Page Through from Before to After
 It did not take long for the news to explode on social media that the Aslin Beer Company will be launching a game-day beer garden at the corner of 1st and N, SE, a block away from the Center Field Gate, starting on April 5, the day of the Nats home opener. It will generally run from about two hours before each game until two hours after, and the company's Instagram post says that "starting as soon as May, we will also be open on non-game days throughout the summer." However, the Instagram feed for the beer garden itself (which might be hinting at being called the Sandlot) says that the pop-up will run until July 8. My understanding is that the owners of the lot are expecting to start construction after the All-Star Game on the two-story bar/restaurant that has been planned for that site since the F1rst development was announced. (I shall take to calling this lot the Outpost, since it is separated from its F1rst sibling by the Hampton Inn.) Whether that actually comes to pass, We Shall See. In other tidbits that I really need to get out of the hopper: * DECLARATION: There apparently are now signs at Declaration that it will open on April 5. Still waiting for an official date from Oath Pizza.  * 71 POTOMAC: Looks like Dock 79's 264-unit sibling currently dubbed 71 Potomac is going to get underway Any Minute Now (if digging hasn't already started). It will also have 12,500 square feet of retail, and will be built immediately to Dock 79's west. (WBJ) * SUMMER MOVIE LINEUP: Here's the schedule for Canal Park's Thursday Night Summer Movie series, running from June 7 through Aug. 23. * CIRCULATOR SUMMER HOURS: April 1 is almost here, which means it'll be time for the DC Circulator Union Station-Navy Yard route to switch to its summer hours, running from 6 am to 9 pm Monday-Friday and 7 am to 9 pm on Saturdays, plus extended hours when the Nats are at home, running until midnight for every game beginning at 4:05 pm or later as well as from 10 am to 10 pm for Sunday home games. * (UPDATE I) CHLOE LUNCH: Just across the transom is the news that Chloe at 4th and Tingey is now serving lunch on weekdays from 11 am to 2 pm. "Designed to be carryout friendly," it will include a rotating selection of options like enchiladas and banh mi.
JDLand.com Home
RMP says: (3/29/18 11:08 AM)
By my count, if you're into outdoor drinking this summer the choices are almost overwhelming: Aslin/Sandlot, Brig, Bullpen, Dacha (maybe?), and the not-to-be-named place under the bridge. Plus all the patios (Bluejacket, Saltline, etc.) and the new outposts on the Yards Park boardwalk. What else did I miss?
Ampersand says: (3/29/18 11:25 AM)
It looks like JD already retweeted, but All-Purpose opens today at 5pm! GARLIC KNOTS
JD says: (3/29/18 11:27 AM)
It's a soft opening today and Saturday. Real opening is Tuesday.
202_cyclist says: (3/29/18 11:47 AM)
"However, the Instagram feed for the beer garden itself (which might be hinting at being called the Sandlot) says that the pop-up will run until July 8." You're killing me smalls.
202_cyclist says: (3/29/18 11:48 AM)
@RMP-- one of our friends used to drink whiskey under the I-395 bridge, so there is always that option for outdoor drinking as well.
ttassa says: (3/29/18 1:54 PM)
Hate to criticize, but the Aslin folks sure did select a logo (via the instagram post) that looks too much like the Braves script "A"!
snakegriffin says: (3/29/18 5:29 PM)
Looks like Declaration is open right now, actually. May be a soft open or something.
JD says: (3/30/18 2:16 PM)
And here's an unexpected item to share. This is an official rendering of Paradigm's project at 1000 1st St., SE.
jdc says: (3/30/18 4:27 PM)
Those purple lights remind me of the light show on Homewood suites.
202_cyclist says: (3/31/18 6:58 PM)
Asking for some friends— when is the Whole Foods opening?
NavyYardNittany says: (3/31/18 8:52 PM)
Workers back on site yesterday on the large parking lot bordered by First/Half/K/I. Building wooden traffic signs/construction warnings, and have placed no parking signs along K that run through July. Would assume this means their permit issues have been resolved and we should expect work to resume there this week. That area is going to be an absolute mess.
