Sliding from Before to After
 Let's run down some retail news that doesn't have to do with restaurants! According to a sign I saw in the window on Saturday, the cleaners known as Dryy was to be opening today (Feb. 3), in the ground floor of the 55 M office building, on top of the Half Street entrance to the Navy Yard-Ballpark Metro station. According to its web site, the store offers free pickup and delivery valet service, custom tailoring, and "Dryy drop lockers." Meanwhile, just a few steps to the east, the Wells Fargo Express Center is now open, next to Bluestone Lane in the ground floor of 99 M. And a bit to the northwest, next to BonChon, signage has sprouted for Hill Spirits Unlimited, coming soon to 1015 Half Street SE, for all of your fine wine, spirits, and cee-gar needs. (A peek in the window leads me to believe that Hill Spirits is probably still a couple of weeks away from its debut.) I also wandered over to 8th Street for the first time in a very long time (oops), and feel the need to officially document Ovation Eye Institute and Navy Nails and Spa, even though they've been open a while (I think the nails place actually was briefly in the space that Ovation is now in). And I admit to knowing nothing about Ti Coffee--no evidence of it anywhere on the Barracks Row or Capitol Riverfront web sites, or Google, for that matter. And I don't know about the barbershop, either--another competitor for Wrenn's and Fuller's? Finally, in the interest of fulfilling my fiduciary duty, here are photos of Congressional Cleaners 2.0, in its spot in the ground floor of the Park Chelsea on I Street west of 2nd (no signage yet), and because I can't believe I never got a photo of it, here's Steadfast Supply in its not-really-new-anymore location in the ground floor of the Foundry Lofts on Water Street, across from Ice Cream Jubilee. And, along those lines, I'm sneaking in one food-related photo, to officially add the signage of Taco City on 8th Street to my repository.
All posts:
1015 Half, 55 M St., 880 NJ/Park Chelsea, 99m, congressionalcleaners, dryy, Foundry Lofts/Yards, hillspirits, navynails, ovation, parkchelsea, Retail, tacocity, wellsfargo
JDLand.com Home
CJBabyDaddy says: (2/3/20 11:26 AM)
Getting more done by 10:14am than most people do all day. Well done. At ease.
JD says: (2/3/20 11:30 AM)
Well, sort of, but more like I meant to do it last night and was too lazy. But, now I'm caught up.
michaelj says: (2/3/20 12:45 PM)
Any word on ground-floor retail in the Bozzuto condo building across from The Brig on 8th St?
202_cyclist says: (2/3/20 4:11 PM)
michaelj— my guess is either a cell phone store, a bank, a dry cleaner, or some combination of the three.
bdj says: (2/3/20 10:07 PM)
That Taco City place is really good if you haven't checked it out yet.
CJBabyDaddy says: (2/4/20 7:29 AM)
@bdj: No truer words have been written.
jdc says: (2/4/20 9:55 AM)
Construction fencing and initial staging, including a trailer, onsite at Metro chiller site.
ValveetaChz says: (2/4/20 11:14 AM)
Las Placitas needs to close...they NEVER have any pupusas! A Salvadoran restaurant without pupusas is like a Mexican restaurant without tacos!
jdc says: (2/4/20 1:26 PM)
Aren't these renders already quite old? I seem to recall seeing them in the fall, or late summer.
JD says: (2/4/20 2:01 PM)
Photo of the chiller site as of yesterday, per jdc's comment.
jdc says: (2/4/20 2:11 PM)
I'll snap and pass along a bird's eye shot when I have a moment.
jdc says: (2/4/20 2:49 PM)
As a walker, I am happy the sidewalks around Meridian are now open and I am THRILLED the sidewalks around Parc phase 2 are being installed.
sharksfansd says: (2/4/20 10:44 PM)
@ValveetaChz, right there with you. I think I have only had one visit (out of many) at Las Placitas where they had pupusas available.
JD says: (2/6/20 8:47 AM)
I saw this at the fenced parking lot-that-isn't on the old warehouse site at 49 L. I wonder if the lot is about to be the replacement for Nats Lot K (since this site is now owned by the Lerners). It's not shown yet on the ofifical Nats Parking Lot page.
bdj says: (2/6/20 10:35 PM)
@jdc maybe Parc Riverside will finish construction before they hit the 3 year mark.... one can hope. Meridian started a full year after, and still beat them to finishing @JD they had it striped all of last year during the season. I was surprised they didn't even open up the lot during the WS run.
