Since January, 2003
            
 (a random before-and-after moment)
October 29, 2008
September 29, 2018
3rd at River St., Looking Northwest (see more)

It has taken me much longer to clear the post-surgical cobwebs from my brain than I expected, so don't have many expectations for this post. I just hope it's in English. (But the hip repairs--NOT REPLACEMENT!--went well, and I should start getting off of crutches soon.)
* SPRINT STORE: I have said for years that no new neighborhood has truly arrived until it gets its first cellphone retailer, and I would not have guessed it would take until 2018 for that box to get checked, but numerous approved building permits indicate that Sprint will be opening a store in the old Sizzlin' Express space on the northwest corner of 4th and M.
* DOUGLASS BRIDGE GROUNDBREAKING: As if to taunt me after 15 years of watching and waiting, the Feb. 13 ceremonial groundbreaking for the new Douglass Bridge and associated first-phase improvements to the South Capitol Street Corridor was held while I was very much horizontal and hopped up on goofballs. But since it's right on our DMZ line, SWill was there and took some photos. Estimated completion date is 2021. (Speaking of SWill, he is the one to read for coverage of Buzzard Point, since that is outside my purview.)
* TUNNEL DOINGS: The last section of wall on the new Virginia Avenue Tunnel was poured on Feb. 22. an effort that overall totaled three miles of 24-foot-tall concrete. Meanwhile, 3rd Street should be reopening to two-way traffic Any Minute Now, which then paves the way (sorry) for both the 4th and 5th Street intersections to close, probably in mid-March, to dismantle the temporary bridge decks and complete the new tunnel's roof in those blocks, and wrap up the final street restoration. And no, the 6th Street exit ramp from the freeway won't close. The entire project is "on time," for completion this fall, according to CSX.
* ANOTHER PROJECT READY TO GO: A shoring/sheeting/excavation permit has been approved for the second phase of the "Riverfront" project, aka the Florida Rock site. This will be a 13-story, 260ish-unit residential building with about 12,000 square feet of retail, and will go up immediately to the west of Dock 79. When I'm a little more mobile I'll write a roundup of what's currently underway.
* WINERY HAPPY HOUR: If you don't have a supply of post-surgical painkillers like some people, there's now a Happy Hour at District Winery, from 3:30 to 6:30 pm Monday through Friday, with $8 signature cocktails and select wines, $5 select beers, and 50 percent of District Winery wines by the bottle.
There's probably more, but this wore me out. Hey, it's a start.
Comments (32)
   
 
 More Recent News

JDLand.com Home

Comments

NavyYardRes says: (2/27/18 11:17 AM)
WC Smith seems to be moving quickly with The Garrett and crane watch has begun. The crane began assembling yesterday! What will total count be for JDLand?


jdc says: (2/27/18 11:21 AM)
Welcome back! Good timing to get all healed-up, as you're just in time for spring and what will surely be a banner year for construction (and eating).


JD says: (2/27/18 11:25 AM)
Added the Winery happy hour tidbit, since it's been sitting in my inbox for more than a week and I still couldn't manage to remember to include it today.

As for the crane count, if it's more than all my fingers and toes, I can't count that high right now.


stacycloyd says: (2/27/18 11:26 AM)
welcome back!


NavyYardRes says: (2/27/18 11:30 AM)
Does anyone have additional insight on the Tishman-Speyer lot development? link

Last week the surface lot closed and pedestrian barriers were put in place on I and 1st street eliminating parking. A few days later the barriers were placed in the empty lot. Do they have permits?

Having worked from home recently and driving through JDLand during business hours the roads are being clogged with construction vehicles, roads are failing, potholes are forming, and I cringe at the day a pedestrian is significantly injured at NJ & I st.


JD says: (2/27/18 11:46 AM)
There is precious little info about the Tishman site, other than it's going to be about 800 units across the entire block and lots of retail. They've applied for their excavation permit but it doesn't appear to have been approved yet.

I have not seen any online versions of their renderings yet, but I think they showed them at a public meeting a few weeks ago.

My project page, which is a bit sad while it waits for fresh details:
link


RMP says: (2/27/18 11:49 AM)
Welcome back! Now we move the countdown timer to the arrival of the new dental suite? Chloe has a winter happy hour and I went once and I think a beer was $7 or $8 (on special!) so I don't really plan to return again for Happy Hour there.


JD says: (2/27/18 12:00 PM)
I am starting to think about a spring JDLand happy hour at the Brig.


