Since January, 2003
            
 (a random before-and-after moment)
August 7, 2005
August 5, 2017
South Capitol at O, Looking Northeast (see more)

Time for my quarterly {ahem} update on all of the construction projects you are picking your way past when you walk/drive/bike around the Hood:
I'll start with the new openings and the coming soons, with both Due South Dockside and Morini Piccolo now operating (softly) on the Yards Park boardwalk, and Cava in the Homewood Suites at Half and M in Any Second Now territory:
As for buildings getting their faces on, I present Skanska's 99 M office building and the new DC Water headquarters:
There's also now two new arrivals above ground, as PN Hoffman's condo project The Bower has at last made its debut at 4th and Tingey, as has the DC Housing Authority's as-yet unnamed mixed-income rental building at 2nd and L, both of which are shot from the south instead of the intersection because it's now the time of year when anything shot to the south-southeast, south or south-southwest will look terrible, no matter what time of day:
Next on the assembly line, two more residential projects projects are likely to be making their above-ground debuts before the end of the year: JBG's West Half project directly north of Nats Park, and the McDonalds-slaying 2 I Street project:
Other holes in the ground I won't highlight this time around include the Bower's sibling rental project at 4th and Water, Toll Brother's Parc Riverside Phase II at Half and L, the Jair Lynch residential project at the Half Street Hole, and the combo project at South Capitol and M for the new National Association of Broadcasters headquarters and its next-door residential project labeled 10 Van.
Also, WC Smith has cleared the lot at 2nd and I to make way for the beginning of work on the Garrett, the third and final apartment building that makes up "The Collective" on that block. Plus, fences are up along 3rd Street for the next project in the Yards lineup, the 270-unit apartment building currently known as "Parcel L2." (Great, I have to update my Highlighted Projects map again.)
Just to make sure all ends of the construction spectrum are represented, one hole is even starting to get covered over, and that's in the 200 and 300 blocks of Virginia Avenue, where the Virginia Avenue Tunnel work is far enough along that you can actually start to imagine a street appearing again in those blocks in the coming months:
Finally, I'll close with a shot of a tearing down rather than a building up, and that's the pile of debris formerly known as 37 L Street SE--just in time to mark the 40th anniversary of the Cinema Follies fire, on Oct. 24, 1977.
So, while the neighborhood is taking a back seat these days to all of the excitement surrounding the opening of the Wharf down the road, there is still a fair amount happening. (And hopefully the neighborhood blogger will someday get back in the groove. Still riding the rollercoaster of my new not-yet-ready-to-call-it-normal.)
Comments (20)
   
 
 More About Development News

JDLand.com Home

Comments

Marc says: (10/23/17 5:28 PM)
Thanks for the updates and photos! Excited about Cava. Have you heard anything about Whole Foods? Has ANYONE? Is it delayed until the Garrett is done or something? Until Amazon re-configures their grocery store vision? I'm sure these get asked a lot, but maybe I missed something. Thanks again!
Marc


JD says: (10/23/17 5:32 PM)
I promise everyone, no matter how bad at this I have become, that the second I have Whole Foods need, I will post it. As of now, there is nothing official.


Marc says: (10/23/17 5:36 PM)
Thank you for the quick reply! I really appreciate your blog.


202_cyclist says: (10/23/17 6:00 PM)
Thank you for the updates-- appreciated. Is lower Barrack's Row outside the boundary of JD Land?


202_cyclist says: (10/23/17 6:01 PM)
Also, I think we need to add 1221 Van to the list of projects that seem like they are taking forevr.


202_cyclist says: (10/23/17 6:01 PM)
*forever.


RMP says: (10/23/17 6:28 PM)
Thanks for the great new pics! It's quite unfortunate timing that the two boardwalk places opened at the very end of patio season. I imagine they are going to be absolutely hopping on Friday nights next summer.

I was just wondering what's going on with 1221 Van. I'm curious which floorplans are going to have the ballpark views and what they're going to ask for them.


JD says: (10/23/17 6:31 PM)
I meant to mention that 1221 Van is at it's due date for starting leasing, but no word that I've heard.

Lower 8th is part of my purview, but in addition to everything else I have a suspected labral tear in my hip and so the notion of walking over there too was untenable. Just pack me up for the home.



JD says: (10/23/17 6:32 PM)
(So, yes, 801 Virginia should have been included in my rundown.)


GG says: (10/23/17 6:32 PM)
Apologize if this has already been pointed out but what is up with them keeping part of an old building in the new DC water building? It looks like it isn’t part of the historic pumping station, and they haven’t taken much care to keep it from being damaged while building around it. Any ideas?


