Since January, 2003
            
 Sliding from Before to After

With a few hours to go until Nats fans spend three-plus hours watching baseball on TV through their hands, some items to catch on. (I don't think I'm the only one who found that, as amazing as the playoff run has been, it has totally sapped my energy. Recovery begins soon, one way or the other.)
* 80 M TO GROW: It's a surprising piece of news, but it's now officially being reported that the 80 M Street office building, on the northwest corner of 1st and M, is looking to add two stories using "mass timber." Bisnow has more, and the architecture firm's web site has some renderings as well. (It was originally built in 1999-2000, aka Before My Time, so I don't have a project page, but you can see it under construction in these two grainy film photos I took in the fall of 2000.) It does have to get past the Zoning Commission first, though.
* ANCHOVY SOCIAL: We already knew that Danny Meyer is going to be opening Maialino Mare in the ground floor of the new Thompson Hotel at 3rd and Tingey, and now it's being reported that the rooftop bar will be a separate operation named Anchovy Social, which Food and Wine describes as being "all about chilling out over a martini, seafood towers, and taking in the view."
* THOMPSON GETTING CLOSE: Speaking of the Thompson, its web site is now accepting reservations for the swank hotel at the Yards for February 1st and beyond. (Last week it was March 1 and beyond, so they must be feeling better about their opening date.)
* CHILLER SITE SOLD: This evergreen subhead returns with the news that Metro has finally sold the "Chiller" site on the southwest corner of Half and L to MRP Realty for $10.24 million, as was preliminarily announced back in, oh, 2014. A 161-unit 11-story apartment building with ground-floor retail is already in the Permit Pipeline, and a raze permit for the existing structures is in process as well.
* LA FAMOSA COMING IN 2020: Puerto Rican food is coming to the southeast corner of 4th and Tingey next year, as La Famosa will open as a "fast-fine" restaurant in the ground floor of the Bower. According to City Paper, it will serve all-day coffee, lunch, and dinner. And it will have a bar.
* HATOBA NOW OPEN: In case you haven't already wandered by, the neighborhood's first ramen shop is now open, in the old 100 Montaditos space on Tingey Street, SE, near 4th Street.
Comments (16)
   
 
 More Recent News

JDLand.com Home

Comments

Jscott280 says: (10/29/19 7:04 PM)
Any idea of the retail coming to the west side of half steeet? Also, any traction on the movie theater development?


202_cyclist says: (10/29/19 11:16 PM)
Yes, when is the movie theater opening?


Westnorth says: (10/29/19 11:52 PM)
Nats Nats Nats!


202_cyclist says: (10/30/19 12:09 AM)
Jajajajajajajajajajajajajajajajaja!

link


jdc says: (10/30/19 8:33 AM)
Looking around the site, I stumbled across the write up of Mission Dios - is that no longer coming?

Also, the link underneath Walter's goes to Dacha's website on the food map page.


jdc says: (10/30/19 8:35 AM)
OK, never mind. I should have typed Mission DOS, which would have returned the correct web page. Oops.


JD says: (10/30/19 10:48 AM)
@jscott, do you mean the east side of Half? West side is well filled out, with window signage and everything.

As for the movie theater, did something pop up on Nextdoor or something? I've gotten a bunch of questions on it in the past two days. Short answer, they lost the original operator, they see redesigning the building to be smaller, and they still don't control the land from DC Water anyway.


JD says: (10/30/19 10:49 AM)
And Nats! Nats! Nats!


JD says: (10/30/19 11:57 PM)
Nats! Nats! Nats!


202_cyclist says: (10/31/19 7:32 AM)
Fight Finished! NATS! NATS! NATS!

JD— hopefully you get to ride on the lead float for the World Series parade!


Jscott280 says: (10/31/19 10:05 AM)
@jdland sorry I meant the eastern party of half street.

Also, what is the holdout with DC water transferring over the land?


JD says: (10/31/19 3:01 PM)
@Jscott, Punch Bowl Social is the only retail announced at the combo Kelvin apts and Envy condos on the east side.

DC Water seems to be unable to find a new location for whatever it currently uses that land for. (And eventually Brookfield/Forest City is supposed to be able to redevelop the rest of the DC Water ops on 1st Street other than the pumping stations/HQ.)


202_cyclist says: (10/31/19 3:47 PM)
Across the South Capitol Street, in SWTLQTC territory, construction has started for the boutique hotel that is one or two blocks north of Audi Field in Buzzard Point. There is a new tower crane for it.

link

Exciting times! The Nats win the World Series and we get a new tower crane in the same week!


Sasq says: (11/5/19 7:47 AM)
Hello all!

Any future eNvy residents checking out this site? Looks like they moved the "delivery date" from December to Feb/Mar....

Also, the commercial space (while no names) should include a fudge/candy shop and a self pour brewer.


UpEarly says: (11/7/19 3:35 PM)
Brookfield says they are still pursuing a theater for Yards West:

(oops, image URL included with this comment didn't work!)