202_cyclist says: (2/27/18 12:35 PM)
JD-- welcome back. Can you draw a rendering for the Tishman development, like you did for One Hill South. Also, with that lot, where will Handy Bikes relocate? Pete provides an excellent service for the neighborhood, with good quality repairs and honest service.


ColoradoCane says: (2/27/18 1:06 PM)
I walked by the Tishman site on Friday night and saw that there was a notice posted on the front gate. The notice said the permit had been revoked and to move the barriers immediately. The next morning, Saturday, the barriers were removed. No idea what this all means, but figured I would add my two cents.


rpb says: (2/27/18 1:31 PM)
This is a few weeks old now, so no update on recent barrier happenings at the site, but some info on the Tishman site was posted on Facebook: link


jdc says: (2/27/18 3:23 PM)
great info rpb.


malatesta says: (2/27/18 7:35 PM)
Crane count will be 14 once the Garret crane is up, by my count.


CJBabyDaddy says: (2/27/18 10:12 PM)
You’re “starting to think about a spring JDLand happy hour” at the Brig?!?!?!

Then it sounds like the rest of us need to hurry up and start depleting some kegs wherever possible to get into mid-season form ASAP.


sameter says: (2/28/18 1:52 AM)
3rd street was two way as of 10pm on 2/28. not sure if 4th or 5th was shut down.


JD says: (2/28/18 2:14 AM)
Wow, 3rd Street's change happened after I saw it as still one way at about 1:30 pm.


Snacks says: (2/28/18 10:14 AM)
@NavyYardRes it's likely just a matter of time until someone gets hurt at NJ & I. That intersection gets crazy at rush hour and during baseball games. Having left turn lanes, while necessary, has created a dangerous situation, especially as drivers get impatient because of all the pedestrians they have to wait for. As someone who uses that intersection daily I have to keep my head on a swivel for sure.


202_cyclist says: (2/28/18 11:39 AM)
@Snacks-- I am not a traffic engineer but I think NJ & I will eventually need a traffic signal with the volume of vehicles and the confusion that intersection creates.

JD-- "But since it's right on our DMZ line, SWill was there and took some photos." Are you suggesting SWill is Rocket Man?


NavyYardGuy says: (2/28/18 11:46 AM)
Welcome back JD.

A spring HH at the Brig sounds great!

Has anyone heard any scuttlebutt about Navy Yard possibly getting a Target? I'm not one to be envious but...I was read that the Ivy City Target is forthcoming--it seems like the neighborhood would really welcome it.


Ampersand says: (2/28/18 11:48 AM)
3rd Street was two-way at 7:00 last night, which caught me off guard. I think it might have been flipped very shortly before I passed by. In other news, there's a big sign up just north of Virginia on 4th, claiming that 4th Street will close on March 12th.


RMP says: (2/28/18 11:53 AM)
I'm not sure I could even imagine where a Target would go. Plus the battle over parking garage space that would accompany that would be brutal. But I could be completely wrong as well.


malatesta says: (2/28/18 12:16 PM)
I bet there's enough total space to do a small format target if you took up all the retail space in one hill south?


202_cyclist says: (2/28/18 12:36 PM)
@RMP-- I don't know about how much of an issue parking would be for a Target in our neighborhood. I think most of the parking spaces at the DC USA shopping center in Columbia Heights goes unused. Perhaps a Target in the Navy Yard could work out an arrangement for use of the Nats Park garages for the times when there aren't games.


JD says: (2/28/18 12:40 PM)
Target is probably just waiting for the inevitable HQ2 announcement.


caphillguy says: (2/28/18 12:42 PM)
If we're counting tower cranes only, I believe there are 11 cranes in the neighborhood currently - The Garrett would make 12.


stacycloyd says: (2/28/18 1:19 PM)
@snacks and 202_cyclist, the ANC asked for a signal at NJ and I in 2016 and DDOT said there wasn't enough traffic yet. I even stood on the corner and counted cars to try and change their minds. I agree that it's not a pleasant intersection to walk or drive through (assume biking isn't any better). Ubers, Uhauls, and other vehicles blocking the bike lane and pedestrians crossing outside of crosswalks on the unit block of I also add to the confusion.


Ampersand says: (2/28/18 2:48 PM)
@stacycloyd I was at an I Street redesign meeting where the DDOT rep said the same thing, to many protests. I think the biggest issue is that drivers are bad at taking turns. I nearly collided with a car last week when the driver decided that their turn was immediately after the car in front of theirs went, even though the cross traffic was already moving. Why wait when you can just make someone else slam on their brakes?

