like a Mexican restaurant without tacos!


jdc says: (2/4/20 1:26 PM)
Aren't these renders already quite old? I seem to recall seeing them in the fall, or late summer.


JD says: (2/4/20 2:01 PM)
Photo of the chiller site as of yesterday, per jdc's comment.



jdc says: (2/4/20 2:11 PM)
I'll snap and pass along a bird's eye shot when I have a moment.


jdc says: (2/4/20 2:49 PM)
As a walker, I am happy the sidewalks around Meridian are now open and I am THRILLED the sidewalks around Parc phase 2 are being installed.


sharksfansd says: (2/4/20 10:44 PM)
@ValveetaChz, right there with you. I think I have only had one visit (out of many) at Las Placitas where they had pupusas available.


JD says: (2/6/20 8:47 AM)
I saw this at the fenced parking lot-that-isn't on the old warehouse site at 49 L. I wonder if the lot is about to be the replacement for Nats Lot K (since this site is now owned by the Lerners). It's not shown yet on the ofifical Nats Parking Lot page.



bdj says: (2/6/20 10:35 PM)
@jdc maybe Parc Riverside will finish construction before they hit the 3 year mark.... one can hope. Meridian started a full year after, and still beat them to finishing

@JD they had it striped all of last year during the season. I was surprised they didn't even open up the lot during the WS run.


202_cyclist says: (2/8/20 11:10 PM)
The tower crane is up for the Chenomics headquarters!


VelocityChris says: (2/9/20 1:40 PM)
Uggg, so that confirms nothing imminent for construction at 49L, I really want a building to go up there soon and complete that block!

Double ugggg on Parc Riverside!


jdc says: (2/11/20 9:06 AM)
Hill Spirits seems to be at a standstill. After quite a bit of progress, I have not noticed anything changed the last two weeks.


JD says: (2/11/20 9:16 AM)
Albi opening Feb. 20, according to City Paper, which has a preview: link There will also be a daytime coffee offering named "Yellow" coming in spring in between Albi and the adjacent wine bar Maxwell Park, which is supposed to open before spring.


walt says: (2/11/20 11:57 AM)
The rooftop renderings for the Bozzuto building are funny. All the men have long sleeve shirts or light jackets, while the women are dressed in bathing suits. I can see one dude in swim trunks and he looks as if he's about to fall over the side of the building!


malatesta says: (2/11/20 7:24 PM)
You can buy a round trip flight to Detroit, take an Uber to literally any restaurant in Dearborn and eat just a bunch of shwarma and toum.

Or for the same price you can go to Albi.


202_cyclist says: (2/12/20 6:52 AM)
malatesta— and for an added bonus, you can take a side trip to Windsor, Canada, eh!


willinrm says: (2/12/20 10:26 AM)
@JD it is also posted on the top of albi's website now, you can make a reservation for the 20th for dinner.


JES says: (2/13/20 10:14 AM)
Regarding the 49L lot JD, at a Velocity social event last night, it was mentioned that the 80M developer might be renting it (or at least part of it) for construction staging for their "pop up" expansion.


202_cyclist says: (2/13/20 1:38 PM)
This is fantastic. I haven’t been to either El Rey or American Ice Company in a few years but both are great. The Hilton brothers can do no wrong.

link


202_cyclist says: (2/13/20 3:30 PM)
Why no love for Burlington?

(oops, image URL included with this comment didn't work!)



202_cyclist says: (2/13/20 3:30 PM)
link


Jscott280 says: (2/15/20 10:28 AM)
Spoke with a parking lot attendant at Parcel I after I saw all monthly parking would stop at the end of feb. he mentioned that the parking lot would shrink by 2/3 with construction starting in the next 2 months in an apartment complex. The new entrance to the reduced parking area will be on N place instead of N street.


Jscott280 says: (2/15/20 10:29 AM)
*Parcel L


Jscott280 says: (2/15/20 10:29 AM)
Sorry Parcel i lol


JD says: (2/15/20 10:30 AM)
Yes, right the first time!

link



CJBabyDaddy says: (2/17/20 10:26 PM)
So, when construction of the Parcel I “skybridge” apartment building gets to the point where it blocks our view of where we all thought our neighborhood cineplex was going to open in 2018, will that have any impact on the number of times per month that 202cyclist triggers our neighborhood cineplex PTSD by asking JD for a neighborhood cineplex update?


walt says: (2/19/20 10:51 AM)
Any guesses as to what will happen when parking is further reduced in the neighborhood? Will it be harder to get people to work here? Will there be more road rage incidents?


walt says: (2/19/20 10:54 AM)
I also want to comment that I greatly prefer when a new street is named 1 1/2 street instead of just using the same number and changing the "Street" to "Place". the people on 3rd Street and 3rd Place have their mail mixed up ALL THE TIME.


202_cyclist says: (2/19/20 11:25 AM)
When parking is further reduced, people can take metro to one of the two stations that are a ten minute walk to our neighborhood, they can take one of the multiple bus routes that serve the neighborhood, bike/walk/scoot to the neighborhood, or car-pool.

With that said, as construction finishes up at buildings such as Parc Riverside (jajaja-- construction is never going to finish there) more curbside parking will be added.


jdc says: (2/24/20 1:07 PM)
Concur with 202 - with Parc Riverside phase 2 and then DC Crossing finished, there will be a fair bit of street parking added back to the NW section of JD Land.