UpEarly says: (11/7/19 3:36 PM)
link

Add a Comment:


Registered CommenterPosting Comments Now Requires a
Registered Account:

Log In, or Register Now



JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJBabyDaddy on Slider-Palooza 2019: The lobby, roof, and 4th floor meeting space are available for rental.
conngs0 on Slider-Palooza 2019: I totally agree that the first floor of the DC Water HQ looks fantastic. I hope...
conngs0 on Catching Up on: Brett M, I echo your disappointment on the structure of the new Capper Senior Ce...
CJBabyDaddy on Slider-Palooza 2019: A lovely lobby does not a public museum make. A rentable rooftop does not an ob...
JD on Slider-Palooza 2019: It is a lovely public area that requires one to be escorted by a DC Water staffe...
walt on Slider-Palooza 2019: question for an expert: DC Water has what I thought were "public areas&quo...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1000 B/O 3RD ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 11/01/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/01/19
400 B/O M ST SE   THEFT
Shoplifting
 10/30/19
200 B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/19
100 B/O H ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/28/19
900 B/O NEW JERSEY AVE SE   ROBBERY  10/28/19
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/27/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/24/19
100 B/O H ST SE   ROBBERY  10/23/19
1400 B/O SOUTH CAPITOL ST   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/22/19
100 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
70 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 10/21/19
300 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 10/20/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 10/17/19

Recent Issued Building Permits Archive  
1331 2ND ST SE   
11/08/19 
DC WATER / CRAIG M COOK
B1907684 / CONSTRUCTION
Flood mitigation, seal openings, install brackets for stop logs, replace elevator shaft with concrete slab.
1346 4TH ST SE   
10/23/19 
FC 1346 HOLDCO I LLC / GARY BRENT; NA NNA; NA
SG2000046 / CONSTRUCTION
Install 1 illuminated wall sign & 2 non-illuminated wall sign - ALBI
1037 5TH ST SE   
10/18/19 
JOHN P LANG / SOLAR SOLUTION DC LLC; SOLAR SOLUTION DC LLC
SOL1901920 / CONSTRUCTION
To install 4.29 kW size of solar panels with a system height of 1.1 feet on roof of building,
300 M ST SE SPACE B   
11/06/19 
FEDERAL CENTER LP / null
M2000403 / SUPPLEMENTAL
100 M ST SE SUITE 200 20003   
10/25/19 
MONUMENT REALTY LLC / null
E2001081 / SUPPLEMENTAL
100 M ST SE STE# 200   
10/25/19 
SQUARE 743 INC / MIGUEL A. MOROTE; MIGUEL A. MOROTE
E2001078 / SUPPLEMENTAL
100 M ST SE   
10/21/19 
SQUARE 743 INC / JOHN C. BLOCK; JOHN C. BLOCK
E2000895 / SUPPLEMENTAL
   
10/21/19 
SQUARE 743 INC / null
E2000932 / SUPPLEMENTAL
300 M ST SE   
10/17/19 
FEDERAL CENTER LP / SUKWON KIM; SUKWON KIM; NA
SG1900286 / CONSTRUCTION
To install a set of illuminated LED channel letters on raceway onto wall
   
11/06/19 
FEDERAL CENTER LP / RUBEN MOVSISYAN; RUBEN MOVSISYAN
E2001472 / SUPPLEMENTAL
   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/05/19 
809-853 NEW JERSEY AVENUE ACQUISITION, LLC / JAVIER A GRACIA; NA NA
SB2000011 / CONSTRUCTION
Drilling and installation of 3 inclinometers which will be extended to a depth of 25 below existing site grade as well as the installation of 4 settlement optical monitoring points which will be extended to depths ranging between 5 feet to 30 feet below existing site grades.
1100 NEW JERSEY AVE SE 1ST   
11/04/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2001381 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 410 20003   
10/24/19 
WILLIAM SNOODT / null
P2000729 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 420   
10/22/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2000949 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE 4TH FL   
10/22/19 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2000951 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE STE# 102A   
10/17/19 
SQUARE 742 LLC / STEPHEN TAYLOR; CHRIS PADBERG
B1913851 / CONSTRUCTION
Convert 'office' tenant space to 'The UPS Store'. Interior work only. minimum work done. 990 sq ft. No plumbing. Change diffusers and ceiling tiles. Install UPS furniture and add a few outlets.
1100 NEW JERSEY AVE SE   
10/17/19 
SQUARE 742 LLC / WILLIAM SNODDY; TBD
B1915102 / CONSTRUCTION
Revision to previous permit number B1911194 Expansion of Tenant's Current suite into Adjacent Suite has already been "white boxed". Expansion space to consist only of workstation and Offices. Some Minor Demolition will occur in tenant existng suite in order to rework existing tenant entry and enlarge tenant reception. addition of storage closet will be added in place of existing corridor.
   
10/17/19 
SQUARE 742 LLC / WILLIAM SNODDY; CHRIS CONDON
B1913780 / CONSTRUCTION
Tenant Finish Out. Existing Conditions to be Demolished and New Space Built to Landlord Standards to Include new Ceiling grid lighting and Finishes **LEVEL 2 ALTERATION
   
10/21/19 
SQUARE 742 LLC / STEPHEN TAYLOR; NA TBD
B2000682 / CONSTRUCTION
Revision to existing issued permit #B1913851: Furniture layout revision, mailboxes changed location. Electrical outlets relocated per furniture changes.
   
10/22/19 
SQUARE 742 LLC / ;
P2000628 / SUPPLEMENTAL
   
10/23/19 
SQUARE 742 LLC / TRACIE TRACIE; TRACIE TRACIE; KALI A. SHELTON
SG2000051 / CONSTRUCTION
One wall mounted sign illuminated.
   
11/01/19 
SQUARE 742 LLC / ;
P2000952 / SUPPLEMENTAL
   
11/05/19 
SQUARE 742 LLC / BETSY H MARINO; RICHARD PEPPER; BETSY H MARINO
SG2000062 / CONSTRUCTION
Remove Alion sign and replace with illuminated wall sign reading SERCO
71 POTOMAC AVE SE   
11/08/19 
RIVERFRONT HOLDINGS II, LLC / JAMES VANEGAS
AH2000075 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
520 TINGEY ST SE   
10/30/19 
UNITED STATES OF AMERICA / JOHN WICKLIFFE; TBD
TN2000020 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Feb 9, 2020 - Aug 4, 2020 Events Daily 8:00 am - 10:00 pm
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.