Since January, 2003
            
 (a random before-and-after moment)
February 16, 2006
March 29, 2015
Cushing at M, Looking East-Northeast (see more)

I somewhat unexpectedly found myself wandering around on Sunday, and though the official JDLand camera stayed home and drank hot chocolate, the JDLand cellphone (a Pixel 2, thanks for asking) stepped in to catch some progress pics.Here's a rundown:
* HELLO, AVIDIAN: After being burned multiple times over the years with projects being said to include condos during the design phase only to end up as rentals, it's nice to have confirmation via the purty new fence signage at South Capitol and M that not only that the corner will be home to the new headquarters for the National Association of Broadcasters, but that the sibling building immediately to the south that was oddly dubbed 10 Van is now known as the Avidian, and that it will be condominiums, "Selling 2018." The building should have 170ish units and will probably be completed in 2019.
* PEEKING OUT: We have three newcomers to ground level, as the 380-unit apartment building at South Capitol and I is now clearly visible from the street, as is the 190-unit rental sibling to the further-along Bower at Yards Parcel O on 4th Street. Plus, the 420-unit West Half building immediately north of Nats Park now has its first batches of rebar out of the ground, if your eyes know what to look for. (And yes, I'm still completely failing at catching the work underway on what's now known as the Emblem at Barracks Row, the 20-unit condo building at 8th and Virginia. One of these days.)
* ONWARD AND UPWARD: The new DC Water HQ continues to get its face put on, while the condo building known as the Bower at 4th and Tingey has completed seven of its 10ish floors, and at 2nd and L the next Capper mixed-income building is through Floor #4 of its own 10ish floors. {Trying to avoid any arguments about whether penthouses = floors.}
* DOWN ON THE CORNER: There's officially another project underway, as digging is now proceeding at 2nd and I for The Garrett, the third and final portion of WC Smith's "Collective" development that also includes the Park Chelsea and Agora (and this, of course). Meanwhile, there are still holes at the second phase of the Parc Riverside at Half and L (below), and at Monument Valley, which is impossible to get a shot of from street level so you'll just have to imagine it. And I forgot to look behind the fence at Parcel L.
There will probably be some new holes in the ground in coming months, as both the rumor mill and the permitting pipeline hint that at least three more projects will get underway: Dock 79's residential sibling at the old Florida Rock site, the large residential development on the old "Congressional Square" site at 1st and K, and Paradigm's 275ish-unit residential building on the old Market Deli site at 1st and L. (Though I'll note that each of these still do not have permit applications in the system yet beyond the initial shoring/sheeting/excavation step.) The number of still-empty lots keeps a'shrinking....
Comments (17)
   
 
 More About Development News

JDLand.com Home

Comments

202_cyclist says: (12/11/17 1:05 PM)
Thank you for this update. I am glad to see you survived the DC blizzard, the most exciting natural disaster to strike our neighborhood since the GREAT DELAWARE EARTHQUAKE OF 2017!!!


RMP says: (12/11/17 3:18 PM)
Thanks for the update, JD!

I actually LOL'd at the rendering on the Avidian website. I guess it would be nice if the Capitol were only a couple blocks away, the freeway didn't exist, and people actually walked along South Capitol.

Put me down vote a vote in the penthouse = floor camp.


CJBabyDaddy says: (12/11/17 7:43 PM)

Nothing gets me in the holiday spirit more than JD’s posting of the final SH&F Survey.

Hey, don’t judge.


202_cyclist says: (12/12/17 6:35 AM)
We went to Rasa last night. I got the lamb and my wife ordered the Chicken tikka. The food was absolutely delicious, the service was great, and the restaurant has a very nice interior. It’s a good addition to the neighborhood.


Ampersand says: (12/12/17 9:05 AM)
I'm too lazy to see if it was scooped in a different post or thread, but apparently Chipotle is opening at 10:45am on Thursday! First 25 in line get a buy-one-get-one coupon and a t-shirt.


sameter says: (12/12/17 9:07 AM)
Chipotle is opening on thursday the 14th, saw something on facebook last night, wishing now that i screenshot it.


