Since January, 2003
            
 Sliding from Before to After

Losing track of which project is which? Time for another photo tour....
First, let us welcome the two new skeletons now above ground level, the Maren on Potomac Avenue and Paradigm's project at 1000 1st St., SE, both of which are apartment projects:
(Tishman Speyer's massive Square 696 residential project is just now starting to peek up, but didn't make the above-ground cut this time.)
It's a sign that the frantic construction pace of the past two years that we only have three projects coming out of the ground, and only one where excavation is stlll underway (One Hill South 2). A breather will be nice.
That said, there are still nine other projects that are in the getting-their-faces-on stage of construction. So let's look at the National Association of Broadcasters HQ (and its sibling Avidian condos to the rear) at South Capitol and M, the Funnel on Half Street (aka West Half), the combo project of the Estate apartments at 3rd and Water by the Yards Park and a Thompson hotel at 3rd and Tingey (shown in closeup because I dig the windows), the second phase of Novel South Capitol, Parc Riverside Phase 2 at Half and L, and the Garrett at 2nd and K. The last photo in the bunch is 1250 Half, which is both a still-rising skeleton on its southern end and a face-being-put-on project on its northern end, completely mucking with my flow.
(Follow the links to the project pages for details--I've already written enough words this week!)
Still under construction as well are residential projects the Harlow and the Bower condos/Guild apartments, but I didn't take any updated photos because their exterior work is mostly done. Plus I might have collapsed.
Tired out by this? Now you know why I for the first time grabbed a scooter to cover all of the territory.
But I also used my newfound scooter freedom to get some sorely needed shots at the far edges of the JDLand coverage area. Here are my first photos of the work on the new Douglass Bridge, as seen from the old Douglass Bridge (and no, that platform is not the new bridge), as well as a picture of the Emblem on Barracks Row condo building at 8th and Virginia, now completed despite my having almost completely ignored it during its construction:
Speaking of the new Douglass Bridge, if you go to the official web site and scroll down to Project Gallery, you will see what I think is a new animation of the new bridges and ovals and whatnot.
As for what's on the boards to get underway in 2019, I'd say that the most likely contenders are the new DDOT HQ at 250 M and Lerner's 1000 South Capitol Street residential building, and maybe one other I will write about soon. As for others? We Shall See.
I also belatedly have added the GSA warehouse at 49 L to my Demolished Buildings Gallery, as #181. That's a lot of demo.
Comments (15)
   
 
 More About Development News

JDLand.com Home

Comments

202_cyclist says: (1/10/19 3:51 PM)
It also looks like construction is going to begin any minute on the new DDOT headquarters. The sidewalk is torn up and there are concrete barriers and a fence.


Lambau88 says: (1/10/19 4:31 PM)
Thank you for all the updating. Great work!


RMP says: (1/11/19 9:05 AM)
Great update, JD!

Does Parcel L have a fancy name yet? Also is it just me or does the exterior make the building look really cheap?

Fencing around the Bower came down yesterday.


JD says: (1/11/19 10:08 AM)
Yes, Parcel L is the Estate, as mentioned above. :)



JD says: (1/11/19 10:15 AM)
An up-to-date rendering of DDOT HQ/250 M (and also note that 250 M has now appeared on the Highlighted Projects map):



RMP says: (1/11/19 11:41 AM)
@JD thanks, not sure how I missed that.


202_cyclist says: (1/13/19 9:57 AM)
There is a session today at the annual Transportation Research Board conference about commuter ferries, including a discussion of the feasibility of commuter ferries in the DC region. I will report back on any mthing relevant for the Capitol Riverfront.


SWneighbor says: (1/14/19 10:02 AM)
Does anyone know if the Metro chiller site condo project is still in the works? It seems to have evaporated.


jdc says: (1/15/19 12:49 PM)
SWneighbor - one thing is for sure, no one bothered to shovel, or salt, those sidewalks...or those around the former GSA warehouse.


stax says: (1/15/19 8:07 PM)
Great update. Any news on the new humane society building at 11th and M? i talked to the guy at Kim's Custom Tailor last week. He has to be out of his space by the end of March. It sounds like they are taking down that entire block. He is moving to a place on L, right off of 8th. BTW, he moved to his current location about 15 years ago when he lost is space at the Waterside Mall because of redevelopment.


Capyardsres says: (1/15/19 8:16 PM)
Just got a note under the door saying that 70 and 100 capitol yards are now under the management of Greystar effective ASAP.


Section314 says: (1/16/19 10:35 AM)
Have there been any buildings completed such that move-ins have begun since the Agora and 1221 Van which opened last January and February? It looks like the Bower and the Harlow are getting very close to completion but it doesn't look like move-ins have quite begun yet. West Half looks like they might have move-ins by Opening Day, too.


GarfieldPark says: (1/16/19 12:24 PM)
Novel South Cap has floor plans on their website:

link


JD says: (1/16/19 1:52 PM)
@Stax, forgot to reply to you on the Humane Society. I'm actually shocked to hear that--I thought I had heard somewhere they were having second thoughts about that block. I guess We Shall See!


