Since January, 2003
            
 Sliding from Before to After

Time for my quarterly {ahem} update on all of the construction projects you are picking your way past when you walk/drive/bike around the Hood:
I'll start with the new openings and the coming soons, with both Due South Dockside and Morini Piccolo now operating (softly) on the Yards Park boardwalk, and Cava in the Homewood Suites at Half and M in Any Second Now territory:
As for buildings getting their faces on, I present Skanska's 99 M office building and the new DC Water headquarters:
There's also now two new arrivals above ground, as PN Hoffman's condo project The Bower has at last made its debut at 4th and Tingey, as has the DC Housing Authority's as-yet unnamed mixed-income rental building at 2nd and L, both of which are shot from the south instead of the intersection because it's now the time of year when anything shot to the south-southeast, south or south-southwest will look terrible, no matter what time of day:
Next on the assembly line, two more residential projects projects are likely to be making their above-ground debuts before the end of the year: JBG's West Half project directly north of Nats Park, and the McDonalds-slaying 2 I Street project:
Other holes in the ground I won't highlight this time around include the Bower's sibling rental project at 4th and Water, Toll Brother's Parc Riverside Phase II at Half and L, the Jair Lynch residential project at the Half Street Hole, and the combo project at South Capitol and M for the new National Association of Broadcasters headquarters and its next-door residential project labeled 10 Van.
Also, WC Smith has cleared the lot at 2nd and I to make way for the beginning of work on the Garrett, the third and final apartment building that makes up "The Collective" on that block. Plus, fences are up along 3rd Street for the next project in the Yards lineup, the 270-unit apartment building currently known as "Parcel L2." (Great, I have to update my Highlighted Projects map again.)
Just to make sure all ends of the construction spectrum are represented, one hole is even starting to get covered over, and that's in the 200 and 300 blocks of Virginia Avenue, where the Virginia Avenue Tunnel work is far enough along that you can actually start to imagine a street appearing again in those blocks in the coming months:
Finally, I'll close with a shot of a tearing down rather than a building up, and that's the pile of debris formerly known as 37 L Street SE--just in time to mark the 40th anniversary of the Cinema Follies fire, on Oct. 24, 1977.
So, while the neighborhood is taking a back seat these days to all of the excitement surrounding the opening of the Wharf down the road, there is still a fair amount happening. (And hopefully the neighborhood blogger will someday get back in the groove. Still riding the rollercoaster of my new not-yet-ready-to-call-it-normal.)
Comments (20)
   
 
 More About Development News

JDLand.com Home

Comments

Marc says: (10/23/17 5:28 PM)
Thanks for the updates and photos! Excited about Cava. Have you heard anything about Whole Foods? Has ANYONE? Is it delayed until the Garrett is done or something? Until Amazon re-configures their grocery store vision? I'm sure these get asked a lot, but maybe I missed something. Thanks again!
Marc


JD says: (10/23/17 5:32 PM)
I promise everyone, no matter how bad at this I have become, that the second I have Whole Foods need, I will post it. As of now, there is nothing official.


Marc says: (10/23/17 5:36 PM)
Thank you for the quick reply! I really appreciate your blog.


202_cyclist says: (10/23/17 6:00 PM)
Thank you for the updates-- appreciated. Is lower Barrack's Row outside the boundary of JD Land?


202_cyclist says: (10/23/17 6:01 PM)
Also, I think we need to add 1221 Van to the list of projects that seem like they are taking forevr.


202_cyclist says: (10/23/17 6:01 PM)
*forever.


RMP says: (10/23/17 6:28 PM)
Thanks for the great new pics! It's quite unfortunate timing that the two boardwalk places opened at the very end of patio season. I imagine they are going to be absolutely hopping on Friday nights next summer.

I was just wondering what's going on with 1221 Van. I'm curious which floorplans are going to have the ballpark views and what they're going to ask for them.


JD says: (10/23/17 6:31 PM)
I meant to mention that 1221 Van is at it's due date for starting leasing, but no word that I've heard.

Lower 8th is part of my purview, but in addition to everything else I have a suspected labral tear in my hip and so the notion of walking over there too was untenable. Just pack me up for the home.



JD says: (10/23/17 6:32 PM)
(So, yes, 801 Virginia should have been included in my rundown.)


GG says: (10/23/17 6:32 PM)
Apologize if this has already been pointed out but what is up with them keeping part of an old building in the new DC water building? It looks like it isn’t part of the historic pumping station, and they haven’t taken much care to keep it from being damaged while building around it. Any ideas?


JD says: (10/23/17 6:36 PM)
It's a pumping station too, and still operational. I think they'll be able to look down into it from the new building.


GG says: (10/23/17 6:39 PM)
Ah. Interesting. I thought only the nice looking one next door was being kept. Makes sense to surround it then.


knavyard says: (10/24/17 9:11 AM)
According to their website, Cava is supposed to open this weekend!


CMG says: (10/24/17 12:07 PM)
What about the chipotle?


