Since January, 2003
            
 (a random before-and-after moment)
February 10, 2007
March 29, 2015
Cushing at M, Looking North-Northeast (see more)

I don't get truly surprised too often anymore after 13-plus years in this gig, but when I clicked the link for this Washington Post article, "DC Unveils Plans for New Frederick Douglass Bridge," I most certainly did not expect to see a completely new design of the bridge that has been on the boards to be replaced for well over a decade.
Gone is the arched bascule design that was chosen many moons ago, replaced with a showier look using three sets of parallel arches. (I will await more detailed renderings before assuming that the bridge has the same multi-use paths on each side of the bridge as the previous design did, though the Post article says there is at least one.)
The plans for building the new bridge immediately south of and parallel to the old bridge have not changed, and there will still be large traffic ovals on both ends.
A $441 million design-build contract has been awarded to a joint venture of Archer Western Construction and Granite Construction Company, and AECOM is the lead designer. This phase also includes the reconstruction of the interchange of Interstate 295 and the Suitland Parkway.
The Post article says that the new bridge is "projected to open in 2021."
Here's a few more graphics purloined from the Post piece--hopefully DDOT will post their video of the design soon and I'll add the link.
It'll take me a little while to update my South Capitol Street Bridge project page, but in the meanwhile it's a nice trip down memory lane and includes more information (current as of the last time the city announced information about the project) about the ovals and whatnot.
And my South Capitol Street project page explains how this bridge and the interchange project are the first of a multiphase plan to rework much of South Capitol from the Southeast Freeway to the Suitland Park.
UPDATE: There is a new URL for an official web site for the project, newfrederickdouglassbridge.com. You can see the rendering video by scrolling down a touch or clicking on "Gallery." There's a lot of additional drawings, including these two from above, which show the traffic ovals and also do show multi-use paths on both sides of the bridge. See also the siteplan to get your bearings about the new bridge and ovals and 295 interchange.
Also, the project web site says that construction is expected to begin in "winter 2017."
Comments (30)
   
 
 More About Douglass Bridge

JDLand.com Home

Comments

NavyYardGuy says: (8/10/17 12:15 PM)
Wow, that is so beautiful (the bridge).


JES says: (8/10/17 12:26 PM)
holy crap, that's gonna be cool.


Brett M says: (8/10/17 12:30 PM)
Wow, not only is it a better looking bridge, but costs less than the $900M Vince Gray told us it would cost


Chris says: (8/10/17 12:35 PM)
I like it!


JD says: (8/10/17 12:46 PM)
Just to be fair, $900 M was probably for the entire South Capitol Street reconstruction project, not just the bridge. Though originally the bridge was priced at more than $600 million, back when it was still going to need to have a swing span.


JD says: (8/10/17 12:51 PM)
Be sure to watch the video on the project web site.


ttassa says: (8/10/17 12:52 PM)
Wow, this is very impressive.


202_cyclist says: (8/10/17 2:12 PM)
Frederick Douglass is doing great work. He is being recognized more and more these days.



202_cyclist says: (8/10/17 2:13 PM)
Looks good but where will the zip-line going across the Anacostia be placed?


JD says: (8/10/17 2:15 PM)
Over on that other bridge, you know, the one that always seems to be a year away from getting started.


202_cyclist says: (8/10/17 2:21 PM)
This looks great but I give it about two days before the U.S. Commission of Fine Arts tries its best to make this bridge dull.

Also, it reminds me of the 6th Street viaduct replacement in LA.
link


CJBabyDaddy says: (8/10/17 2:24 PM)
Purty.


202_cyclist says: (8/10/17 2:35 PM)
It almost makes up for some of the pain of losing the Barry.


jdc says: (8/10/17 4:29 PM)
Dock 79 residents are sure going to have a much improved view. What, what a beauty at night!


202_cyclist says: (8/10/17 4:40 PM)
Also, the new DC Water & Sewer Authority headquarters will compliment this new modern bridge design.


CJBabyDaddy says: (8/10/17 10:07 PM)
202_cyclist: I hope D.C. isn't jumping the gun on naming the bridge after this Mr. Douglass guy. Wouldn't it be better to wait a few decades until he retires and we can put his accomplishments into perspective?


conngs0 says: (8/11/17 8:54 AM)
Totally agree that the renderings of the bridge are pretty solid. Hopefully the finished product looks like that! I also like that the design seems to limit the amount of dead space around the ends of the bridge to the greatest extent possible.


202_cyclist says: (8/12/17 9:27 AM)
Why so much noise? STFU and go back to sleep!


JD says: (8/12/17 1:11 PM)
In other news, Ann's appears to be open today.



dude says: (8/13/17 10:24 PM)
@202 hah.

