Page Through from Before to After
 In what could be considered the first hint of the proverbial light at the end of the Virginia Avenue Tunnel project, CSX has announced that starting sometime in the next few weeks--perhaps as early as October 2, though one might wonder if playoff baseball might impact the timeline--it will be closing the southbound lane of 3rd Street at Virginia Avenue for approximately four to five months, just as it did for a shorter period of time back back in March of 2016. This closure is to allow for the demolition of the temporary deck over the still-under-construction north tunnel, which will then allow the roof of that tunnel to be built. Then work can begin on "installation of the new, final roadway features" on Virginia Avenue itself, first in the blocks just east of 2nd Street and then working eastward (which will mean more deck removals and temporary traffic flow changes/closures in coming months). Traffic coming south down 3rd Street north of the freeway will still be able to make the right onto the freeway entrance ramp. As with the previous closures, pedestrian access along 3rd Street will be maintained, as will access to the driveway to the Capitol Quarter houses on the front lines. Fourth Street will be the main southbound route from north of the freeway down into the neighborhood.
JDLand.com Home
dude says: (9/22/17 10:21 PM)
Cool. I may have said this before, but all these temporary closures really haven't been too bad. At least for me. Thoughts from others?
JD says: (9/23/17 8:23 AM)
As someone who spends a lot of time going south and north under the freeway (albeit on foot most of the time), it really has not been that bad. That's a different experience from living with it every day, of course. The biggest issue I have every time I cross Virginia is the guilt that I didn't document it better. But life intervened, and guilt is my middle name anyway. :)
Andrew in DC says: (9/25/17 5:08 AM)
JD - any news on the Whole Foods front? Seems awfully quiet over there.
JD says: (9/25/17 7:17 AM)
Nope, no news. Though I do wonder if all of the tunnel construction is impacting the timeline--not exactly a lovely landscape to open into right now. But I have no info one way or the other.
walt says: (9/25/17 9:11 AM)
I cross under at 4th everyday and no, it hasn't been bad. Even VA Ave itself with the two-way traffic hasn't been bad, and I thought that would have been a real problem. I don't live right on the front line though. If I did, I think I'd have a different opinion.
jg says: (9/26/17 9:16 AM)
October 4 is the current date for closure, according to an electronic sign at 4th & K. I hope the detour signage is better than the last time they used this traffic pattern. I saw cars going south on 3rd a number of times, usually after making a left from Virginia Ave onto 3rd.
jdc says: (9/27/17 12:10 PM)
I have a nearly front row seat for the 37 L demolition, and I thought I'd report that so far today, it seems that two dumpsters worth of stuff has been removed. Also, I can just make out the NAB HQ future site, and it seems like a lot of dirt removal is going on these days.
RMP says: (9/28/17 9:26 AM)
Bower is finally above ground. Anyone know what's up with the couches and chairs in Yards Park? Deliberately placed there or somebody just dumping furniture when moving out of their apartment?
202_cyclist says: (9/28/17 10:03 AM)
@RMP-- is there any good stuff? I might have to do some dumpster diving.
RMP says: (9/28/17 1:25 PM)
@202_cyclist Judge for yourself. Dogs have definitely been marking these up though.
202_cyclist says: (9/29/17 10:53 AM)
The Washington Post has an article about the future of the Bullpen. link
jdc says: (9/29/17 11:57 AM)
Doors for Cava opened again today - looks like more progress towards finalized finishes. Opening before end of October?
Alex B. says: (9/29/17 1:31 PM)
Hmmm. Re: the future of the Bullpen article. " “The good news is we’ve been working really, really hard for the past year negotiating a lease for a permanent Bullpen that is very close to where we are now,” said Blair, who hoped to be able to share additional details about a permanent space for The Bullpen in the coming weeks. Architectural plans for the venue include two floors with an outdoor roof deck and garage-door windows that open to preserve as much of the outdoor vibe of the original Bullpen as possible." I can think of one particular project that would a) make sense for only a 2-story building, b) could have a roof deck, and c) would be close by...
GoNavy says: (9/29/17 3:15 PM)
@Alex Your URL didn't work. What are you hinting at?