202_cyclist says: (2/8/20 11:10 PM)
The tower crane is up for the Chenomics headquarters!
VelocityChris says: (2/9/20 1:40 PM)
Uggg, so that confirms nothing imminent for construction at 49L, I really want a building to go up there soon and complete that block! Double ugggg on Parc Riverside!
jdc says: (2/11/20 9:06 AM)
Hill Spirits seems to be at a standstill. After quite a bit of progress, I have not noticed anything changed the last two weeks.
JD says: (2/11/20 9:16 AM)
Albi opening Feb. 20, according to City Paper, which has a preview: link There will also be a daytime coffee offering named "Yellow" coming in spring in between Albi and the adjacent wine bar Maxwell Park, which is supposed to open before spring.
walt says: (2/11/20 11:57 AM)
The rooftop renderings for the Bozzuto building are funny. All the men have long sleeve shirts or light jackets, while the women are dressed in bathing suits. I can see one dude in swim trunks and he looks as if he's about to fall over the side of the building!
malatesta says: (2/11/20 7:24 PM)
You can buy a round trip flight to Detroit, take an Uber to literally any restaurant in Dearborn and eat just a bunch of shwarma and toum. Or for the same price you can go to Albi.
202_cyclist says: (2/12/20 6:52 AM)
malatesta— and for an added bonus, you can take a side trip to Windsor, Canada, eh!
willinrm says: (2/12/20 10:26 AM)
@JD it is also posted on the top of albi's website now, you can make a reservation for the 20th for dinner.
JES says: (2/13/20 10:14 AM)
Regarding the 49L lot JD, at a Velocity social event last night, it was mentioned that the 80M developer might be renting it (or at least part of it) for construction staging for their "pop up" expansion.
202_cyclist says: (2/13/20 1:38 PM)
This is fantastic. I haven’t been to either El Rey or American Ice Company in a few years but both are great. The Hilton brothers can do no wrong. link
202_cyclist says: (2/13/20 3:30 PM)
Why no love for Burlington?
(oops, image URL included with this comment didn't work!)
Jscott280 says: (2/15/20 10:28 AM)
Spoke with a parking lot attendant at Parcel I after I saw all monthly parking would stop at the end of feb. he mentioned that the parking lot would shrink by 2/3 with construction starting in the next 2 months in an apartment complex. The new entrance to the reduced parking area will be on N place instead of N street.
CJBabyDaddy says: (2/17/20 10:26 PM)
So, when construction of the Parcel I “skybridge” apartment building gets to the point where it blocks our view of where we all thought our neighborhood cineplex was going to open in 2018, will that have any impact on the number of times per month that 202cyclist triggers our neighborhood cineplex PTSD by asking JD for a neighborhood cineplex update?
walt says: (2/19/20 10:51 AM)
Any guesses as to what will happen when parking is further reduced in the neighborhood? Will it be harder to get people to work here? Will there be more road rage incidents?
walt says: (2/19/20 10:54 AM)
I also want to comment that I greatly prefer when a new street is named 1 1/2 street instead of just using the same number and changing the "Street" to "Place". the people on 3rd Street and 3rd Place have their mail mixed up ALL THE TIME.
202_cyclist says: (2/19/20 11:25 AM)
When parking is further reduced, people can take metro to one of the two stations that are a ten minute walk to our neighborhood, they can take one of the multiple bus routes that serve the neighborhood, bike/walk/scoot to the neighborhood, or car-pool. With that said, as construction finishes up at buildings such as Parc Riverside (jajaja-- construction is never going to finish there) more curbside parking will be added.
jdc says: (2/24/20 1:07 PM)
Concur with 202 - with Parc Riverside phase 2 and then DC Crossing finished, there will be a fair bit of street parking added back to the NW section of JD Land.
ValveetaChz says: (3/3/20 7:45 AM)
We are STILL dealing with our mail being mixed up after almost 9 years!
