Since January, 2003
            
 Page Through from Before to After

Was out of town for a long weekend to participate in the induction of the late Mr. JDLand into the University of Arizona School of Journalism Hall of Fame, as part of its inaugural class. Now trying to get caught up (I say that a lot these days, I know):
* MORE COFFEE!: Because you addicted folks can't get enough of that witches' brew you all pretend to like, I'll mention that Eater has reported that Australian chain Bluestone Lane has signed a lease to open a coffee shop a 1,014-square-foot space in the ground floor of the 99 M office building that will also be home to Circa and Open Road. Here's the deets on the existing location in Georgetown. Both the building and Bluestone are expected to be finished later this year.
* OATH OPEN: They kind of snuck in without a lot of fanfare, but Oath Pizza is now open next to Bethesda Bagels on M Street between 1st and New Jersey, joining All-Purpose and Declaration, which both opened last week. Now we await Wise Guy Pizza at Canal Park.
* CHLOE REVIEW: The Post's Tom Sietsema gives Chloe his "good/excellent" rating.
* YARDS PHASE 2: I was kind of surprised at the volume of coverage earlier this week about the second-phase plans at the Yards, which mainly shows the power of sending a press release to every development reporter in town (though not me). If you've been following my posts about "Yards West" since, oh, early 2014, the plans for well over 1 million square feet of office space on the footprint of Spooky Park at 1st and M and two residential buildings on the current parking lots on the south side of N Street is not really anything new. But the press release attached a 2019 start date attached to this next phase, and it also passed along two renderings, including one showing what the release describes as a "six-block spine" beginning at a new plaza at New Jersey and M, extending all the way to the Anacostia River at Diamond Teague Park, described as "a vibrant pedestrian-friendly street, featuring ground-level retail and dining, extended green spaces and a variety of public gathering areas." In all, "Yards West" will have about 3 million square feet of mixed-use space across 18 acres.
Here are the renderings, showing the planned office building for "Parcel F," on the northeast corner of 1st and N, and the aforementioned "spine," looking south toward the river.
(And maybe that new plaza at New Jersey and M will include the dreamed-of third entrance to the Navy Yard Metro station, on the south side of M.)
But what if Amazon picks the Capitol Riverfront/Poplar Point HQ2 proposal, which includes these lots (seen on this map as locations 9 and 10)? Or is this a hint that it's not expected to be chosen? We Shall See!
* PARADIGM PART 2: WBJ reports late this afternoon that Paradigm has now purchased the rest of the block bounded by New Jersey, 1st, K, and L. This includes the Eagle Academy building and the taxi garage next door, on New Jersey. The company is just getting started with its 275-unit residential building at 1000 1st Street, on the west side of this block (known as Square 740), and apparently is planning a twin for the other part of the block.
Comments (18)
   
 
 More Recent News

JDLand.com Home

Comments

NavyYardNittany says: (4/12/18 7:46 AM)
Hope you enjoyed the visit to Arizona JD, though I’m sure it was bittersweet.

Excavation began at 7:00 am sharp this morning on Square 696. Parade of 20 dump trucks welcomed me when I woke up. 4 active construction sites within two/three blocks of each other will be fun to navigate the next few months.

Also, I didn’t see it mentioned here in comments, but Circa put up a FB post last week with pics from inside 88 M and a caption along the lines of “beginning work on the new location” or something like that. Looks as though that building is just about finished in terms of the “build” phase, they were working on putting in the new sidewalk on First stteet when I went by.


Edna says: (4/12/18 11:16 AM)
The "six block spine" in Yards West - is that what has been shown on previous site plans as One-and-a-Half Street?


JD says: (4/12/18 11:17 AM)
Yes--I meant to mention that, but was bewildered as to how to properly format 1.5 Street.


JD says: (4/12/18 11:23 AM)
Re Sq 696, guess I'm going to have to make another rendering!


202_cyclist says: (4/12/18 11:35 AM)
@NavyYardNittany:

At least we got a new bike lane on I Street out of the construction, but I agree with you, between all of the Uber/Lyft and deliveries at 70/100 Capitol Yards and the construction for Square 696, I St will be a cluster for a while.


Edna says: (4/12/18 11:46 AM)
I had the same struggles re: 1.5, and tried a few different options. Since "1.5" is the easiest to type, can we settle on that convention?


malatesta says: (4/12/18 12:14 PM)
Why not 1st place?


202_cyclist says: (4/12/18 1:51 PM)
Yes-- I list 1st Place right across the street from Nats Park.

Does anyone know if Truckeroo will be back this year? Is there enough space at the Bullpen to host it?


conngs0 says: (4/12/18 4:58 PM)
It looks like they're planning on having it at Nats Park this year...

link


Ampersand says: (4/13/18 3:57 PM)
For the record, apparently the ordinal for 1.5 is "sesquialter" (or sesquialteral, the internet is fuzzy). I'm totally down for 1.5st Street as long as everyone agrees to pronounce 1.5th as "sesquialter"


Snacks says: (4/16/18 9:21 AM)
This conversation is getting dangerously close to math ... make brain hurt.


Westnorth says: (4/17/18 10:14 AM)
Bluestone Lane is also open next to the West End library. Avocado toast with all the options totals... $22! No wonder Australian millennials can't afford to buy homes.


Gamble Rogers says: (4/17/18 8:47 PM)
Avocado toast? 1.5th Street? What is the “Newly Developing Area Immediately Adjacent to (but not within) the Navy Yard” coming to?


