Since January, 2003
            
 Page Through from Before to After

I don't get truly surprised too often anymore after 13-plus years in this gig, but when I clicked the link for this Washington Post article, "DC Unveils Plans for New Frederick Douglass Bridge," I most certainly did not expect to see a completely new design of the bridge that has been on the boards to be replaced for well over a decade.
Gone is the arched bascule design that was chosen many moons ago, replaced with a showier look using three sets of parallel arches. (I will await more detailed renderings before assuming that the bridge has the same multi-use paths on each side of the bridge as the previous design did, though the Post article says there is at least one.)
The plans for building the new bridge immediately south of and parallel to the old bridge have not changed, and there will still be large traffic ovals on both ends.
A $441 million design-build contract has been awarded to a joint venture of Archer Western Construction and Granite Construction Company, and AECOM is the lead designer. This phase also includes the reconstruction of the interchange of Interstate 295 and the Suitland Parkway.
The Post article says that the new bridge is "projected to open in 2021."
Here's a few more graphics purloined from the Post piece--hopefully DDOT will post their video of the design soon and I'll add the link.
It'll take me a little while to update my South Capitol Street Bridge project page, but in the meanwhile it's a nice trip down memory lane and includes more information (current as of the last time the city announced information about the project) about the ovals and whatnot.
And my South Capitol Street project page explains how this bridge and the interchange project are the first of a multiphase plan to rework much of South Capitol from the Southeast Freeway to the Suitland Park.
UPDATE: There is a new URL for an official web site for the project, newfrederickdouglassbridge.com. You can see the rendering video by scrolling down a touch or clicking on "Gallery." There's a lot of additional drawings, including these two from above, which show the traffic ovals and also do show multi-use paths on both sides of the bridge. See also the siteplan to get your bearings about the new bridge and ovals and 295 interchange.
Also, the project web site says that construction is expected to begin in "winter 2017."
Comments (30)
   
 
 More About Douglass Bridge

JDLand.com Home

Comments

NavyYardGuy says: (8/10/17 12:15 PM)
Wow, that is so beautiful (the bridge).


JES says: (8/10/17 12:26 PM)
holy crap, that's gonna be cool.


Brett M says: (8/10/17 12:30 PM)
Wow, not only is it a better looking bridge, but costs less than the $900M Vince Gray told us it would cost


Chris says: (8/10/17 12:35 PM)
I like it!


JD says: (8/10/17 12:46 PM)
Just to be fair, $900 M was probably for the entire South Capitol Street reconstruction project, not just the bridge. Though originally the bridge was priced at more than $600 million, back when it was still going to need to have a swing span.


JD says: (8/10/17 12:51 PM)
Be sure to watch the video on the project web site.


ttassa says: (8/10/17 12:52 PM)
Wow, this is very impressive.


202_cyclist says: (8/10/17 2:12 PM)
Frederick Douglass is doing great work. He is being recognized more and more these days.



202_cyclist says: (8/10/17 2:13 PM)
Looks good but where will the zip-line going across the Anacostia be placed?


JD says: (8/10/17 2:15 PM)
Over on that other bridge, you know, the one that always seems to be a year away from getting started.


202_cyclist says: (8/10/17 2:21 PM)
This looks great but I give it about two days before the U.S. Commission of Fine Arts tries its best to make this bridge dull.

Also, it reminds me of the 6th Street viaduct replacement in LA.
link


CJBabyDaddy says: (8/10/17 2:24 PM)
Purty.


202_cyclist says: (8/10/17 2:35 PM)
It almost makes up for some of the pain of losing the Barry.


jdc says: (8/10/17 4:29 PM)
Dock 79 residents are sure going to have a much improved view. What, what a beauty at night!


202_cyclist says: (8/10/17 4:40 PM)
Also, the new DC Water & Sewer Authority headquarters will compliment this new modern bridge design.


CJBabyDaddy says: (8/10/17 10:07 PM)
202_cyclist: I hope D.C. isn't jumping the gun on naming the bridge after this Mr. Douglass guy. Wouldn't it be better to wait a few decades until he retires and we can put his accomplishments into perspective?


conngs0 says: (8/11/17 8:54 AM)
Totally agree that the renderings of the bridge are pretty solid. Hopefully the finished product looks like that! I also like that the design seems to limit the amount of dead space around the ends of the bridge to the greatest extent possible.