I find it ridiculous that there's a traffic signal at the "intersection" of 1st and Potomac SE, but they don't want to put one in at New Jersey and I based on a traffic count performed about 5,000 residents ago.


jdc says: (3/1/18 8:09 AM)
There are several intersections in JD Land that are no longer suitable for how the neighborhood is developing. Some, like NJ, need an overhaul and I suspect more signalized intersections may be in order. Other streets could possibly go on a diet - I always find First Street north of M Street to be too wide for the traffic it carries.


JD says: (3/1/18 10:11 AM)
And yes, before anyone posts, I am working right now on an update on three big news stories this morning.


SWag says: (3/1/18 11:49 AM)
If SWill is Rocket Man is JD ..... Trump?!? Happy Hour Dance Battle? Navy yard vs SW. LOL!


Westnorth says: (3/2/18 11:32 PM)
There was a rumor about unnamed big boxes interested in a space behind the Cap Skyline hotel, since it's right-in / right-out for Maryland commuters headed home on So Cap. The Wharf has also done some test-fit plans with potential big boxes, but none ended up in Phase 1.

I can't see any equivalent spaces in Cap Riverfront, except for the current Harris Teeter. Then again, Targets now come in sizes all the way down to CVS-size (13,000 sq. ft.), so you never know.


NavyYardNittany says: (3/20/18 6:16 PM)
“RMP says: (2/28/18 11:53 AM)
I'm not sure I could even imagine where a Target would go. Plus the battle over parking garage space that would accompany that would be brutal. But I could be completely wrong as well.“

Something similar to the “urban” Target on Wilson Blvd in Rosslyn would be a perfect fit in the neighborhood. No dedicated parking there, though there are public lots around it, as there are here. The OHS footprint probably isn’t large enough if they’re still trying to fit a Soul Cycle in, but with all the new buildings going up seems as though an appropriate space could be found. Anything to keep me from having to go to the nation’s worst CVS would be welcome.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

caphillguy on Transportation Study Meeting: For everyone's information: the intersection at Virginia Ave and 7th Street was ...
JD on Transportation Study Meeting: Some details on Walters Sports Bar, still planning on coming to the space below ...
202_cyclist on Transportation Study Meeting: Exciting news folks! It looks like there was soil testing today for the former ...
CJBabyDaddy on Transportation Study Meeting: @RMP & @jdc: Sign on the front door says: “We are waiting on some officia...
conngs0 on Transportation Study Meeting: JD, thanks for passing along the update on the Capper Seniors building. I suppo...
jdc on Transportation Study Meeting: @RMP - in what manner? Nothing special, or no one went?
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
200 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/14/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/13/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/13/18
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/09/18
1100 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/08/18
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/06/18
UNIT B/O N ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/05/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/01/18
1200 B/O HALF ST SE   ROBBERY  11/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/28/18
700 B/O L ST SE   THEFT
Shoplifting
 11/26/18
1255 1ST ST SE   ASSAULT WITH A DANGEROUS WEAPON  11/25/18
1200 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/23/18

Recent Issued Building Permits Archive  
1300 4TH ST SE 1ST FL   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902414 / SUPPLEMENTAL
1300 4TH ST SE   
12/11/18 
PARCEL O 1-LLC / N/A
B1900015 / CONSTRUCTION
Yards Parcel O1 - Revision to Base Building Permit B1609947 to incorporate minor design changes including converting a residential unit to a fitness center. TPR
1300 4TH ST SE B1   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902413 / SUPPLEMENTAL
1331 4TH ST SE CU   
12/10/18 
FC 1331 LLC / null
P1902045 / SUPPLEMENTAL
1300 4TH ST SE PENTHOUSE   
12/12/18 
null / WAYNE DAUGHERTY 7035247911
E1902412 / SUPPLEMENTAL
1300 4TH ST SE   
12/10/18 
PARCEL O-1 LLC / RICHARD V CAREY 301-424-8899
FB1900032 / SUPPLEMENTAL
(2) NEW INSTALL Gross 1,840,000 BTU / HR Natural Gas HW
1346 4TH ST SE   
12/07/18 
FC 1346 LLC / null
FB1900031 / SUPPLEMENTAL
1000 5TH ST SE   
12/11/18 
UNITED STATES OF AMERICA / null
E1902394 / SUPPLEMENTAL
   
