Sliding from Before to After
The siren song of a stunningly clear and breezy Saturday in August was of course irresistible to me, and I walked more than nine miles over four hours to grab a whole lot of pictures from a whole lot of locations. Here's some highlights. Click to enlarge, as always. It turns out having a public roof space at a central location in the neighborhood is going to be veeeeery handy for me, as it allowed me to grab a great shot of the DC Water Headquarters construction that shows exactly how the new steel is wrapping around the existing O Street Pumping Station. It also allowed me to check on the progress of the excavations at 1250 Half, West Half, and the One M/10 Van combo project in a single shot. Then there's the Any Minute Now retail offerings, with the Juice Laundry telling Instagram followers that they really are coming soon (really!), and representatives of the new Taylor Gourmet on 1st Street telling nearby office tenants that they expect to open on Aug. 23. We shall see! Meanwhile, exterior work seems to be starting to wrap up at the 1221 Van residential building just north of the ballpark (and note all that retail space on the first two floors), while the 99 M office building is celebrating its topping out later this month. And while the neighborhood waits with baited breath to see exactly when the Whole Foods build-out will begin at Agora, there are now nice new sidewalks on the stretch of H Street SE that is in the process of materializing. Finally, there are holes in the ground that now show evidence of the start of vertical construction, so these might be my final downward peeks into the two residential projects at the Yards Parcel O on 4th Street, the large residential project at 2 I Street, and the mixed-income Capper Hope VI apartment building at 3rd and L. And, finally, while I have no intention of adding the new DC United soccer stadium to my lineup, I was surprised to see how visible it is from just within the JDLand boundaries at South Capitol and Potomac. So, here. But this is just a very small sample. If you want to see a whole lot more of the shots I took, here's 333 of them. Or follow any of the above links, or click on the projects on the map at the upper right of any JDLand page to see the latest for those projects under construction.
JDLand.com Home
JD says: (8/8/17 2:35 PM)
Also, there are now approved excavation permits for both the Garrett (2nd and I) and the Yards Parcel L lot. And a sign permit for Chipotle. And newly approved foundation permits for 10 Van and West Half. Given the very tidy state of the West Half hole, and that there is already an approved crane permit, I would suggest that @202 keep a very close eye on that site.
BillP says: (8/9/17 8:22 AM)
So nice to see you taking pictures and blogging again!
conngs0 says: (8/9/17 8:47 AM)
Thanks, as always, for the pictures and updates, JD! Also, that's quite an impressive trek you took to get them. 9-plus miles! I'll bet that half-time meal at Shake Shack tasted pretty darn good!
adamdonovan says: (8/9/17 9:04 AM)
May be a silly question, but where is the public roof access?
JD says: (8/9/17 9:09 AM)
The Top of the Yard bar at the Hampton Inn. ("Public" maybe was a mite generous, but still better than needing to organize a visit in advance at other roofs. I like being stealthy. :) )
And @conngs0, yes, that burger and fries hit the spot. Will have to go back for a shake.
202_cyclist says: (8/9/17 10:38 AM)
Thank you for the updates. A bit random, but it is slightly creepy that the Capitol Police picked today, of all days, to test the emergency broadcast system.
202_cyclist says: (8/9/17 2:05 PM)
The photo of the DC United/Audi Field stadium construction is interesting (it seems like everyone went over there this weekend to take photos of it). Buzzard Point is a bit like how the Capitol Riverfront/Navy Yard was 10 - 12 years ago. It will be interesting to see that area develop.