202_cyclist says: (8/12/17 9:27 AM)
Why so much noise? STFU and go back to sleep!


JD says: (8/12/17 1:11 PM)
In other news, Ann's appears to be open today.



dude says: (8/13/17 10:24 PM)
@202 hah.

When I saw the bridge design in my email the other day I was pleasantly surprised. The whole profject looks good and seems to make sense. Very cool.


202_cyclist says: (8/14/17 10:35 AM)
One question about the design of the bridge-- presumably the vertical arches won't pose a hazard to the many low-flying helicopters in the area, especially with the heliport in Buzzard Point on the other side of So. Capitol Street (will this be relocated with the coming development of that part of Ward 6?). Has DDOT studied this?


ZNY2 says: (8/15/17 3:58 PM)
Noticed this weekend that Il Parco looked closed for good. Eat DC seems to confirm this

link


JD says: (8/15/17 4:02 PM)
Wow, swore we discussed it here in the comments, but guess it was just on Twitter.


walt says: (8/15/17 4:14 PM)
I always think about what the bridge will look like in a drought. Some bridges lose all of their aesthetic value when the river dries up. We probably don't have to worry about that though.
It looks beautiful as shown.


202_cyclist says: (8/15/17 4:15 PM)
Unfortunate news regarding Il Parco.

Does anyone know anything about 920 - 922 M Street, SE? There was a banner for AllAfrica.com on the front of the building but it appears to be vacant. The building looks like it might have previously been a motel. This is the first time I've seen this rendering: link

If I had some money to invest, I would buy property along the lower 8th Street corridor.


RMP says: (8/16/17 9:18 AM)
Paper is down at Juice Laundry and there's a sign on the door.



202_cyclist says: (8/16/17 10:18 AM)
Does anyone know the status of construction at the Zika pit known as the second phase of Parc Riverside. I haven't seen any apparent activity there in about two weeks.

I agree with what others posted about Il Parco. The pizza was actually quite good but the service was lacking.


202_cyclist says: (8/17/17 11:10 AM)
TOWER CRANE UPDATE!!!

A tower crane is being installed today at the West Half Street site.


JD says: (8/17/17 11:23 AM)
See, @202, I told you to be on the lookout!


202_cyclist says: (8/17/17 11:38 AM)
I have to say, these are exciting times we're living in!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

dcgent on Albi Opening This: UrbanTurf looks at what's coming housing wise for the area https://dc.urbanturf....
Shogungts on Albi Opening This: @Jason - not sure if that is the plan, but it would be nice. I went by there th...
Jason on Albi Opening This: Any news on Half Street between M and N? I've heard that it's being turned into ...
202_cyclist on Retail Roundup: When parking is further reduced, people can take metro to one of the two station...
walt on Retail Roundup: I also want to comment that I greatly prefer when a new street is named 1 1/2 st...
walt on Retail Roundup: Any guesses as to what will happen when parking is further reduced in the neighb...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O 11TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/19/20
900 B/O M ST SE   BURGLARY
Burglary Two
 02/19/20
1200 B/O HALF ST SE   ROBBERY  02/18/20
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/20
400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  02/08/20
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/02/20
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/01/20
600 B/O VIRGINIA AVE SE   ASSAULT WITH A DANGEROUS WEAPON  01/29/20
1300 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/27/20
1100 B/O 8TH ST SE   BURGLARY
Burglary Two
 01/25/20
303 VIRGINIA AVE SE   ROBBERY  01/25/20
400 B/O M ST SE   THEFT
Shoplifting
 01/23/20

Recent Issued Building Permits Archive  
909 4TH ST SE   
02/12/20 
MEREDITH FASCETT / null
E2004655 / SUPPLEMENTAL
1300 4TH ST SE APT 214   
02/03/20 
null / NA NA NA
EHOP20983190 / HOME OCCUPATION
1021 5TH ST SE   
02/13/20 
KEVIN WILLIAMS / KEVIN WILLIAMS; KEVIN WILLIAMS
B2005053 / CONSTRUCTION
Apply for building permit to have final closing inspection for permit #B1602481 & B1602513 per inspector inspection report since these permits has expired.
82 I ST SE   
01/27/20 
GDV EYE STREET LLC / null
P2003302 / SUPPLEMENTAL
   