Ampersand says: (12/12/17 9:12 AM)
An attempt to post the chipotle notice should be below...



NavyYardRes says: (12/12/17 10:38 AM)
The condo fee's at the Bower are high considering no pool (500+ per month). I can only imagine what they will be for Avidian with a pool. Do we know of any Condo's in the pipeline with no amenities?


202_cyclist says: (12/12/17 11:05 AM)
The development at 8th and Virginia is moving quickly. It looks like the stairs have been installed and Bozzuto is already starting construction (wood) on the second floor.

Will these be apartments or condos? If they are condos, they might be more affordable since they won't have the expensive amenities other new residential buildings have.


jdc says: (12/12/17 11:19 AM)
Man, those will be some rough views in that apartment building at S. Capitol and I...you either see the dome, or traffic.


JD says: (12/12/17 11:20 AM)
Some of us consider dome-and-traffic views to be a dream come true. :)


JD says: (12/12/17 11:24 AM)
801 Virginia (the Emblem) is supposed to be condos.


RMP says: (12/12/17 12:00 PM)
I'd be awfully nervous about buying a condo in a building made out of wood unless there were some serious reassurances that the soundproofing is solid.


202_cyclist says: (12/12/17 12:30 PM)
@RMP-- I absolutely agree but since it is only 3 - 4 floors of wood-framing, perhaps the noise issues will be less than other wood structure buildings.


JES says: (12/13/17 10:10 AM)
@ NavyYardRes & 202,

We live in Velocity and we see our building's budget every year. You'd be surprised at just how little those amenities actually cost to provide compared to the cost of just running the building. We've got a payroll of I believe 13-14 people (some full-time, some part-time) and their salaries plus reserve contributions make up an overwhelmingly large portion of the budget.

In other words, condo fees in any large multiunit building are going to be high. You need a GM, a rotating staff to staff the front desk, cleaning staff, maintenance staff, etc. The cost of running and maintaining stuff like a gym and pool is negligible in comparison. Even a "no amenity" building is gonna cost a lot to run.


202_cyclist says: (12/13/17 11:46 AM)
Jes-- I agree, I think it is the cost of having a receptionist in the building 24 hours per day. Also, it is nice having janitorial staff in our building every day to keep the building clean but it also adds to the cost.

Having an elevator and underground parking (which I think the 8th and VA Ave building won't have) also contributes to costs.


JES says: (12/13/17 12:37 PM)
801 will probably still have an elevator for moving purposes at the very least. And it'll have insurance policies and other things. It'll probably have lower fees than all the high rises, but I'd be shocked if they were THAT much lower. (Though the Bower's seem insane to me. They're significantly higher, percentage wise per square foot, than Velocity's).

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

CJBabyDaddy on Catching Up on: The initial Maxwell/Albi PR launch described their future joint location as bein...
Alex B. on CSX East Three-Building: I don't see how the canal's lack of presence reflects a lack of history. The big...
CJBabyDaddy on CSX East Three-Building: Many unexecuted plans have the advantage of being perfect in someone‘s eyes, and...
rdotis on CSX East Three-Building: Carroll Creek Park, Frederick, MD: https://www.flickr.com/photos/22711505@N05/28...
rdotis on CSX East Three-Building: The failure to take advantage of the location of the historic Washington Canal (...
Westnorth on CSX East Three-Building: All I can see on that site plan is the word "HII"
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/16/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/15/19
70 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/15/19
1100 B/O NEW JERSEY AVE SE   THEFT
Shoplifting
 09/13/19
300 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 09/13/19
400 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/11/19
400 B/O M ST SE   THEFT
Shoplifting
 09/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 09/09/19
54 M ST SE   BURGLARY
Burglary Two
 09/07/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 09/05/19
400 B/O M ST SE   THEFT
Shoplifting
 08/30/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O M ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/28/19
800 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/28/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/28/19
500 B/O L ST SE   ROBBERY  08/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/23/19
300 B/O K ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 08/23/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/22/19
1100 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/21/19
300 B/O L ST SE   BURGLARY
Burglary One
 08/21/19
100 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 08/20/19
1200 B/O SOUTH CAPITOL ST SE   ROBBERY  08/20/19

