Since January, 2003
            
 Sliding from Before to After

Using Opening Day as a lure, JBG provided a hard-hat visit to the roof of its under-construction 290-unit apartment building 1221 Van, which is directly across N Street from the Nationals Park and is expected to begin move-ins this fall. The panorama above, while showy, is a wide-angle shot, giving a sense of the full vista from the roof, but at the expense of making everything look farther away.
This image at right is a more accurate representation of the size of the field as your eyes see it. A good chunk of far left field is obscured by the parking garage, but right field is mostly visible.
While you can't see the outfield scoreboard's display, those with good vision can see the scoreboard above the Nats dugout, and perhaps people with good hearing (i.e., not me) could hear the public address system. I did hear the organ a few times.
As for the other views from the roof, you didn't expect me to just take ballpark views, did you? The full gallery of photos is here, but here are a few previews.
Also, I couldn't resist one photo of the workers taking a break to catch some of the action. And a JDLand friend couldn't resist a photo of 1221 Van from inside the ballpark, unaware that the shot also captured a rare glimpse of the official JDLand photographer in action. (The yellow blob. Trust me.)
Check out the full gallery for more shots of the surroundings, and for what the view from the "infinity pool" will look like. And see my 1221 Van project page for renderings, before-and-after photos, and more information. The official web site is 1221van.com.
Comments (9)
   
 
 More About 1221 Van
 All posts: 1221 Van, Development News

JDLand.com Home

Comments

MJM says: (4/4/17 12:09 PM)
Perhaps that picture will become as famous as this one

Could def see them up there watching the game



jdc says: (4/4/17 2:38 PM)
Great update, JD! That area, Half and First, is really becoming the focus of density with tightly packed buildings, all of which are at the max height (IIRC).


Jaybird says: (4/4/17 3:01 PM)
I imagine when all the baseball cameras are here for the ASG 2018, a few will provide this view.


JD says: (4/4/17 3:03 PM)
Actually, by then they may be able to be on top of the two skeletons that should be topped out right at Half and N. (1250 Half and JBG's West Half)


Jaybird says: (4/4/17 3:10 PM)
Thanks JD.

By the way, when all the buildings are built, will the upper deck fans still be able to see the Capitol, or perhaps just certain sections?


JD says: (4/4/17 3:13 PM)
I am guessing those dome views will be gone.


Jaybird says: (4/4/17 3:31 PM)
I guess some folks will like it that way :-)


dude says: (4/5/17 7:43 AM)
Cool!

I'll be there for our first game of the season tonight. With a slightly better view.


ttassa says: (4/6/17 3:53 PM)
I went to the game on Wednesday night; this building is certainly prominent and definitely changes the "skyline" views from inside the ballpark. I'm actually optimistic that some of these views, even though they obscure the Capitol dome, may actually add to the sight lines from some of the seats around the stadium.

The West Half building and Jair Lynch building -- though I'm not sure about the architecture of the latter -- should really complete the profile of the stadium, looking beyond left and center fields. Now what to do with those garages...

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

JD on Slider: They were rumored a while back, and I'm guessing that District Dogs and Boombox ...
JES on Slider: Yeah, maybe the interior designers settled on a Great Gatsby theme? That might b...
JD on Slider: Although, wait, I had always heard Union Kitchen and Compass were coming to 1221...
JD on Slider: I've only had to bite my tongue on the first two of those for about a year now. ...
JES on Slider: Union Kitchen Grocery, Compass Coffee and Cold Stone Creamery to West Half: http...
JD on Slider: And, by the way, thanks for the kind words on the Sliders. They are really becom...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O VAN ST SE   BURGLARY
Burglary Two
 03/25/19
800 B/O 3RD ST SE   ASSAULT WITH A DANGEROUS WEAPON  03/25/19
1200 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/23/19
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/19/19
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (theft From Building)
 03/18/19
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/11/19
200 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 03/08/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/07/19
400 B/O M ST SE   THEFT
Theft First Degree (theft From Building)
 03/06/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/05/19
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/28/19
400 B/O M ST SE   THEFT
Shoplifting
 02/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/25/19
1100 HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 02/24/19