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
1100 B/O NEW JERSEY AVE SE
|
| BURGLARY
Burglary Two
| 11/26/20
|
UNIT B/O M ST SE
|
| ROBBERY
| 11/25/20
|
1000 B/O NEW JERSEY AVE SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/24/20
|
UNIT B/O I ST SE
|
| ROBBERY
Carjacking
| 11/23/20
|
200 B/O M ST SE
|
| ASSAULT WITH A DANGEROUS WEAPON
| 11/22/20
|
UNIT B/O I ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/22/20
|
700 B/O L ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/22/20
|
1000 B/O 3RD ST SE
|
| ROBBERY
| 11/21/20
|
1200 B/O 1ST ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/19/20
|
UNIT B/O M ST SE
|
| THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
| 11/18/20
|
1000 B/O HALF ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/12/20
|
1100 B/O 2ND PLACE SE
|
| MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
| 11/12/20
|
1000 B/O 8TH ST SE
|
| THEFT
Theft First Degree (theft From Building)
| 11/12/20
|
1000 B/O HALF ST SE
|
| THEFT FROM AUTO
Theft (theft Of Motor Vehicle Parts Or Accessories)
| 11/10/20
|
400 B/O M ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/05/20
|
300 B/O L ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/05/20
|
900 B/O 4TH ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/01/20
|
UNIT B/O I ST SE
|
| THEFT
Theft First Degree (shoplifting)
| 10/31/20
|
900 B/O HALF ST SE
|
| MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
| 10/29/20
|
300 B/O TINGEY ST SE
|
| ROBBERY
Carjacking
| 10/29/20
|
1300 B/O 4TH ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 10/28/20
|
|
Recent Issued Building Permits
| Archive
|
|
1200 1ST ST SE
|
|
11/04/20
PEPCO / DONNA G GRAHAM
AH2100169 /
CONSTRUCTION
WO #16029084 / 02 - 1200 1ST ST SE - PEPCO / WA CHESTER TO REMOVE AND INSTALL CABLES MONDAY THROUGH SATURDAYS FROM 9PM TO 6AM STARTING 11 / 5 / 20 TO 12 / 5 / 20
|
1018 3RD ST SE
|
|
11/10/20
DAVID A LEINER / null
E2101357 /
SUPPLEMENTAL
|
1300 4TH ST SE 1001
|
|
11/03/20
YAAN REAL ESTATE LP / null
P2100950 /
SUPPLEMENTAL
|
1300 4TH ST SE RU-1
|
|
11/19/20
AP BOWER RETAIL LLC / null
E2101650 /
SUPPLEMENTAL
|
1057 5TH ST SE
|
|
11/05/20
PAM HARDER / null
E2101183 /
SUPPLEMENTAL
|
82 I ST SE
|
|
11/12/20
STARRY / null
E2101432 /
SUPPLEMENTAL
|
330 K ST SE
|
|
11/09/20
MINDY J SHAW / CASEY CHARKHABI; NA
B2008664 /
CONSTRUCTION
Adding a bathroom on the first floor
|
|
|
11/10/20
JINGSONG XIA / null
P2101107 /
SUPPLEMENTAL
|
100 M ST SE
|
|
11/12/20
LHREV WASHINGTON M ST LLC / null
P2101170 /
SUPPLEMENTAL
|
|
|
11/12/20
SQUARE 743 INC / ;
P2101121 /
SUPPLEMENTAL
|
139 N ST SE
|
|
11/10/20
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW; BROOKFIELD DEVELOPMENT
B2004436 /
CONSTRUCTION
NEW CONSTRUCTION 10-STORY PLUS PENTHOUSE APARTMENT BUILDING WITH 379 UNITS. PROPOSED GROSS FLOOR AREA: 225,000 SF.
SH2000028 issued
|
1275 NEW JERSEY AVE SE
|
|
11/04/20
USA / null
E2101168 /
SUPPLEMENTAL
|
|
|
11/09/20
BROOKFIELD PROPERTIES / TIM GOOD
BP2100588 /
POST CARD
|
71 POTOMAC AVE SE APT 1208
|
|
11/02/20
null / NA NA NA
EHOP20957167 /
HOME OCCUPATION
|
71 POTOMAC AVE SE
|
|
11/04/20
RIVERFRONT HOLDINGS II, LLC / null
M2100380 /
SUPPLEMENTAL
|
|
|
11/04/20
RIVERFRONT HOLDINGS II, LLC / null
P2100978 /
SUPPLEMENTAL
|
|
|
11/09/20
MRP REALTY / null
E2101319 /
SUPPLEMENTAL
|
227 TINGEY ST SE
|
|
11/18/20
FC 227 LLC / null
E2101630 /
SUPPLEMENTAL
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|