JD says: (10/23/17 6:36 PM)
It's a pumping station too, and still operational. I think they'll be able to look down into it from the new building.


GG says: (10/23/17 6:39 PM)
Ah. Interesting. I thought only the nice looking one next door was being kept. Makes sense to surround it then.


knavyard says: (10/24/17 9:11 AM)
According to their website, Cava is supposed to open this weekend!


CMG says: (10/24/17 12:07 PM)
What about the chipotle?


G Street says: (10/24/17 4:31 PM)
Great update = as always


Snacks says: (10/25/17 10:20 AM)
Re: Whole Foods - I took a tour of the Park Chelsea around June and was told the plan (at that time) was for the ownership group of those buildings to hand over the space to Whole Foods around January 18 for them to begin building out the space. Based on the current timelines and now being owned by Amazon, who knows if that's going to stick.

I don't think they can hand the building over until the Agora is more complete as they need access to all the space (roads, sidewalks, building exteriors) and trying to have 2 different work crews on site would be very awkward. Not to mention the distinct possibility Amazon may finish building it quicker and it'd be done before the Agora.

Seriously, do they have more than 6 people working on the Agora??



RMP says: (10/25/17 11:05 AM)
I don't know what the deal is with WCS but at least they're consistent about being super slow and behind schedule. Before Park Chelsea opened, I called the phone number on their website and the voicemail said "we look forward to welcoming our first residents in July!". This was in January, mind you. They were 6 months behind and hadn't even bothered to update their voicemail. Nobody ever called me back either.


jdc says: (10/25/17 3:03 PM)
Excavation and foundation work at Parc phase II going full steam ahead. They also pushed out the fencing to block sidewalks on south and west side - only north side sidewalk is still available.


202_cyclist says: (11/2/17 11:34 AM)
It looks like there has been significant construction activity for the hotel being built next to the Yards park.


JD says: (11/2/17 11:35 AM)
To be more accurate, the residential building is right next to the park--the hotel will be up at Tingey Street.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts
  

jdc on Weekly Open Thread: So after Barre3, that seems to leave just 1 bay in that building empty. Based on...
snakegriffin on Weekly Open Thread: I must have missed it - does anyone know what's going in at F1rst between Solidc...
JD on Weekly Open Thread: @202, you asked in the last thread about a new date for the Happy Hour, and I ha...
202_cyclist on Weekly Open Thread: It's no Whole Foods opening but the Navy Yard has some new residents. https://w...
VictorBravo1111 on Weekly Open Thread: Peet's Coffee at 1111 New Jersey Ave wants to have sidewalk seating. "An applica...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/21/18
300 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/19/18
400 B/O M ST SE   THEFT
Shoplifting
 05/16/18
100 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/16/18
400 B/O M ST SE   THEFT
Shoplifting
 05/15/18
900 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/12/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/11/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/10/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/10/18
1200 B/O VAN ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/10/18
100 B/O M ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/09/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/09/18
UNIT B/O M ST SE   BURGLARY
Burglary Two
 05/09/18
1000 B/O HALF ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/08/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/08/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/08/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/06/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/06/18
400 B/O M ST SE   THEFT
Shoplifting
 05/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/30/18
900 B/O 5TH ST SE   HOMICIDE
Murder II
 04/30/18
100 B/O L ST SE   ROBBERY  04/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/27/18
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 04/26/18
1200 B/O SOUTH CAPITOL ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/26/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/25/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/24/18
1200 B/O 1ST ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/24/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/23/18

Recent Issued Building Permits Archive  
1331 2ND ST SE 20003   
05/01/18 
DC WATER / DAVE LEVINE
AH1800901 / CONSTRUCTION
AFTER HOURS WORK FOR STRUCTURE EXCAVATION AND SUPPORT FOR B1311474 DC WATER. CORMAN CONSTRUCTION 301-34-5417.
907 4TH ST SE   
05/01/18 
RYAN WILLING / null
E1806431 / SUPPLEMENTAL
   