G Street says: (10/24/17 4:31 PM)
Great update = as always


Snacks says: (10/25/17 10:20 AM)
Re: Whole Foods - I took a tour of the Park Chelsea around June and was told the plan (at that time) was for the ownership group of those buildings to hand over the space to Whole Foods around January 18 for them to begin building out the space. Based on the current timelines and now being owned by Amazon, who knows if that's going to stick.

I don't think they can hand the building over until the Agora is more complete as they need access to all the space (roads, sidewalks, building exteriors) and trying to have 2 different work crews on site would be very awkward. Not to mention the distinct possibility Amazon may finish building it quicker and it'd be done before the Agora.

Seriously, do they have more than 6 people working on the Agora??



RMP says: (10/25/17 11:05 AM)
I don't know what the deal is with WCS but at least they're consistent about being super slow and behind schedule. Before Park Chelsea opened, I called the phone number on their website and the voicemail said "we look forward to welcoming our first residents in July!". This was in January, mind you. They were 6 months behind and hadn't even bothered to update their voicemail. Nobody ever called me back either.


jdc says: (10/25/17 3:03 PM)
Excavation and foundation work at Parc phase II going full steam ahead. They also pushed out the fencing to block sidewalks on south and west side - only north side sidewalk is still available.


202_cyclist says: (11/2/17 11:34 AM)
It looks like there has been significant construction activity for the hotel being built next to the Yards park.


JD says: (11/2/17 11:35 AM)
To be more accurate, the residential building is right next to the park--the hotel will be up at Tingey Street.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

202_cyclist on Peet's Grand Opening: Folks-- it looks like there may have been an assault recently on along South Cap...
NavyYardNittany on Peet's Grand Opening: I suppose if the comparison you’re using for this Harris Teeter is other DC groc...
snakegriffin on Peet's Grand Opening: @Ampersand: You are 100% correct, it is still the best grocery store with proxim...
Ampersand on Peet's Grand Opening: Besides the sometimes insanely long lines, I’ve never really understood the Navy...
202_cyclist on Peet's Grand Opening: @Dude— I suppose being disappointed in August will save us from the annual Octob...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
800 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 08/15/18
1500 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/14/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/13/18
UNIT B/O N ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/13/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/11/18
900 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/09/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/05/18
UNIT B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/03/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/01/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/25/18
1400 B/O SOUTH CAPITOL ST   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/22/18
1000 B/O 1ST ST SE   ROBBERY  07/22/18
400 B/O M ST SE   THEFT
Shoplifting
 07/21/18
1000 B/O 5TH ST SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 07/21/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/19/18
200 B/O I ST SE   ROBBERY  07/17/18

Recent Issued Building Permits Archive  
1300 4TH ST SE   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801082 / SHOP DRAWING
Install 1 new elevators - 4000LBS@3500FPM Contract 639114, Elevator 1
   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801083 / SHOP DRAWING
Install 1 new elevator 3500LBS@350FPM 12 Floors
4 I ST SE   
08/02/18 
CRESCENT COMMUNITIES / DANIEL P. THOMPSON
P1808039 / SUPPLEMENTAL
2 I ST SE   
08/02/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801184 / CONSTRUCTION
WR #3573836 - VAETH / BRUNO-WARD 6-20003-PEPCO CREWS WITH BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLE - CREW WILL BE WORKING AT NIGHT DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9 PM TO 7 AM - WILL ALSO BE WORKING WEEKENDS (SAT & SUN) FROM 6AM TIL 6PM - WORK WILL START AUGUST 4TH, 2016 THROUGH AUGUST 31. 2018
300 M ST SE   
07/31/18 
FEDERAL CENTER LP / SAM HOLLEN
B1810089 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. NO STRUCTURAL. 2646 SQUARE FEET. SPEC SUITE 875
400 M ST SE   
07/25/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY (LAND) / DONNA G GRAHAM
AH1801155 / CONSTRUCTION
WR #3476633 / VAETH / BRUNO / WARD 6 / 20003 / PEPCO CREWS WORKING THE 300-400 BLK OF M ST SE SPLICING CABLE - WORKING SATURDAY 7 / 28 / 18 AND SUNDAY 7 / 29 / 18 FROM 6AM TIL 6PM
   
07/30/18 
CAPPER SENIOR II LIMITED PARTNERSHIP (IMPS) / DEBORAH MCCROSSIN
SOL1800691 / CONSTRUCTION
Installation of a 142.56 Kw roof mounted solar array.
861 NEW JERSEY AVE SE   
07/25/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1801151 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1111 NEW JERSEY AVE SE   
07/31/18 
null / NA NA NA
EHOP18941202 / HOME OCCUPATION
201 TINGEY ST SE   
08/02/18 
JBG/SEFC 170 LLC / BARBARA ANN STEDMAN
AH1801189 / CONSTRUCTION
WR#3570726 - CABLE SPLICING - MANHOLE ACCESS - ANTHONY PRICE
227 TINGEY ST SE   
07/27/18 
FOREST CITY WASHINGTON / null
P1807872 / SUPPLEMENTAL
   
07/27/18 
UNITED STATES OF AMERICA / null
P1807874 / SUPPLEMENTAL
300 TINGEY ST SE   
08/02/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1808020 / SUPPLEMENTAL
(1) Chiller (1) Water dispense
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.