Recent Issued Building Permits Archive  
1346 4TH ST SE   
09/11/19 
FC 1346 HOLDCO I LLC / null
E1911472 / SUPPLEMENTAL
900 5TH ST SE   
08/30/19 
CAPPER CARROLLSBURG VENTURES, LLC / DFM DEVELOPMENT SERVICES, LLC
B1906215 / CONSTRUCTION
Reconstruction of 4-story residential building, the Arthur Capper Senior Center, damaged by fire.
200 I ST SE   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904525 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904526 / POST CARD
   
09/04/19 
DISTRICT OF COLUMBIA / ROGER L PEACE
BP1904529 / POST CARD
100 M ST SE 9TH FLOOR   
09/05/19 
SQUARE 743 INC / DAVID FLEMING; DAVID FLEMING
P1909280 / SUPPLEMENTAL
100 M ST SE SUITE 910   
08/22/19 
SQUARE 743 INC / null
E1910764 / SUPPLEMENTAL
100 M ST SE   
09/05/19 
SQUARE 743 INC / FREDERICK S. DONHAM; FREDERICK S. DONHAM
P1909275 / SUPPLEMENTAL
ONE OPEN SITE DRAIN
250 M ST SE   
08/26/19 
null / ;
P1908962 / SUPPLEMENTAL
   
08/27/19 
SQUARE 769 LLC / STEVEN CHEN
AH1901196 / CONSTRUCTION
After hours permit is respectfully requested from 3am to 7am daily.
   
09/04/19 
SQUARE 769 LLC / JEFFREY D WOLF
AH1901226 / CONSTRUCTION
After hours permit respectfully requested from 3 am to 7 am daily.
410 M ST SE   
09/16/19 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / MICHAEL B. BELL; MICHAEL B. BELL
E1911625 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
08/26/19 
CSX TRANSPORTATION, INC / ; N/A; TBD
R1900100 / CONSTRUCTION
RAZE 1 STORY WOOD FRAMED STRUCTURE
1100 NEW JERSEY AVE SE   
08/22/19 
SQUARE 742 LLC / null
E1910802 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
08/23/19 
UNITED STATES OF AMERICA / ROBERT K WILLETT; ROBERT K WILLETT
E1910857 / SUPPLEMENTAL
   
09/03/19 
UNITED STATES OF AMERICA / PARKER HARRELL; PARKER HARRELL
SB1900287 / CONSTRUCTION
We propose to furnish and install fifteen (15) gravel packed wells, fourteen (14) around the perimeter, and one (1) at the elevator pit. We will also be installing 3 monitoring wells and potentially 5 contingency wells. We will only pump from up to 15 wells at a time. All wells will be located in a mutually agreed layout. The wells will be installed by advancing up to a 10.25 I.D. hollow stem auge...
125 O ST SE   
09/13/19 
DISTRICT OF COLUMBIA / FRED T FALCONE; JOSEPH SCRIBELLITO
SB1900423 / CONSTRUCTION
Soil borings to collect samples and installed a grouted in place vibrating wire piezometer approximately 30 feet below grade. Two geotechnical soil borings to 75 feet below grade, and 3 soil borings to 20 feet below grade with 5 feet of coring though buried foundations.
301 TINGEY ST SE C-1   
09/03/19 
SEFC 160, LLC / JEFF NOLD
AH1901221 / CONSTRUCTION
Work will occur on 3rd Street SE between Tingey St SE & Water St SE. We will be assessing and providing a CCTV inspection of a sewer line.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.