When I saw the bridge design in my email the other day I was pleasantly surprised. The whole profject looks good and seems to make sense. Very cool.


202_cyclist says: (8/14/17 10:35 AM)
One question about the design of the bridge-- presumably the vertical arches won't pose a hazard to the many low-flying helicopters in the area, especially with the heliport in Buzzard Point on the other side of So. Capitol Street (will this be relocated with the coming development of that part of Ward 6?). Has DDOT studied this?


ZNY2 says: (8/15/17 3:58 PM)
Noticed this weekend that Il Parco looked closed for good. Eat DC seems to confirm this

link


JD says: (8/15/17 4:02 PM)
Wow, swore we discussed it here in the comments, but guess it was just on Twitter.


walt says: (8/15/17 4:14 PM)
I always think about what the bridge will look like in a drought. Some bridges lose all of their aesthetic value when the river dries up. We probably don't have to worry about that though.
It looks beautiful as shown.


202_cyclist says: (8/15/17 4:15 PM)
Unfortunate news regarding Il Parco.

Does anyone know anything about 920 - 922 M Street, SE? There was a banner for AllAfrica.com on the front of the building but it appears to be vacant. The building looks like it might have previously been a motel. This is the first time I've seen this rendering: link

If I had some money to invest, I would buy property along the lower 8th Street corridor.


RMP says: (8/16/17 9:18 AM)
Paper is down at Juice Laundry and there's a sign on the door.



202_cyclist says: (8/16/17 10:18 AM)
Does anyone know the status of construction at the Zika pit known as the second phase of Parc Riverside. I haven't seen any apparent activity there in about two weeks.

I agree with what others posted about Il Parco. The pizza was actually quite good but the service was lacking.


202_cyclist says: (8/17/17 11:10 AM)
TOWER CRANE UPDATE!!!

A tower crane is being installed today at the West Half Street site.


JD says: (8/17/17 11:23 AM)
See, @202, I told you to be on the lookout!


202_cyclist says: (8/17/17 11:38 AM)
I have to say, these are exciting times we're living in!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

JD on Catching Up With: Via Meredith Fascett, the long-awaited Navy Yard transportation study is finally...
Westnorth on Catching Up With: WBJ reporting that Chemonics, a contractor for USAID etc., is going to anchor th...
dcgent on Catching Up With: Rising Stars Chef Michael Rafidi and Sommelier Brent Kroll Will Open a Restauran...
dcgent on Catching Up With: Some more restaurants coming https://www.washingtonian.com/2018/11/19/two-of-dcs...
ColoradoCane on Catching Up With: Justin's Cafe closed seemingly due to money troubles. The business filed for ba...
jdc on Catching Up With: Isn't parking also metered north of M Street, too? It seems to be on Half, L, et...
  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/13/18
150 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/12/18
400 B/O M ST SE   THEFT FROM AUTO
Theft Of Motor Vehicle Parts Or Accessories
 11/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle) - Convenience Store
 11/11/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 11/09/18
700 B/O M ST SE   THEFT
Theft First Degree (all Other Larceny)
 11/09/18
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/08/18
400 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 11/07/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/07/18
800 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/30/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 10/29/18
50 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/18
100 B/O O ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 10/28/18
1400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  10/26/18
100 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 10/23/18
900 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 10/23/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 10/22/18

Recent Issued Building Permits Archive  
1013 4TH ST SE   
11/05/18 
EVA WALTER / KYLE YOST
SOL1900066 / CONSTRUCTION
5.89kw rooftop solar pv system, less than 4' above roof
   
11/07/18 
EVA WALTER / null
E1901297 / SUPPLEMENTAL
1346 4TH ST SE   
11/01/18 
ALAN OWINGS / ROBERT HENRY
AH1900133 / CONSTRUCTION
After Hours Permit for 11 / 12 / 2018, to perform construction work with the below activities: Interior Operations: 7AM-7PM Exterior Operations: 9AM-7PM
1000 5TH ST SE   
10/31/18 
UNITED STATES OF AMERICA / JOY WILDER
B1901427 / CONSTRUCTION
Non Construction permit to change load for current Child Development Center with 26 children 3 to 6 years old +3 Staff to Child Development Center with 30 Children + 3 Staff.
   
11/16/18 
UNITED STATES OF AMERICA / BRANDON M WILSON
BP1900670 / POST CARD
2 I ST SE   
11/05/18 
CRESCENT CAPITAL VIEW / CASSANDRA MOSLEY
AH1900160 / CONSTRUCTION
Installation of wet utility services to the new building at 4 I Street SE including fire service, domestic service, and storm sewer.
   
