Page Through from Before to After
 If an official Twitter account retweets an unofficial Twitter account, I guess that's confirmation, so it can be reported that Wiseguy Pizza is opening at Canal Park (200 M St., SE) today, Oct. 2, at noon. Eat_DC reports that coffee and pastries will come soon, while the Gelato portion of the venture will arrive in the spring. I hope they are ready for the lunchtime rush that will greet them today, especially with the weather so beautiful. (Great. Now I'm hungry.) A few other items: * DOUGLASS BRIDGE: WUSA reports on the first of last week's public meetings about the new Douglass Bridge. DDOT's program manager says that they are already about 25 percent done with the project already. "He added in the next six months, locals should expect to see work begin on the construction of two new traffic ovals that will be placed at the base of each side of the new bridge. After that, the formation of the bridge's new arches should begin to form." * STEADFAST MOVE: Local goods offerer Steadfast Supply is moving this week from its Boilermaker Shops location on Tingey Street to the old EVO Furniture space in the Foundry Lofts building on Water Street, across from Ice Cream Jubilee. It is closed for the move and is expected to open in the new space on Oct. 5. * CHEESESTEAKS: Washingtonian reports that the mystery fast-casual restaurant inside Whole Foods is going to be Philly Wing Fry, from chef Kwame Onwuachi. Cheesesteaks, crispy chicken, waffle fries, and whatnot. "Unlike Kaz Okochi, who’ll have a quick-grab sushi counter in the prepared foods section of the new shop, Onwuachi’s eatery is more like a full-blown restaurant with its own space and seating. Customers can order the full menu inside the store’s SoCap Wine Bar & Pub, which will pour 16 wines by the glass and a dozen draft beers (the shop itself will have seasonal teas and lemonades)." And yes, I took a boatload of photos this weekend. They are already up on the site if you want to go hunting, but I'll be posting a status survey soon.
JDLand.com Home
JD says: (10/2/18 1:04 PM)
I await reports...
Also, in cart-before-the-horse news, we are now officially confirmed for Mission starting at 5 pm Oct. 11. "Main bar Back." Can't decide if that's the back bar upstairs, or the far end of the main bar, or what. At least there's nine days to figure it out.
GarfieldPark says: (10/2/18 5:20 PM)
Wiseguy was good today, it's going to be great to just pop in and grab a slice or two. Barre3 is still awaiting inspection business. No firm date yet.
401guy says: (10/3/18 9:17 AM)
In regards to Barre3 I think they may have been held up a bit because of flooding. I go to Solidcore next door and a few weeks ago classes were cancelled because a faucet was left running over the weekend at Barre3 which then leaked into Solidcore. Probably mostly fixed by now but I would imagine that had some sort of impact on the timeline.
202_cyclist says: (10/3/18 12:04 PM)
I saw a truck this morning with a sign for a beer festival this weekend at "Navy Yards Park." (sic) I am not sure if this is a legitimate festival or if it is being organized by a Nigerian prince.
202_cyclist says: (10/3/18 12:05 PM)
Also, October is significantly less stressful not having to worry about whether the Nats will be eliminated from the playoffs in four games or five games.
DCCyclist365 says: (10/3/18 12:10 PM)
I'm still holding hope that we'll get a WaWa in Navy Yard... those sandwiches!
Snacks says: (10/3/18 12:26 PM)
I'm going to guess Main Bar Back is the area at the back of the Arcade Bar but before the South Capitol Dining Area. It's essentially 4-5 high top tables. linkWiseguys is here, I love it. My wallet won't though. I thought I overheard someone ask if there were specials or deals but didn't hear the answer. Anyone know of any beyond what's on the board? (slice and a drink, slice and a salad, etc are on the board)
walt says: (10/3/18 2:12 PM)
Wiseguy Pizza. WOW I am excited! Tried it for the first time last night and it was great, the service was great, the food was great, and the weather even cooperated.
CJBabyDaddy says: (10/3/18 3:34 PM)
@202: Ever the optimist, I’m confident my Nats would have succeeded in forcing their plsyoff opponent to beat them in a fifth game.
dude says: (10/3/18 7:26 PM)
Just back from Wiseguys. The Korean Chicken pizza was great. The cheese was just ok. My wife said the Penne pizza was really good too. As for the Nats, ugh, at least it’s money saved. Murphy didn’t contribute for the Cubs last night either, just like last year for us in the playoffs. I’m fairly optimistic for next year with Harper or without. Find a catcher, one more solid starter and then find a bullpen again... that’s not asking too much, is it?
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
No records added or modified in the past two weeks. |
|
Recent Issued Building Permits
| Archive
|
|
1300 4TH ST SE 1001
|
|
02/22/21
AP BOWER RETAIL LLC / null
E2104231 /
SUPPLEMENTAL
|
1346 4TH ST SE APT 1M
|
|
02/06/21
null / NA NA NA
EHOP21945129 /
HOME OCCUPATION
|
1331 4TH ST SE R-2
|
|
02/08/21
FC 1331 LLC / FC 1331 LLC
BP2101814 /
POST CARD
|
10 I ST SE
|
|
02/16/21
CAPITOL HILL RACQUET CLUB / NA; VICTORIA STEINHOFF
SB2100112 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
555 L ST SE
|
|
01/29/21
UNITED STATES OF AMERICA / RENNE WELL; RICK HARLAN SCHNEIDER
B2102004 /
CONSTRUCTION
DGS PROJECT REHABILITATION+RESTORATION OF THE HISTORIC LINCOIN FIELDHOUSE
|
861 NEW JERSEY AVE SE 20003
|
|
02/23/21
809-853 NEW JERSEY AVE ACQUISITION LLC / SUSANA VAZQUEZ
AH2100728 /
CONSTRUCTION
Dismantling of tower crane.
|
809 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC 809-853 NEW JERSEY AVENUE ACQUISITION LLC / null
E2103926 /
SUPPLEMENTAL
|
853 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC / null
E2103924 /
SUPPLEMENTAL
|
861 NEW JERSEY AVE SE
|
|
02/05/21
GS CSX HOTEL OWNER LLC / null
E2103762 /
SUPPLEMENTAL
|
1275 NEW JERSEY AVE SE
|
|
02/02/21
FC 1275 NJ LLC / null
E2103662 /
SUPPLEMENTAL
|
|
|
02/11/21
FC 1275 NJ LLC / null
P2103445 /
SUPPLEMENTAL
|
848 SOUTH CAPITOL ST SE
|
|
02/16/21
CXS TRANSPORTATION INC / VICTORIA STEINHOFF; TBD
SB2100111 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|