202_cyclist says: (4/1/18 8:47 AM)
Our friend, and Navy Yard resident, will have her food truck, Deco Deli parked at Canal Park on Thursday, April 5, for opening day. Deco Deli offers a menu of delicious sandwiches. I encourage you to try lunch (and breakfast!) from their truck this week. link
dude says: (4/2/18 10:44 AM)
@202 yes! I’m coming home from Cincy today and it was so strange not hearing the horn and Chuck Brown after all of the wonderful home runs the Nats hit this weekend.
NavyYahd says: (4/2/18 4:07 PM)
Eighteen Eight's location in Foundry Lofts appears to be officially dead. link
(oops, image URL included with this comment didn't work!)
NavyYardRes says: (4/2/18 4:29 PM)
What is with all the yellow brick on new buildings? Bulk discount? -Park Chelsea -Agora -South Cap & I -1000 I St. Did I miss any?
EnvySquared says: (4/2/18 7:14 PM)
via Eater DC: "Grilled pizza chain Oath Pizza is working on opening its second location in the area, posting new signage at its forthcoming outpost near Nationals Park (110 M Street SE) alerting locals that “you’re invited to our grand opening celebration.” The Massachusetts-based company, which opened its first shop outside Boston last fall in Mosaic District, has not announced an opening date for the Navy Yard store." link
JD says: (4/2/18 8:53 PM)
They probably wrote that after seeing my photo of the signage. It's been there for a few months.
RMP says: (4/2/18 10:40 PM)
Now I'm super curious about the story behind 18-8. They built it out 90%, left it like that for months, then abandoned it? Why?
JD says: (4/2/18 10:54 PM)
I heard it was something having to do with a licensing issue.
202_cyclist says: (4/4/18 12:04 PM)
@NavyYardRes: The building on 2nd Street, across from Canal Park, also looks like it will have yellow brick. I can only assume the developers were fond of the Wizard of Oz. That seems like the only reasonable explanation.
Ampersand says: (4/17/18 4:14 PM)
@CJBabyDaddy Goodbye, Yellow Brick Road... we're gonna take it apart and use it for a building Not as catchy, I guess.
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
No records added or modified in the past two weeks. |
|
Recent Issued Building Permits
| Archive
|
|
1300 4TH ST SE 1001
|
|
02/22/21
AP BOWER RETAIL LLC / null
E2104231 /
SUPPLEMENTAL
|
1346 4TH ST SE APT 1M
|
|
02/06/21
null / NA NA NA
EHOP21945129 /
HOME OCCUPATION
|
1331 4TH ST SE R-2
|
|
02/08/21
FC 1331 LLC / FC 1331 LLC
BP2101814 /
POST CARD
|
10 I ST SE
|
|
02/16/21
CAPITOL HILL RACQUET CLUB / NA; VICTORIA STEINHOFF
SB2100112 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
555 L ST SE
|
|
01/29/21
UNITED STATES OF AMERICA / RENNE WELL; RICK HARLAN SCHNEIDER
B2102004 /
CONSTRUCTION
DGS PROJECT REHABILITATION+RESTORATION OF THE HISTORIC LINCOIN FIELDHOUSE
|
861 NEW JERSEY AVE SE 20003
|
|
02/23/21
809-853 NEW JERSEY AVE ACQUISITION LLC / SUSANA VAZQUEZ
AH2100728 /
CONSTRUCTION
Dismantling of tower crane.
|
809 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC 809-853 NEW JERSEY AVENUE ACQUISITION LLC / null
E2103926 /
SUPPLEMENTAL
|
853 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC / null
E2103924 /
SUPPLEMENTAL
|
861 NEW JERSEY AVE SE
|
|
02/05/21
GS CSX HOTEL OWNER LLC / null
E2103762 /
SUPPLEMENTAL
|
1275 NEW JERSEY AVE SE
|
|
02/02/21
FC 1275 NJ LLC / null
E2103662 /
SUPPLEMENTAL
|
|
|
02/11/21
FC 1275 NJ LLC / null
P2103445 /
SUPPLEMENTAL
|
848 SOUTH CAPITOL ST SE
|
|
02/16/21
CXS TRANSPORTATION INC / VICTORIA STEINHOFF; TBD
SB2100111 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|