Alex B. says: (9/29/17 9:06 PM)
D'oh. Ok, enough beating around the bush. The only property that meets those criteria is the small parcel at the corner of first and N, the one wrapped around by the Hampton Inn. No inside information here, just reading between the lines.
sameter says: (10/1/17 8:14 AM)
@alex b that would be a great spot, but much foot print, unless they built up significantly!
202_cyclist says: (10/3/17 10:55 AM)
The 49 L Street SE parcel is now on the GSA auctions website for bidding. The opening bid is $5M. We should have a Go Fund Me account or a JD Land happy hour to raise funds to purchase this property. link
GoNavy says: (10/3/17 2:07 PM)
I thought I saw some news a while back but have been out of the loop. Anything going on with 7-11 yet on south capitol. Was it sold?
jdc says: (10/3/17 2:11 PM)
Bunch of folks touring 49 L Street St. just now.
Ampersand says: (10/3/17 2:38 PM)
Speaking of changing traffic flow! My office just sent around a document about a supposed trucker protest on Thursday October 5. Sounds like it'll be pretty heavily in our neighborhood: From October 3rd through 8th a group of truckers is planning to protest governmental regulations on the number of hours a truck driver can drive and the institution of electronic monitoring devices, called ELDs. Sources and social media show that the protest activity is scheduled to be on the National Mall around the Ellipse area and the Department of Transportation Building located near the Navy Yard (1200 New Jersey Avenue, SEWashington, DC 20590). The truck drivers have staged trucks in the Virginia and Hagerstown area. While there are plans to bring people in via personal cars, on October 5th there is a call to bring the trucks through the city beginning at 7 am. The potential driving route is I-495 to I-395, to I-695. From I-695 to South Capitol Street, SW, to M Street, SE, to New Jersey Avenue, SE, to 1st Street, SE, to Potomac Avenue, SE, to South Capitol Street, SW, to Washington Avenue, SW, to Independence Avenue, SW, to 17th and Constitution Avenue, NW, to 14th Street, NW, to I-395, and back to Hagerstown, Maryland. There have been permits issues for 100-200 people. So, I tried to follow that route on Google Maps and realized they left out a left turn from New Jersey on either L St, K St, or Eye St. And a subsequent left turn onto 1st. I hope they aren't planning to try going from NW-bound New Jersey to Eye to 1st, because that intersection is enough of a disaster already...
dbt says: (10/3/17 7:00 PM)
The truckers were out in force in JDLand this afternoon, circling DOT while blasting their horns. We'll see what the rest of this week brings.
Mark says: (10/3/17 10:47 PM)
Ampersand, on the route I think they left out N St, meaning they'll turn right on New Jersey rather than left. That takes them past DOT. Then right on N St, left on 1st, and around to South Capitol on Potomac. I question the effectiveness of trying to get the public and DOT on their side by loudly blocking traffic.
Hastings says: (10/3/17 10:57 PM)
No progress on the Whole Foods, but at the Agora building site they have put in street landscaping and trees along S Capitol Street and today paved the space in front of the WF entrance and installed stone/granite decorative blocks.
NavyYardNittany says: (10/5/17 12:03 AM)
Parc Riverside Phase II construction resumes tomorrow, per an e-mail today. Get your final morning swim in early at Lake Zika while you still can.
jdc says: (10/5/17 2:03 PM)
I like how JD's post above links to a tweet, and a reply to that tweet is a link back to this post. Very meta.