04/30/18 
RYAN M WILLING / KYLE YOST
SOL1800442 / CONSTRUCTION
4.2kw rooftop solar pv system, less than 4' above roof
101 H ST SE   
05/14/18 
SQUARE 737 LLC / DFM DEVELOPMENT SERVICES, LLC
B1808785 / CONSTRUCTION
Revision to Permit TL1800054 to revise the Whole Foods Market permit address from 800 New Jersey SE to 101 H Street SE.
100 H ST SE   
05/14/18 
DISTRICT OF COLUMBIA / null
E1806787 / SUPPLEMENTAL
2 I ST SE   
05/08/18 
CRESENT CAPITOL VIEW MF LLC / COMPOSITION SYSTEMS INC
AH1800928 / CONSTRUCTION
AFTER HOURS PERMIT TO WORK SUNDAY 5 / 13 / 18 FROM 7 AM UNTIL 7 PM UNDER OCCUPANCY PERMIT PA10636830 TO INSTALL A SIGN BAND.
10 I ST SE   
05/02/18 
CAPITOL HILL RACQUET CLUB / JOHN WYCKOFF
SB1800290 / CONSTRUCTION
Install 4 soil borings to less than 50 feet using dual tube geoprobe DPT tooling. Collect soil samples and install 1-inch diameter sch 40 PVC temp monitoring wells in 2 of 4 borings. Wells and borings will be abandoned with 24 hours of sampling using a bentonite grout mixture with bentonite / water ratio of 2 to 1. All IDW will be contained in drums.
150 I ST SE   
05/17/18 
SQUARE 737 LLC / JAMES WOLF
P1806078 / SUPPLEMENTAL
421 L ST SE   
05/16/18 
DORAN BUTUCHE / DORAN BUTUCHE
F1800255 / CONSTRUCTION
To install a fence and gate to the front yard. The construction, placement, style and color will be similar to fencing already in place at adjoining homes. Entire fence is in public space.
202 M ST SE   
05/18/18 
NURI EROL / PAT SNYDER
B1804587 / CONSTRUCTION
EXISTING PIZZA RESTAURANT - NEW OWNER, NEW EQUIPMENT + NEW GELATO & COFFEE SERVICE. MINOR HVAC, PLUMBING & ELECTRIC
800 NEW JERSEY AVE SE 1ST FL   
05/14/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1806780 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
05/09/18 
WHOLE FOODS MARKET / MELISSA DIAZ
TL1800054 / CONSTRUCTION
THE PROJECT IS A TENANT FIT-OUT OF AN EXISTING SPACE IN A MIXED USE PROJECT BEING DEVELOPED UNDER A SEPARATE PERMIT. THE PROJECT IS A WHOLE FOODS MARKET OCCUPYING THE GROUND FLOOR AND A MEZZANINE WITHIN THE BUILDING. - TPR
   
05/11/18 
SQUARE 737 LLC / null
P1805955 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
05/11/18 
CONSOLIDATED RAIL CORPORATION / RPS INC
SB1800309 / CONSTRUCTION
Per " Work Plan, Geotechnical Investigation, dated May 2, 2018 (see attached), the work involves drilling 6 soil borings using a hollow stem auger rig and a mud rotary drill rig for the purpose of collecting soil samples for geotechnical subsurface exploration. Boring depths range from 75 to 150 ft.
1100 NEW JERSEY AVE SE 2ND FL   
05/10/18 
SQUARE 742 LLC / null
P1805902 / SUPPLEMENTAL
71 POTOMAC AVE SE   
05/11/18 
MRP REALTY / ELIZABETH DE SMET
SB1800270 / CONSTRUCTION
Installation of 124 wellpoints to assist in the construction of mixed use structure at Potomac Avenue.
   
05/18/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800039 / CONSTRUCTION
Removal of an Underground Storage Tank (UST) 7 feet in diameter and approximately 9 feet long (approximately 2000 gallons). Suspected Fuel Tank. Tank is filled with 8 inches of unknown content. Tank will be removed and disposed off as per the appropriate standards and requirements.
227 TINGEY ST SE   
04/25/18 
JW CAPITAL PARTNERS / MELISSA DIAZ
B1801074 / CONSTRUCTION
Parcel L1- New construction of 11-story full service hotel with restaurant and retail per Zoning Order 17-07. Includes 225 hotel rooms and 4 elevators. SWM and GAR combined with adjacent Parcel L2 to be permitted separately. TPR
221 TINGEY ST SE   
04/30/18 
GONE YARD HOTEL OWNER, LLC / DFM DEVELOPMENT SERVICES, LLC
B1808252 / CONSTRUCTION
Yards Parcel L-1 : Permit Revision for B1801074 to update owner information to Gone Yard Hotel Owner, LLC and permit address to new address: 221 Tingey Street SE.
300 TINGEY ST SE   
05/09/18 
FC BOILERMAKER LLC / FAY A KENNEDY
E1806640 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.