CJBabyDaddy says: (1/16/19 3:21 PM)
@Section314: The first wave of lower floor Boweristas expect that their punchlist walkthrough inspections will be scheduled in a few weeks, and that they will be delivering their wheelbarrows of cash to Monty Hoffman and storming the ramparts as early as a few weeks afterward.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

RMP on Signage, and Not-Yet-Signage: Not sure if this signage is being saved for a future post, but I know it's one t... [image]
JES on Retail News: FYI, we had Morini over to Velocity yesterday for an event and they confirmed th...
JD on Retail News: If you want to help support Van Ness Elementary via their silent auction, up for...
202_cyclist on Retail News: RMP-- not to quibble but I assume Winter 2019 is Dec. 2019. There is still suff...
RMP on Retail News: @202_cyclist by my count they've only got a week left if they're going to do &qu...
202_cyclist on Retail News: @RMP— I give up. What is the mistake on the ad?
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/11/19
200 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 03/08/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/07/19
400 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 03/06/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/05/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/28/19
400 B/O M ST SE   THEFT
Shoplifting
 02/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/25/19
1100 HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/24/19
400 B/O M ST SE   THEFT
Shoplifting
 02/23/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/22/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/22/19
1300 B/O WATER ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/18/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/17/19
400 B/O 2ND ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/16/19
70 B/O I ST SE   ASSAULT WITH A DANGEROUS WEAPON  02/15/19
500 B/O L ST SE   ROBBERY  02/14/19

Recent Issued Building Permits Archive  
1017 3RD PL SE   
03/14/19 
JAUVON M GILLIAM / null
PP1902068 / POST CARD
1331 4TH ST SE CU   
02/22/19 
FC 1331 LLC / null
P1904018 / SUPPLEMENTAL
   
03/13/19 
FC 1331 LLC / null
E1905237 / SUPPLEMENTAL
1346 4TH ST SE   
03/04/19 
FC 1346 LLC / BOB BIROONAK; N/A
SG1900084 / CONSTRUCTION
One illuminated building sign and one double face illuminated blade sign
2 EYE ST SE   
03/12/19 
null / MIKE BOONE
AH1900650 / CONSTRUCTION
PEPCO-ALLEN-CREWS NEED TO REPLACE CABLE AT #2-EYE ST SE. 11PM-5AM 3 / 14 / 19-3 / 15 / 19
2 I ST SE   
02/22/19 
MCDONALDS CORPORATION / null
P1904020 / SUPPLEMENTAL
150 I ST SE   
02/19/19 
SQUARE 737 LLC / DANIEL R. RUDE
P1903909 / SUPPLEMENTAL
(4) Fire pits (1) Water Coolers (4) Rooftop units Sanitary piping, Storm piping
   
02/21/19 
WILLIAM C SMITH CO / null
E1904635 / SUPPLEMENTAL
   
03/15/19 
SQUARE 737 LLC / WILLIAM MOORE
AH1900647 / CONSTRUCTION
afterhours to take down tower crane with mobile crrane saturday 3 / 16 / 2019 and sunday 3 / 17 / 2019 from 4am tp 1159 pm
328 I ST SE   
02/22/19 
BRIAN HUSEMAN / MATTHEW MALASKA
P1904003 / SUPPLEMENTAL
   
03/06/19 
BRIAN HUSEMAN / JAMES W MONTGOMERY
E1905028 / SUPPLEMENTAL
212 M ST SE   
03/04/19 
SQUARE 769 LLC / BRIAN WARNER
UT1900015 / CONSTRUCTION
Remove an unknown number of USTs as they are encountered during construction activities.
250 M ST SE   
02/21/19 
SQUARE 769 LLC / BRIAN C STROTT
B1813732 / CONSTRUCTION
9 story office building with 3 levels below grade. 188,000 gross sqft
300 M ST SE   
03/08/19 
FEDERAL CENTER LP / SAM HOLLEN
B1906302 / CONSTRUCTION
INSTALL NEW FIRST FLOOR SUITE ENTRY DOOR WITH CARD READER TO VACANT TENANT SPACE. INSTALL INTERIOR CONCRETE RAMP WITH 4 INCH ELEVATION CHANGE. PROVIDE EXIT LIGHT AND EXTERIOR LIGHT FIXTURE. 100 SQUARE FEET.
861 NEW JERSEY AVE SE   
03/11/19 
CONSOLIDATED RAIL CORPORATION / JOHN WYCKOFF
SB1900174 / CONSTRUCTION
An environmental assessment will be conducted at the parcel located 861 NJ Ave., SE involving installing 10 soil borings, 7 soil borings will be drilled to a depth of approimately 20 feet bgs and hree soil borings will be drilled to a depth of approximately 50 feet bgs. The soil borings will be drilled and the soil sampled using direct push technology (DPT) dual tube tooling 3.75. All cuttings ...
880 NEW JERSEY AVE SE   
02/21/19 
880 NEW JERSEY AVENUE LLC / CLYDE HURST; CHRISTOPHER P COWIE
B1901729 / CONSTRUCTION
alterations to an existing 688 SF vacant space to add mechanical, plumbing and electrical fixtures to accommodate a future tenant. Future tenant fit out will be provided under a separate permit. This permit is for the landlord work only. The existing space is recently constructed building shell that has not been occupied by a previous tenant.
1299 NEW JERSEY AVE SE   
03/01/19 
UNITED STATES OF AMERICA / MAHMOUD KHACHAN
SB1900167 / CONSTRUCTION
Temporary Geotechnical Soil Borings Number of Borings: 2 Diameter of Boreholes: 6 inches Depth of Borings: 55 ft Drilling Method: Mud Rotary Abandonment Method: Tremie Grouting with Bentonite grout
79 POTOMAC AVE SE   
03/11/19 
RIVERFRONT HOLDINGS I LLC / null
E1905174 / SUPPLEMENTAL
227 TINGEY ST SE L1   
02/28/19 
UNITED STATES OF AMERICA / JOHN MCDONALD
P1904187 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.