My focus is elsewhere these days, but I haven't completely stopped keeping an eye on things. Just not any real big news to report. So here's some little news:
* INAUGURATION: It might be a challenge heading north out of the neighborhood on Jan. 20. Here's DDOT's page on the inauguration, with a map of the close-in detours and closings, and the pedestrian routes, and more.
* TUNNEL OPEN HOUSE: The next Virginia Avenue Tunnel open house is Thursday, Jan. 12 (tomorrow), from 6 to 8 pm at the Courtyard Marriott at New Jersey and L, SE. "A brief presentation and Q&A session with residents will be held at 7 p.m., in response to requests from neighbors." Also, CSX says it expects to reopen 3rd Street at Virginia during the week of Jan. 23-27. After that, there will be another temporary closing of 4th St. SE at Virginia to move a utility manhole. And 7th should be reopening at Virginia Any Minute Now.
And, a tidbit that is neither traffic nor tunnel, but is welcome:
* A BRIGHT LIGHT IN THE DISTANCE: Nationals pitchers and catchers report to the new West Palm Beach spring training facility on Feb. 14, with position players arriving by Feb. 17. (WaPo)
What else is going on these days?
Comments (15)
   
 
 More Recent News

JDLand.com Home

Comments

NavyYardRes says: (1/11/17 3:31 PM)
Do we have a date for the opening of Whole Foods and why such a delay in the buildout? Is it me or does WCS Construction seem to take double the amount of time to construct its building compared to others in the neighborhood.


JD says: (1/11/17 3:33 PM)
No current date, though I'll try to get one, keeping in mind to not shoot the messenger if it ends up not being met. :)


JC in DC says: (1/12/17 8:27 AM)
7th street was indeed open during my drive this morning! Hooray!


jdc says: (1/12/17 11:14 AM)
A GGW piece including a focus on JD Land link


202_cyclist says: (1/12/17 4:53 PM)
Thank you for the updates. We are wishing the best for Mr. JD Land.


dude says: (1/13/17 11:31 AM)
I hope this new catcher we got is three quarters as productive as Ramos. His stats suggest he's quite up and down. I have a bad feeling about this odd year, but of course I'll still be next door cheering them on.


Section314 says: (1/13/17 11:54 AM)
Dude, the Nats are undefeated and in first place as I type this!


202_cyclist says: (1/13/17 12:43 PM)
@dude-- I don't know how Derek Norris will be this year (we miss you, Buffalo!) but at least the Nats will be in first in the NL East in facial hair with him and Jayson Werth.

link


202_cyclist says: (1/13/17 12:46 PM)
Not to get into a political discussion on this fine blog but if anyone wants to have solidarity happy hour next Fri. evening at Nando's, we'd welcome the opportunity to see more neighbors.

link


conngs0 says: (1/13/17 2:01 PM)
Between Norris, Lobaton and (likely later in the season) Severino, I think the Nats are in good shape at catcher from the defensive standpoint (even though Ramos was somehow underrated as a defensive catcher). But it's unreasonable to expect any of those guys to compensate for losing Ramos (at least the pre-injury 2016 Ramos) at the plate. That offensive production is going to have to come from a full season of Turner (playing SS instead of Espinosa), Adam Eaton, and rebound seasons from Harper and (pipe dream?) Zimmerman.


RMP says: (1/13/17 4:46 PM)
Looks like the fancy men's barber shop / salon is officially coming to the old Yards leasing center space.



dude says: (1/13/17 6:33 PM)
Conngs, I agree wholeheartedly. But can this team also cope with injuries that are bound to happen? Also, without a closer we will need to score 5-6 runs a game. Guess we'll see!



snakegriffin says: (1/14/17 12:04 PM)
@RMP: Going to go out on a limb and guess the haircut prices will be outrageous, unfortunately. If prices aren't posted (and I could find none on any of their other local location websites), it's probably more than I'm willing to pay for a haircut!


conngs0 says: (1/14/17 2:41 PM)
Dude, I think the lineup has enough depth on the big league club as well as guys in AA and AAA ball to deal with the inevitable injuries, but yeah, I think 6 runs per game sounds about right. It's also going to be important when they score their runs. Seems like the Nats typically like to get a two run lead and then kind of give away at bats the rest of the game and lean on the starting pitcher. That can't really be the case next year if they expect to contend.