Add a Comment:


Registered CommenterPosting Comments Now Requires a
Registered Account:

Log In, or Register Now



JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

GarfieldPark on Albi Opening This: Speaking of which, new BLUE benches installed on empty lot across from DOT build...
JD on Albi Opening This: Twin cranes are being birthed at the CSX East site on New Jersey Avenue....
202_cyclist on Albi Opening This: There was soil boring activity this morning at the former taxi lot at New Jersey...
jdc on Retail Roundup: Concur with 202 - with Parc Riverside phase 2 and then DC Crossing finished, the...
Jscott280 on Albi Opening This: Fences up around parcel H. They are going to change the ingress points to N plac...
jdc on Albi Opening This: At 37 L, windows are going in and tower crane is gone. At Chiller site next door...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O VAN ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/26/20
1500 B/O SOUTH CAPITOL ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/24/20
1000 B/O 1ST ST SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 02/24/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/24/20
1200 B/O VAN ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/23/20
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 02/22/20
900 B/O 11TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/19/20
900 B/O M ST SE   BURGLARY
Burglary Two
 02/19/20
1200 B/O HALF ST SE   ROBBERY  02/18/20
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/20
400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  02/08/20
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/02/20
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/01/20
600 B/O VIRGINIA AVE SE   ASSAULT WITH A DANGEROUS WEAPON  01/29/20

Recent Issued Building Permits Archive  
909 4TH ST SE   
02/12/20 
MEREDITH FASCETT / null
E2004655 / SUPPLEMENTAL
1300 4TH ST SE APT 214   
02/03/20 
null / NA NA NA
EHOP20983190 / HOME OCCUPATION
1021 5TH ST SE   
02/13/20 
KEVIN WILLIAMS / KEVIN WILLIAMS; KEVIN WILLIAMS
B2005053 / CONSTRUCTION
Apply for building permit to have final closing inspection for permit #B1602481 & B1602513 per inspector inspection report since these permits has expired.
150 I ST SE   
02/14/20 
SQUARE 737 LLC / JASON D DORRIS
AH2000818 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail, and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
250 M ST SE   
02/14/20 
SQUARE 769 LLC / null
P2003901 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE 20003   
02/14/20 
BROOKFIELD PROPOERTIES / TIM GOOD
AH2000849 / CONSTRUCTION
After hours to conduct work on 1275 New Jersey Ave SE on the upcoming holiday, Presidents Day, February 17, 2020. Operations would include below grade concrete and waterproofing activities with access limited to N Street. This permit would not include extended work hours beyond the normal 7am to 7pm period.
1111 NEW JERSEY AVE SE   
02/25/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / WILL ROWELL; NA NA
B2000625 / CONSTRUCTION
Scope of Work; Plumbing additional bathroom and new fixtures-running lines under slab & within a 15' radius. Electrical installation of approx. 10 outlets / 5 switches / 200 amp services / sub panel & new lighting / wiring. HVAC relocating / dropping 2 new heat fans & installation of 2 ductless split systems. Sprinkler System Turn down of all sprinkler heads, re-balance and restart / re-charge
1275 NEW JERSEY AVE SE   
02/07/20 
MILLER AND LONG / WILLIAM MOORE
AH2000699 / CONSTRUCTION
Afterhours to put up towercrane with mobile crane saturday 2 / 8 / 2020 and 2 / 9 / 2020 from 5am to 1159pm
1299 NEW JERSEY AVE SE   
02/18/20 
FOREST CITY SEFC LLC / STRAUCHON; SEE BELOW
BCIV1800153 / CONSTRUCTION
Phase 1A BCIV Permit Description - BCIV 1800153 - The subject BCIV permit is for the Phase IA development of Quander St SE, N Pl SE, and 1-1 / 2 St SE within the overall Forest City, Yards West (FCYW) development area which emphasizes: pedestrian-focused public realm, optimized utility corridor, fully integrated SWM design, and complete street and vision zero design. The FCYW Phase IA is comprised...
1322 PATTERSON AVE SE   
02/13/20 
JOINT BASE ANACOSTIA BOLLING - UNITED STATES NAVAL OBSERVATORY SI / TONYA HARRIS; TONYA HARRIS; TBD
BCIV2000046 / CONSTRUCTION
***FEDERAL PROPERTY*** PROJECT WILL CONSIST OF DREDGING THE EXISTING RETENTION POND AND INSPECTING AND CLEANING THE OUTLET CONTROL STRUCTURE (S1) LOCATED ON THE UNITED STATES NAVAL OBSERVATORY TO REMOVE SEDIMENT ACCUMULATION. CONTRACTOR SHALL AVOID THE CLEARING OF VEGETATION ON POND EMBANKMENTS AND SURROUNDING AREAS SO AS TO KEEP RESTORATION AND REPLANTING TO A MINIMUM.
71 POTOMAC AVE SE   
02/13/20 
MRP REALTY / JAMES VANEGAS
AH2000681 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
   
02/19/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BISHOP; JUSTIN BISHOP
SP1900054 / CONSTRUCTION
Construct a 680 sqft concrete swimming pool inside an existing waterproofed structural box on the 14th floor. All MEP, decking and fencing work by other trades under separate permits.
227 TINGEY ST SE   
02/12/20 
GONE YARD HOTEL OWNER LLC / BOB BIROONAK; BOB BIROONAK
SG2000048 / CONSTRUCTION
one double face illuminated blade sign
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.