01/27/20 
GDV EYE STREET LLC / null
M2001261 / SUPPLEMENTAL
100 I ST SE APT T-13   
01/25/20 
null / NA NA NA
EHOP20960826 / HOME OCCUPATION
150 I ST SE   
02/14/20 
SQUARE 737 LLC / JASON D DORRIS
AH2000818 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail, and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
250 M ST SE   
02/14/20 
SQUARE 769 LLC / null
P2003901 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
01/30/20 
NEW JERSEY AT H LLC / MICHELLE GABBITAS
AH2000649 / CONSTRUCTION
Manhole rehabilitation on New Jersey, 2nd St and M St SE to repair 3 existing sewer manholes in DDOT ROW. Work will all be done through existing manholes (trenchless) and include lining, rebuilding and bypass of existing manholes.
861 NEW JERSEY AVE SE   
01/28/20 
DISTRICT OF COLUMBIA / JANE MCCRAY
AH2000647 / CONSTRUCTION
Pepco contractor, W.A.Chester, will be splicing cable on 02 / 01 / 2020 - 02 / 28 / 2020, from 9 PM - 7 AM.
1275 NEW JERSEY AVE SE 20003   
02/14/20 
BROOKFIELD PROPOERTIES / TIM GOOD
AH2000849 / CONSTRUCTION
After hours to conduct work on 1275 New Jersey Ave SE on the upcoming holiday, Presidents Day, February 17, 2020. Operations would include below grade concrete and waterproofing activities with access limited to N Street. This permit would not include extended work hours beyond the normal 7am to 7pm period.
1275 NEW JERSEY AVE SE   
01/29/20 
US GOVERNMENT / null
E2004153 / SUPPLEMENTAL
   
01/29/20 
MILLER AND LONG / WILLIAM MOORE
AH2000659 / CONSTRUCTION
Afterhours to pour concrete with pump truck from 11pm to 7am from 2 / 6 / 2020 to 3 / 6 / 2020
   
01/30/20 
UNITED STATES OF AMERICA / VINCENT J. BROWNING; VINCENT J. BROWNING
P2003449 / SUPPLEMENTAL
1-Oil / Sand interceptor
   
01/30/20 
US GOVERNMENT / null
E2004202 / SUPPLEMENTAL
   
02/07/20 
MILLER AND LONG / WILLIAM MOORE
AH2000699 / CONSTRUCTION
Afterhours to put up towercrane with mobile crane saturday 2 / 8 / 2020 and 2 / 9 / 2020 from 5am to 1159pm
1299 NEW JERSEY AVE SE   
02/18/20 
FOREST CITY SEFC LLC / STRAUCHON; SEE BELOW
BCIV1800153 / CONSTRUCTION
Phase 1A BCIV Permit Description - BCIV 1800153 - The subject BCIV permit is for the Phase IA development of Quander St SE, N Pl SE, and 1-1 / 2 St SE within the overall Forest City, Yards West (FCYW) development area which emphasizes: pedestrian-focused public realm, optimized utility corridor, fully integrated SWM design, and complete street and vision zero design. The FCYW Phase IA is comprised...
1322 PATTERSON AVE SE   
02/13/20 
JOINT BASE ANACOSTIA BOLLING - UNITED STATES NAVAL OBSERVATORY SI / TONYA HARRIS; TONYA HARRIS; TBD
BCIV2000046 / CONSTRUCTION
***FEDERAL PROPERTY*** PROJECT WILL CONSIST OF DREDGING THE EXISTING RETENTION POND AND INSPECTING AND CLEANING THE OUTLET CONTROL STRUCTURE (S1) LOCATED ON THE UNITED STATES NAVAL OBSERVATORY TO REMOVE SEDIMENT ACCUMULATION. CONTRACTOR SHALL AVOID THE CLEARING OF VEGETATION ON POND EMBANKMENTS AND SURROUNDING AREAS SO AS TO KEEP RESTORATION AND REPLANTING TO A MINIMUM.
71 POTOMAC AVE SE   
02/13/20 
MRP REALTY / JAMES VANEGAS
AH2000681 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
   
02/19/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BISHOP; JUSTIN BISHOP
SP1900054 / CONSTRUCTION
Construct a 680 sqft concrete swimming pool inside an existing waterproofed structural box on the 14th floor. All MEP, decking and fencing work by other trades under separate permits.
227 TINGEY ST SE   
02/12/20 
GONE YARD HOTEL OWNER LLC / BOB BIROONAK; BOB BIROONAK
SG2000048 / CONSTRUCTION
one double face illuminated blade sign
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.