I'm a little worried about the starting rotation holding up though. I was super disappointed to see that Roark is playing in the WBC the year after he reached a career high in innings. Seems insane to me (just as insane as Murphy playing after admitting that glute issue might be recurring). Strasburg has actually been pretty dependable inasmuch as his trips to the DL don't last too long and he comes back sharp. Hopefully he at least keeps that up. Ross is a huge question mark. That leaves Scherzer (still suffering from a stress fracture?!) and Gio as your most dependable starters. I think Gio as a fifth starter but he's not going to carry the staff for any stretch and he's unlikely to ever give the bullpen a night off. So it's not hard to imagine a 2016 Mets scenario where the starting pitchers drop like flies and the season goes down the drain.


JD says: (1/14/17 6:54 PM)
OT, but look what I found!


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Top News
  

dcgent on April Construction Report: Perhaps but I thoght all three were on the river. JD previously wrote about Dach...
malatesta on April Construction Report: I didn't get super close to it on my run today, but it seemed like the new retai...
dcgent on April Construction Report: Has Dacha pulled out of Dock79, or been kicked out? The corner where I thought i...
202_cyclist on April Construction Report: @malatesta— I am eagerly awaiting the robot wars!
Message Board (beta)

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   SEX ABUSE
First Degree Sexual Abuse
 04/17/18
400 B/O M ST SE   THEFT
Shoplifting
 04/17/18
100 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/17/18
UNIT B/O N ST SE   ROBBERY  04/14/18
100 B/O I ST SE   THEFT
Theft 2nd Degree (theft From Building)
 04/12/18
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/12/18
1200 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/09/18
150 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 04/07/18
1000 B/O 3RD ST SE   BURGLARY
Burglary One
 04/07/18
1200 B/O NEW JERSEY AVE SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 04/05/18
UNIT B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 04/01/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 03/28/18
300 B/O I ST SE   ASSAULT WITH A DANGEROUS WEAPON  03/25/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 03/23/18
100 B/O K ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/23/18
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 03/23/18

Recent Issued Building Permits Archive  
1331 2 ST SE   
04/02/18 
DISTRICT OF COLUMBIA / MARK HARLOW CLIFFORD
SB1800225 / CONSTRUCTION
Application for Well Abandonment Workplan Approval for the abandonment of 8 monitoring wells and 21 inclinometers at the Main Pumping Station site for the DC Water Clean Rivers Project, Division I, installed under Permit Number SB1400419.
1100 2ND PL SE   
04/19/18 
CAPPER CARROLLSBURG VENTURE, LLC / TAMIKA STATON; OTIS
EN1801710 / SHOP DRAWING
Install 1 New G2S 3500LBS @350FPM, Elevator 2; 13 Floors
   
04/19/18 
CAPPER CARROLLSBURG VENTURE, LLC / TAMIKA STATON; OTIS
EN1801712 / SHOP DRAWING
Install 2 New G2S Elevators - 3500LBS@35FPM Elevator 1, 12 Floors
1331 2ND ST SE 20003   
04/05/18 
DC WATER / DAVE LEVINE
AH1800744 / CONSTRUCTION
After Hours work for structure excavation in support of DC Water, Corrman Construction 301-343-5417.
1300 4TH ST SE   
04/17/18 
null / DONNA G GRAHAM
AH1800863 / CONSTRUCTION
WR #3476633-WARD 6-20003-VAETH / BRUNO - PEPCO CREWS WILL BE WORKING THE 1200 - 1300 BLK OF 4TH ST SE - INSTALLING NETWORK TRANSFORMER AND INSTALLING PRIMARY CABLES - STARTING THURSDAY 4 / 19 / 18 UNTIL 5 / 19 / 18 - MONDAY THRU FRIDAYS AT 10PM UNTIL 10AM AND ON SATURDAY AND SUNDAYS FROM 6AM TIL 8PM.
1346 4TH ST SE   
04/10/18 
ALAN OWINGS / ROBERT HENRY
AH1800796 / CONSTRUCTION
After Hours Permit for 04 / 16 / 18 from 9AM to 7PM to perform facade, interior unit framing and drywall work, and interior Mechanical, Electrical, Plumbing and Sprinkler Rough-In.
1346 4TH ST ST SE 20003   
03/28/18 
FOREST CITY / TYLER D BARRON
AH1800712 / CONSTRUCTION
After hours for 4 / 13 / 18 to 5 / 12 / 18. Work that is to be done is quiet work of window deliveries at 5:30AM to 7:00AM by use of tower crane
82 I ST SE   
04/02/18 
GDVC EYE STREET LLC / null
FB1800055 / SUPPLEMENTAL
150 I ST SE   
03/28/18 
null
E1805313 / SUPPLEMENTAL
   