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
1100 B/O NEW JERSEY AVE SE
|
| BURGLARY
Burglary Two
| 11/26/20
|
UNIT B/O M ST SE
|
| ROBBERY
| 11/25/20
|
1000 B/O NEW JERSEY AVE SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/24/20
|
UNIT B/O I ST SE
|
| ROBBERY
Carjacking
| 11/23/20
|
200 B/O M ST SE
|
| ASSAULT WITH A DANGEROUS WEAPON
| 11/22/20
|
UNIT B/O I ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/22/20
|
700 B/O L ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/22/20
|
1000 B/O 3RD ST SE
|
| ROBBERY
| 11/21/20
|
1200 B/O 1ST ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/19/20
|
UNIT B/O M ST SE
|
| THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
| 11/18/20
|
1000 B/O HALF ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/12/20
|
1100 B/O 2ND PLACE SE
|
| MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
| 11/12/20
|
1000 B/O 8TH ST SE
|
| THEFT
Theft First Degree (theft From Building)
| 11/12/20
|
1000 B/O HALF ST SE
|
| THEFT FROM AUTO
Theft (theft Of Motor Vehicle Parts Or Accessories)
| 11/10/20
|
400 B/O M ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/05/20
|
300 B/O L ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/05/20
|
900 B/O 4TH ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/01/20
|
UNIT B/O I ST SE
|
| THEFT
Theft First Degree (shoplifting)
| 10/31/20
|
900 B/O HALF ST SE
|
| MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
| 10/29/20
|
300 B/O TINGEY ST SE
|
| ROBBERY
Carjacking
| 10/29/20
|
1300 B/O 4TH ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 10/28/20
|
|
Recent Issued Building Permits
| Archive
|
|
1200 1ST ST SE
|
|
11/04/20
PEPCO / DONNA G GRAHAM
AH2100169 /
CONSTRUCTION
WO #16029084 / 02 - 1200 1ST ST SE - PEPCO / WA CHESTER TO REMOVE AND INSTALL CABLES MONDAY THROUGH SATURDAYS FROM 9PM TO 6AM STARTING 11 / 5 / 20 TO 12 / 5 / 20
|
1018 3RD ST SE
|
|
11/10/20
DAVID A LEINER / null
E2101357 /
SUPPLEMENTAL
|
1300 4TH ST SE 1001
|
|
11/03/20
YAAN REAL ESTATE LP / null
P2100950 /
SUPPLEMENTAL
|
1300 4TH ST SE RU-1
|
|
11/19/20
AP BOWER RETAIL LLC / null
E2101650 /
SUPPLEMENTAL
|
1057 5TH ST SE
|
|
11/05/20
PAM HARDER / null
E2101183 /
SUPPLEMENTAL
|
82 I ST SE
|
|
11/12/20
STARRY / null
E2101432 /
SUPPLEMENTAL
|
330 K ST SE
|
|
11/09/20
MINDY J SHAW / CASEY CHARKHABI; NA
B2008664 /
CONSTRUCTION
Adding a bathroom on the first floor
|
|
|
11/10/20
JINGSONG XIA / null
P2101107 /
SUPPLEMENTAL
|
100 M ST SE
|
|
11/12/20
LHREV WASHINGTON M ST LLC / null
P2101170 /
SUPPLEMENTAL
|
|
|
11/12/20
SQUARE 743 INC / ;
P2101121 /
SUPPLEMENTAL
|
139 N ST SE
|
|
11/10/20
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW; BROOKFIELD DEVELOPMENT
B2004436 /
CONSTRUCTION
NEW CONSTRUCTION 10-STORY PLUS PENTHOUSE APARTMENT BUILDING WITH 379 UNITS. PROPOSED GROSS FLOOR AREA: 225,000 SF.
SH2000028 issued
|
1275 NEW JERSEY AVE SE
|
|
11/04/20
USA / null
E2101168 /
SUPPLEMENTAL
|
|
|
11/09/20
BROOKFIELD PROPERTIES / TIM GOOD
BP2100588 /
POST CARD
|
71 POTOMAC AVE SE APT 1208
|
|
11/02/20
null / NA NA NA
EHOP20957167 /
HOME OCCUPATION
|
71 POTOMAC AVE SE
|
|
11/04/20
RIVERFRONT HOLDINGS II, LLC / null
M2100380 /
SUPPLEMENTAL
|
|
|
11/04/20
RIVERFRONT HOLDINGS II, LLC / null
P2100978 /
SUPPLEMENTAL
|
|
|
11/09/20
MRP REALTY / null
E2101319 /
SUPPLEMENTAL
|
227 TINGEY ST SE
|
|
11/18/20
FC 227 LLC / null
E2101630 /
SUPPLEMENTAL
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|