11/14/18 
MCDONALDS CORPORATION / JUSTIN BISHOP
SP1800022 / CONSTRUCTION
Construct a 614 sqft in-ground, concrete swimming pool. All MEP, decking, and fencing work to be done under separate permit.
10 I ST SE   
10/24/18 
CAPITOL HILL RACQUET CLUB / BOB BIROONAK; N/A
SG1900026 / CONSTRUCTION
Relocating existing freestanding sign
   
11/14/18 
CAPITOL HILL RACQUET CLUB / BOB BIROONAK; N/A
SG1900075 / CONSTRUCTION
revision to existing approved sign permit SG1900026 Change to the footer only
110 I ST SE   
11/06/18 
null
E1901238 / SUPPLEMENTAL
200 I ST SE 20009   
10/25/18 
DISTRICT OF COLUMBIA / null
M1900267 / SUPPLEMENTAL
200 I ST SE   
11/05/18 
GOVERNMENT OF THE DISTRICT OF COLUMBIA / null
E1901223 / SUPPLEMENTAL
   
10/25/18 
DISTRICT OF COLUMBIA / CLIFFORD DIXON
B1809410 / CONSTRUCTION
DGS OCTO BUILDING...NEW GENERATOR ON THE ROOF WITH ASSOCIATED MECHANICAL
   
11/07/18 
DISTRICT OF COLUMBIA / DANIEL MCGUIRE
P1901098 / SUPPLEMENTAL
300 M ST SE 8TH FL   
10/24/18 
FEDERAL CENTER LP / ALFRED JORDAN 2024375067
E1900838 / SUPPLEMENTAL
130 M ST SE   
11/09/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / RICHARD PLUMLEY
P1901176 / SUPPLEMENTAL
250 M ST SE   
11/07/18 
WCSMITH - BRIAN STROTT / GEORGE ARTHUR KING
SB1900025 / CONSTRUCTION
Drill and construct two 2 inch diameter observation wells 42 feet below existing grade utilizing mud rotary drilling methods. All drill spoils will be contained, tested and disposed of per DOEE regulation.
400 M ST SE   
11/02/18 
CAPPER SENIOR 11 LIMITED PARTNERSHIP / null
E1901156 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
10/31/18 
CONSOLIDATED RAIL CORPORATION / BRANDON KNAPP
AH1900131 / CONSTRUCTION
Work in the public ROW with the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, concrete structure, paving, and site restoration construction activities.
   
11/07/18 
CONSOLIDATED RAIL CORPORATION / RPS INC
SB1900023 / CONSTRUCTION
Per Work Plan, Geotechnical Investigation, dated October 18, 2018 (see attached), the work involves drilling 12 soil borings using a HSA rig for the purpose of collecting soil samples for geotechnical subsurface exploration. Boring depths range from 80 to 150 ft. Borings will be properly backfilled after completion.
1100 NEW JERSEY AVE SE   
11/16/18 
SQUARE 742 LLC / IAN AND LEON COMMUN-ET LLC
B1901037 / CONSTRUCTION
EXISTING CONDITIONS TO BE DEMOLISHED AND NEW OFFICE SPACE BUILT TO TENANTS STANDARDS. OFFICE CONSISTS OF OPEN OFFICE AND PRIVATE OFFICES WITH SUPPORT AREAS. SUPPORT AREAS INCLUDE BREAK ROOM / PRODUCTION ROOM COMBINATION, SERVER ROOM WITH DEDICATED A / C, MOTHERS / WELLNESS ROOM AND CONFERENCING.
1111 NEW JERSEY AVE SE   
10/25/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
E1900860 / SUPPLEMENTAL
   
11/05/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / MICHAEL B. BELL
E1901199 / SUPPLEMENTAL
125 O ST SE   
11/14/18 
DISTRICT OF COLUMBIA / CARL LAVENDT 2408821268
E1901525 / SUPPLEMENTAL
300 TINGEY ST SE STE# 140   
11/13/18 
FC BOILERMAKER LLC / ANTHONY DIRENZO
E1901464 / SUPPLEMENTAL
227 TINGEY ST SE   
11/01/18 
JOHN MORIARTY & ASSOCIATES / DFM DEVELOPMENT SERVICES, LLC
AH1900141 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete fa├žade panels. Work to take place 7PM to 7AM, 11 / 5 through 12 / 5.
300 TINGEY ST SE   
11/05/18 
FC BOILERMAKER LLC / DREW PEISHEL; JOHN RANOUS
B1813340 / CONSTRUCTION
Minor interior tenant improvment including building one non-load bearing partitiion wall adding millwork fixtures including cash desk, fitting rooms. No Structural work. Some electrical updates. **LEVEL 2 ALTERATION
   
11/08/18 
FC BOILERMAKER LLC / STEPHEN ADAMS 2403042373
E1901337 / SUPPLEMENTAL
   
11/16/18 
FC BOILERMAKER LLC / ANTHONY L HARRISON
E1901597 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.