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
1100 B/O NEW JERSEY AVE SE
|
| BURGLARY
Burglary Two
| 11/26/20
|
UNIT B/O M ST SE
|
| ROBBERY
| 11/25/20
|
1000 B/O NEW JERSEY AVE SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/24/20
|
UNIT B/O I ST SE
|
| ROBBERY
Carjacking
| 11/23/20
|
200 B/O M ST SE
|
| ASSAULT WITH A DANGEROUS WEAPON
| 11/22/20
|
UNIT B/O I ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/22/20
|
700 B/O L ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/22/20
|
1000 B/O 3RD ST SE
|
| ROBBERY
| 11/21/20
|
1200 B/O 1ST ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/19/20
|
UNIT B/O M ST SE
|
| THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
| 11/18/20
|
1000 B/O HALF ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/12/20
|
1100 B/O 2ND PLACE SE
|
| MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
| 11/12/20
|
1000 B/O 8TH ST SE
|
| THEFT
Theft First Degree (theft From Building)
| 11/12/20
|
1000 B/O HALF ST SE
|
| THEFT FROM AUTO
Theft (theft Of Motor Vehicle Parts Or Accessories)
| 11/10/20
|
400 B/O M ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 11/05/20
|
300 B/O L ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/05/20
|
900 B/O 4TH ST SE
|
| THEFT FROM AUTO
Theft (theft From Motor Vehicle)
| 11/01/20
|
UNIT B/O I ST SE
|
| THEFT
Theft First Degree (shoplifting)
| 10/31/20
|
900 B/O HALF ST SE
|
| MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
| 10/29/20
|
300 B/O TINGEY ST SE
|
| ROBBERY
Carjacking
| 10/29/20
|
1300 B/O 4TH ST SE
|
| THEFT
Theft 2nd Degree (all Other Larceny)
| 10/28/20
|
|
Recent Issued Building Permits
| Archive
|
|
1200 1ST ST SE
|
|
11/04/20
PEPCO / DONNA G GRAHAM
AH2100169 /
CONSTRUCTION
WO #16029084 / 02 - 1200 1ST ST SE - PEPCO / WA CHESTER TO REMOVE AND INSTALL CABLES MONDAY THROUGH SATURDAYS FROM 9PM TO 6AM STARTING 11 / 5 / 20 TO 12 / 5 / 20
|
1018 3RD ST SE
|
|
11/10/20
DAVID A LEINER / null
E2101357 /
SUPPLEMENTAL
|
1300 4TH ST SE 1001
|
|
11/03/20
YAAN REAL ESTATE LP / null
P2100950 /
SUPPLEMENTAL
|
1300 4TH ST SE RU-1
|
|
11/19/20
AP BOWER RETAIL LLC / null
E2101650 /
SUPPLEMENTAL
|
1057 5TH ST SE
|
|
11/05/20
PAM HARDER / null
E2101183 /
SUPPLEMENTAL
|
82 I ST SE
|
|
11/12/20
STARRY / null
E2101432 /
SUPPLEMENTAL
|
330 K ST SE
|
|
11/09/20
MINDY J SHAW / CASEY CHARKHABI; NA
B2008664 /
CONSTRUCTION
Adding a bathroom on the first floor
|
|
|
11/10/20
JINGSONG XIA / null
P2101107 /
SUPPLEMENTAL
|
100 M ST SE
|
|
11/12/20
LHREV WASHINGTON M ST LLC / null
P2101170 /
SUPPLEMENTAL
|
|
|
11/12/20
SQUARE 743 INC / ;
P2101121 /
SUPPLEMENTAL
|
139 N ST SE
|
|
11/10/20
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW; BROOKFIELD DEVELOPMENT
B2004436 /
CONSTRUCTION
NEW CONSTRUCTION 10-STORY PLUS PENTHOUSE APARTMENT BUILDING WITH 379 UNITS. PROPOSED GROSS FLOOR AREA: 225,000 SF.
SH2000028 issued
|
1275 NEW JERSEY AVE SE
|
|
11/04/20
USA / null
E2101168 /
SUPPLEMENTAL
|
|
|
11/09/20
BROOKFIELD PROPERTIES / TIM GOOD
BP2100588 /
POST CARD
|
71 POTOMAC AVE SE APT 1208
|
|
11/02/20
null / NA NA NA
EHOP20957167 /
HOME OCCUPATION
|
71 POTOMAC AVE SE
|
|
11/04/20
RIVERFRONT HOLDINGS II, LLC / null
M2100380 /
SUPPLEMENTAL
|
|
|
11/04/20
RIVERFRONT HOLDINGS II, LLC / null
P2100978 /
SUPPLEMENTAL
|
|
|
11/09/20
MRP REALTY / null
E2101319 /
SUPPLEMENTAL
|
227 TINGEY ST SE
|
|
11/18/20
FC 227 LLC / null
E2101630 /
SUPPLEMENTAL
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|