Gamble Rogers says: (4/17/18 8:48 PM)
More pizza for the NDAIATBNWTNY!

But will any of it be any good?


sameter says: (4/18/18 12:55 AM)
I'm a little surprised at tom's review of chloe, food was passable, ambiance was great. as a small plates/veg-centric restaurant, i would hope the carrots would be cooked well, but undercooked. Chicken was well brined and seasoned, but overcooked. if dishes are going to be as simple and straight forward, you really need to nail the execution, but maybe im just jealous.


ZinNY says: (4/18/18 9:11 AM)
According to a sign on their door, Five Guys is reopening on Monday, April 23.


Lambau88 says: (4/18/18 1:05 PM)
Tried out Declaration on a non-game night. Quality food and friendly/attentive staff but, as to be expected now, beware the prices! Philly cheese-steak and fries, half an order of wings (my friend had the other), and 2 drinks (1 cocktail, 1 beer) were $45 before tip.

Also, I'm not buying all the pizza hype. I'm waiting on wise guys!


greb22 says: (4/18/18 2:57 PM)
I went to Declaration for happy hour on a non game day and they charged me regular prices the manager apologized and basically said he knows there's a glitch in the system. The drinks were good though I didn't really eat.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

JD on Inching from Quarantining: The few people I know who are working downtown say that it's brutal to try to fi...
conngs0 on Inching from Quarantining: jdc, it's going to be super interesting to see how the retail landscape changes....
jdc on Inching from Quarantining: By the time I regularly resume trips to JD Land, I wonder how much of the retail...
Jscott280 on Inching from Quarantining: https://www.bisnow.com/washington-dc/news/retail/barbershop-and-cocktail-bar-con...
MarkinDC on Inching from Quarantining: The new liquor store next to BonChon appears to be open. Also, the new CVS look...
right-toe on Inching from Quarantining: Floor plans posted & new-ish images for the Garrett (adjacent to Whole Foods) & ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/13/20
900 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/20
1500 B/O 1ST ST SE   SEX ABUSE
Assault W/intent To Commit First Degree Sexual Abuse (force) (rape)
 07/08/20
400 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/06/20
1200 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/05/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/03/20
100 B/O O ST SE   ROBBERY  07/03/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/28/20
1200 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/25/20
1200 B/O SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 06/23/20
1200 B/O NEW JERSEY AVE SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 06/20/20
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/20
800 B/O SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/14/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-2   
06/18/20 
AP BOWER RETAIL LLC / MELISSA BRENT
SG2000335 / CONSTRUCTION
Install 1 illuminated wall sign & 1 illuminated blade sign - JENIs ICE CREAM
1150 5TH ST SE   
07/01/20 
DISTRICT OF COLUMBIA / CASEY STRINGER; TBD; TBD
BCIV2000113 / CONSTRUCTION
DGS PROJECT VAN NESS ELEMENTARY SCHOOL INITIAL PHASE FOR SITE DEMOLITION AND SITE CONSTRUCTION STAGING AREA FOR THE INSTALLATION OF TWO TEMPORARY SCHOOL TRAILERS TO BE SUBMITTED UNDER A SEPARATE PERMIT.
   
07/08/20 
DISTRICT OF COLUMBIA / CASEY STRINGER; NA
B2008863 / CONSTRUCTION
DGS PROJECT Minor interior classroom renovations at existing school
150 I ST SE   
07/02/20 
SQUARE 737 LLC / JASON D DORRIS
AH2001626 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
151 M ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI; NA
SB2000292 / CONSTRUCTION
WSP will be advancing approximately 50 soil borings to 30 feet, and an additional 8 borings to 4 feet via direct push. A water sample will be collected from 3 of the deep borings. All borings will be abandoned via bentonite grout mix. Investigation derived waste will be stored in DOT 55-gallon steel drums. Private and public utility locating will take place prior to the work beginning
250 M ST SE   
06/19/20 
WILLIAM C SMITH / null
E2008622 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
M2002834 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
P2006931 / SUPPLEMENTAL
   
07/10/20 
SQUARE 769 LLC / null
E2009225 / SUPPLEMENTAL
300 M ST SE   
06/18/20 
FEDERAL CENTER LP / null
E2008587 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
06/19/20 
CXS TRANSPORTATION INC / ;
P2006843 / SUPPLEMENTAL
   
06/22/20 
GREYSTAR GP LLC / KIM MITCHELL
B1903035 / CONSTRUCTION
The proposed project is three structures which are connected by a shared below-grade garage, which is one story deep on the east half of the site and two stories deep on the west half of the site. Two structures will be residential, with a total of 756 units, and the third will be a 225-key hotel. The west residential structure (Building 3) is planned to be 13 stories with ground and roof level am...
   
06/25/20 
CXS TRANSPORTATION INC / ;
P2006972 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
06/24/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P2006938 / SUPPLEMENTAL
   
07/08/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
M2002985 / SUPPLEMENTAL
401 WATER ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI
SB2000294 / CONSTRUCTION
WSP will advance 23 soil borings to 30 feet and 8 additional borings to 4 feet using direct push. A groundwater sample will be collected from 2 of the deep borings by installing a temporary well. Soil boirngs will be abandoned with bentonite / grout mix. IDW will be stored for disposal in DOT 55-gallon drums. A private and public utility mark out will be completed priot to starting intrusive w...
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.