Recent Issued Building Permits Archive  
1017 3RD PL SE   
03/14/19 
JAUVON M GILLIAM / null
PP1902068 / POST CARD
1331 4TH ST SE CU   
03/13/19 
FC 1331 LLC / null
E1905237 / SUPPLEMENTAL
   
03/18/19 
FC 1331 LLC / BEN BEDDO
TL1900017 / CONSTRUCTION
REVISION to existing permit TL1700205 submitted to reduce scope of work to the permitted set to reduce costs.
1346 4TH ST SE   
03/04/19 
FC 1346 LLC / BOB BIROONAK; N/A
SG1900084 / CONSTRUCTION
One illuminated building sign and one double face illuminated blade sign
2 EYE ST SE   
03/12/19 
null / MIKE BOONE
AH1900650 / CONSTRUCTION
PEPCO-ALLEN-CREWS NEED TO REPLACE CABLE AT #2-EYE ST SE. 11PM-5AM 3 / 14 / 19-3 / 15 / 19
4 I ST SE   
03/19/19 
null
E1905494 / SUPPLEMENTAL
150 I ST SE   
03/15/19 
SQUARE 737 LLC / WILLIAM MOORE
AH1900647 / CONSTRUCTION
afterhours to take down tower crane with mobile crrane saturday 3 / 16 / 2019 and sunday 3 / 17 / 2019 from 4am tp 1159 pm
   
03/21/19 
WILLIAM C SMITH / null
E1905564 / SUPPLEMENTAL
   
03/21/19 
WILLIAM C SMITH / null
E1905563 / SUPPLEMENTAL
328 I ST SE   
03/06/19 
BRIAN HUSEMAN / JAMES W MONTGOMERY
E1905028 / SUPPLEMENTAL
212 M ST SE   
03/04/19 
SQUARE 769 LLC / BRIAN WARNER
UT1900015 / CONSTRUCTION
Remove an unknown number of USTs as they are encountered during construction activities.
300 M ST SE   
03/08/19 
FEDERAL CENTER LP / SAM HOLLEN
B1906302 / CONSTRUCTION
INSTALL NEW FIRST FLOOR SUITE ENTRY DOOR WITH CARD READER TO VACANT TENANT SPACE. INSTALL INTERIOR CONCRETE RAMP WITH 4 INCH ELEVATION CHANGE. PROVIDE EXIT LIGHT AND EXTERIOR LIGHT FIXTURE. 100 SQUARE FEET.
861 NEW JERSEY AVE SE   
03/11/19 
CONSOLIDATED RAIL CORPORATION / JOHN WYCKOFF
SB1900174 / CONSTRUCTION
An environmental assessment will be conducted at the parcel located 861 NJ Ave., SE involving installing 10 soil borings, 7 soil borings will be drilled to a depth of approimately 20 feet bgs and hree soil borings will be drilled to a depth of approximately 50 feet bgs. The soil borings will be drilled and the soil sampled using direct push technology (DPT) dual tube tooling 3.75. All cuttings ...
1200 NEW JERSEY AVE SE 20590   
03/22/19 
DC WATER / MICHELLE GABBITAS
AH1900676 / CONSTRUCTION
Cured in Place Pipe Lining of existing sanitary sewers using existing manholes. The sewer runs from 2nd St SE and I (Eye) St SE under 2nd St SE to M St SE. It then goes under the US Department of Transportation to Tingey St SE. Work requires more than 24 hours of continuous operation to complete, necessitating an After Hours Permit. Work will be performed on weekends to minimize disruption to ...
1299 NEW JERSEY AVE SE   
03/01/19 
UNITED STATES OF AMERICA / MAHMOUD KHACHAN
SB1900167 / CONSTRUCTION
Temporary Geotechnical Soil Borings Number of Borings: 2 Diameter of Boreholes: 6 inches Depth of Borings: 55 ft Drilling Method: Mud Rotary Abandonment Method: Tremie Grouting with Bentonite grout
79 POTOMAC AVE SE   
03/11/19 
RIVERFRONT HOLDINGS I LLC / null
E1905174 / SUPPLEMENTAL
227 TINGEY ST SE L1   
02/28/19 
UNITED STATES OF AMERICA / JOHN MCDONALD
P1904187 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.