Sliding from Before to After
 It was announced on Thursday that fall 2017 is expected to see the opening at Arris of Chloe, a multi-genre restaurant from Chef Haidar Karoum, late of Estadio, Doi Moi, and Proof. The press release says that "Chloe will be a showcase of Karoum's personal culinary journey, including his Lebanese roots and extensive travel around Western Europe and Southeast Asia, all grounded in and linked by the seasonal bounties of the mid-Atlantic." It will have 103 seats inside, with counter seating for 14 at an open kitchen and another 27 spots in the bar, plus 32 outdoor seats for warm months (like February?). Washingtonian has much more about the venture, including a couple of renderings of the interior, one of which seems to hint that the restaurant will be located in the corner space at 4th and Tingey, but I am trying to confirm the exact location for sure.
JDLand.com Home
conngs0 says: (2/23/17 11:04 PM)
Sweet! Thanks for sharing the news! Can't say that I've ever had Lebanese food before but I can't wait to try it out!
RMP says: (2/24/17 7:59 AM)
I'm guessing this is going into the old Steadfast Supply space? 32 outdoor seats seems about what would fit on Tingey. I can't imagine that many outdoor seats fitting on the Water St side.
JD says: (2/24/17 9:22 AM)
I have confirmed what I guessed in the post above, that it will be in the corner space at 4th and Tingey.
SWag says: (2/24/17 11:20 AM)
this building has a ton of retail bays. that's 5 and I feel like there are 2 more on water st...
NavyYahd says: (2/24/17 11:34 AM)
Any idea what may be coming to the retail for One Hill South? They seem to have a lot of space.
JES says: (2/24/17 1:09 PM)
Insignia also has a ton of retail space that hasn't been announced yet. Only thing confirmed there is Bethesda Bagels, and they're in what looks like a tiny retail bay. I wonder what'll snag that prime corner spot right next to the metro entrance...
JD says: (2/24/17 1:21 PM)
I have heard of one non-food tenant coming to One Hill South, though not sure I can spill the beans.
And a year ago I had heard a rumor of an Italian restaurant for Insignia, but not sure if that's happening.
SWag says: (2/24/17 2:07 PM)
a grocer to One Hill South? I remember reading that awhile back - or perhaps I'm making that up
NavyYahd says: (2/24/17 2:56 PM)
I had heard a certain cycling studio that may be owned by a subsidiary of Related Companies
202_cyclist says: (2/24/17 8:30 PM)
There's a construction trailer now at the lot across from Il Parco.
malatesta says: (2/25/17 9:57 AM)
Update in re the bad smell at the nj & I intersection: a DC water truck has several manholes open in front of park Chelsea and is doing something or other with some kind of roto-rooter looking thing. This update brought to you by someone who doesn't understand sewer infrastructure.
202_cyclist says: (2/25/17 1:32 PM)
It's just outside of the JD Land boundaries but, unfortunately, there was another shooting this afternoon at the liquor store on So. Capitol St. link
jdc says: (2/25/17 8:29 PM)
Maybe it's just me, but for how big the stadium is it seems to be dwarfed by 1221 Van. I assume it's no higher than any other buildings in the area, but from Half street Metro entrance it seems to tower over everything.
jdc says: (2/25/17 8:31 PM)
As a 1015 Half street office resident, I am especially interested in whatever comes to One Tree Hill South.
202_cyclist says: (2/25/17 9:28 PM)
@jdc-- yes, looking south from So. Capitol Street, 1221 Van appears to be huge. Perhaps it is because there is nothing in the immediate area now.
kingoftherumor says: (3/6/17 4:47 PM)
I have heard some rumors that Dean and Deluca will be coming to Insignia on M. I googled what is the square footage of Dean and Deluca and I found out that it ranges from 3000 to over 20K square feet.
I also heard a fancy Mcdonald is coming to One Hill South on I street (something that looks like the Mcdonald at Galleria Vittoria Emanuele in Milan).
Brich says: (3/18/17 5:18 AM)
I live at Dock79, it's actually relatively quiet down in these parts, minus the helicopters every now and then. Bardo is on the other side of a parking lot and volleyball courts, there is no noise that carries up to the units thus far. In addition, I read that live bands are supposedly prohibited at the location.
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
No records added or modified in the past two weeks. |
|
Recent Issued Building Permits
| Archive
|
|
1300 4TH ST SE 1001
|
|
02/22/21
AP BOWER RETAIL LLC / null
E2104231 /
SUPPLEMENTAL
|
1346 4TH ST SE APT 1M
|
|
02/06/21
null / NA NA NA
EHOP21945129 /
HOME OCCUPATION
|
1331 4TH ST SE R-2
|
|
02/08/21
FC 1331 LLC / FC 1331 LLC
BP2101814 /
POST CARD
|
10 I ST SE
|
|
02/16/21
CAPITOL HILL RACQUET CLUB / NA; VICTORIA STEINHOFF
SB2100112 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
555 L ST SE
|
|
01/29/21
UNITED STATES OF AMERICA / RENNE WELL; RICK HARLAN SCHNEIDER
B2102004 /
CONSTRUCTION
DGS PROJECT REHABILITATION+RESTORATION OF THE HISTORIC LINCOIN FIELDHOUSE
|
861 NEW JERSEY AVE SE 20003
|
|
02/23/21
809-853 NEW JERSEY AVE ACQUISITION LLC / SUSANA VAZQUEZ
AH2100728 /
CONSTRUCTION
Dismantling of tower crane.
|
809 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC 809-853 NEW JERSEY AVENUE ACQUISITION LLC / null
E2103926 /
SUPPLEMENTAL
|
853 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC / null
E2103924 /
SUPPLEMENTAL
|
861 NEW JERSEY AVE SE
|
|
02/05/21
GS CSX HOTEL OWNER LLC / null
E2103762 /
SUPPLEMENTAL
|
1275 NEW JERSEY AVE SE
|
|
02/02/21
FC 1275 NJ LLC / null
E2103662 /
SUPPLEMENTAL
|
|
|
02/11/21
FC 1275 NJ LLC / null
P2103445 /
SUPPLEMENTAL
|
848 SOUTH CAPITOL ST SE
|
|
02/16/21
CXS TRANSPORTATION INC / VICTORIA STEINHOFF; TBD
SB2100111 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|