12/11/18 
UNITED STATES OF AMERICA / BRANDON WILSON; BRANDON M WILSON
B1902777 / CONSTRUCTION
Kitchen Area: -Interior only Frame about 7lf around one column as per 2 / A030 -Add 260 SQF bulkhead as per 1 / A030 None Load bearing wall on first floor and second floor.. M,E,P, will be provided on another permit. IT Lounge -Add 194 SQF bulkhead as per 3 / A030
2 I ST SE   
12/10/18 
MCDONALDS CORPORATION / KIM MITCHELL
B1814290 / CONSTRUCTION
The submitted drawings are a revision to those approved under building permit #B1703907, and include the incorporation of a new corridor connection at the roof level between phase 1 and phase 2 buildings, and corresponding revisions. Revised Mechanical / Plumbing / Electrical drawings are included to reflect the change of Engineers of Record. Interior Design Drawings are also included. Various...
250 M ST SE   
11/28/18 
SQUARE 769 LLC. / CONOR LAW
BCIV1800147 / CONSTRUCTION
New construction of erosion and sediment controls, domestic water service, fire service, sanitary sewer service, storm sewer service, curb & gutter, street trees, misc. landscaping, sidewalk, storm water management.
   
12/05/18 
null
E1902214 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE STE# 420   
11/27/18 
SQUARE 742 LLC / JAMES W LASHER
E1901850 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/20/18 
SQUARE 742 LLC / null
E1901715 / SUPPLEMENTAL
   
11/26/18 
SQUARE 742 LLC / null
P1901600 / SUPPLEMENTAL
   
11/26/18 
SQUARE 742 LLC / null
M1900652 / SUPPLEMENTAL
   
11/29/18 
SQUARE 742 LLC / JOE SAFFER
P1901753 / SUPPLEMENTAL
   
12/04/18 
SQUARE 742 LLC / PAUL WHITLEY
AN1900004 / CONSTRUCTION
This project consists on installing (9)proposed antennas , RRU's, and hybrid cables on an existing building, and removing (9) existing antennas, RRU's, TMA's, and hybrid cables.
   
12/05/18 
SQUARE 742 LLC / JOHN M. GIUSEPPE
B1900960 / CONSTRUCTION
renovations to 3rd floor office space SUITE 300 NATIONAL ASSOCIATION OF AREA AGENCIES ON AGING as shown on the electronically submitted mech., plumb., elect., fire protection, demolition, and architectural dwgs. Interior work only. No change in use. NO structural work involved. 7000 sf. **LEVEL 2 ALTERATION, DEMOLITION
125 O ST SE 2-6FL   
11/28/18 
DISTRICT OF COLUMBIA / ANDREW KLEIN 2408991526
E1901923 / SUPPLEMENTAL
125 O ST SE   
11/27/18 
DISTRICT OF COLUMBIA / MICHAEL P. LYONS
E1901853 / SUPPLEMENTAL
   
11/27/18 
DISTRICT OF COLUMBIA / WILLIAM H. JONES
E1901854 / SUPPLEMENTAL
   
11/29/18 
DISTRICT OF COLUMBIA / WESLEY R. DAVIS
E1901951 / SUPPLEMENTAL
   
11/29/18 
DISTRICT OF COLUMBIA / null
P1901748 / SUPPLEMENTAL
79 POTOMAC AVE SE   
11/27/18 
RIVERFRONT HOLDINGS LLC / null
AH1900270 / CONSTRUCTION
AFTER HOURS 7PM TO 7AM FINAL CONNECTION OF RELOCATED 8” SANITARY LINE
71 POTOMAC AVE SE   
11/26/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
B1804337 / CONSTRUCTION
New 264-Unit 13-Stories Apartment House
   
12/03/18 
RIVERFRONT PROPERTIES LLC / null
P1901813 / SUPPLEMENTAL
   
12/13/18 
RIVERFRONT HOLDINGS LL, LLC / PARKER HARRELL
SB1900071 / CONSTRUCTION
Abandoning 20 temporary wellpoints and 3 gravel packed wells originally installed for dewatering during construction.
79 POTOMAC AVE SE   
12/13/18 
RIVERFRONT HOLDINGS I LLC / null
E1902479 / SUPPLEMENTAL
227 TINGEY ST SE   
11/30/18 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1900285 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete façade panels. Work to take place 7PM to 7AM, 12 / 5 / 2018 to 1 / 5 / 2019.
300 TINGEY ST SE   
12/04/18 
FC BOILERMAKER LLC / STEPHEN ADAMS 2403042373
E1902120 / SUPPLEMENTAL
   
12/06/18 
FC BOILERMAKER LLC / GARY BRENT; N/A
SG1900027 / CONSTRUCTION
Install 1 illuminated edge-lit wall logo sign, 1 illuminated halo-lit letter sign, 1 double-sided push thru edge-lit blade sign - LULULEMON
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.