03/29/18 
null / JOHN THOMSON 3018645080
E1805337 / SUPPLEMENTAL
300 M ST SE 400   
04/09/18 
FEDERAL CENTER LP / null
M1801970 / SUPPLEMENTAL
300 M ST SE STE# 400 20024   
04/05/18 
CHARLES SMITH / EUGENE AHNS 3012811497
E1805597 / SUPPLEMENTAL
300 M ST SE STE# 400   
04/12/18 
FEDERAL CENTER LP / null
P1805161 / SUPPLEMENTAL
140 M ST SE   
03/26/18 
SQUARE 742 LLC / null
P1804630 / SUPPLEMENTAL
300 M ST SE   
03/26/18 
FEDERAL CENTER LP / JERRY BETHEA
M1801846 / SUPPLEMENTAL
401 M ST SE   
04/03/18 
TETRA TECH C/O DOEE / JESSICA REICHARD
AH1800767 / CONSTRUCTION
After hours permit for manhole access to complete inspections for DOEE Anacosta River Sediment clean up project, work hours between 7pm and 7am Monday thru Friday. Rolling work zones for all manhole access under permit # PA10374319-R1
800 NEW JERSEY AVE SE   
04/05/18 
SQUARE 737 LLC / null
P1804974 / SUPPLEMENTAL
   
04/09/18 
SQUARE 737 LLC / null
E1805700 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
04/02/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1800715 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
   
04/11/18 
CONSOLIDATED RAIL CORPORATION / DEVIN MURDOCK
SB1800265 / CONSTRUCTION
Drill 8 borings to 40ft. Convert 4 borings into 1" temporary wells, collect groundwater from each well and abandon borings.
1100 NEW JERSEY AVE SE   
04/18/18 
null
E1805988 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
04/17/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / GARY BRENT; BRENT
SG1800260 / CONSTRUCTION
Install 1 illuminated wall sign, 1 illuminated window sign and 1 window vinyl decal sign - Peets Coffee
1100 NEW JERSEY AVE SE 5TH FL   
04/19/18 
SQUARE 742 LLC / DOMINIC E TOTARO 301-725-1998
M1802089 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
04/13/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1804348 / CONSTRUCTION
INTERIOR RENOVATIONS TO OFFICE SPACE ON THE 5TH FLOOR. **DEMOLITION, LEVEL 2 ALTERATION
   
04/19/18 
SQUARE 742 LLC / PEDRO C. CASTILLO 3019219056
E1806025 / SUPPLEMENTAL
   
04/19/18 
SQUARE 742 LLC / null
E1806015 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
04/06/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / ACCUPERMIT LLC AS AGENT
B1803009 / CONSTRUCTION
Interior alterations for new tenant in existing commercial space to include partitions, mill work, electrical and plumbing fixtures, flooring and wall coverings, dining area furniture and kitchen equipment for a A-2 restaurant with 49 proposed occupancy.
125 O ST SE   
03/29/18 
DISTRICT OF COLUMBIA / JAMES M. HALLER
P1804624 / SUPPLEMENTAL
   
04/09/18 
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801762 / SHOP DRAWING
I New G2S Elevator - 3500LBS @ 200FPM (7 Floors)
   
04/09/18 
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801763 / SHOP DRAWING
Install 1 New G2S Elevator - 3500LBS @ 200FPM (6 Floors)
   
04/09/18 
DISTRICT OF COLUMBIA / TAMIKA STATON; OTIS
EN1801761 / SHOP DRAWING
Install 1 New G2S Elevators 4000LBS @ 200FPM (7 Floors)
71 POTOMAC AVE SE 20002   
04/19/18 
null / STEVE GRIFFIN
BP1802939 / POST CARD
71 POTOMAC AVE SE   
03/26/18 
FORIDA ROCK PROPERTIES INC / null
BCIV1800074 / CONSTRUCTION
This permit is for rough grading and erosion and sediment control civil work associated with the temporary parking lot, relocation of the dog park and construction staging area on the undeveloped portion of the lot.
   
04/17/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
FD1800020 / CONSTRUCTION
Foundation only for new residential building
227 TINGEY ST SE   
03/28/18 
UNITED STATES OF AMERICA / ERICKA CLARK
AH1800760 / CONSTRUCTION
significant concrete pours and tower crane erection 5AM - 7AM and 7PM - 10:00PM
   
04/12/18 
UNITED STATES OF AMERICA / STEPHEN J. EXELBERT
P1805022 / SUPPLEMENTAL
300 TINGEY ST SE   
04/12/18 
MERCURY LLC / WILL TEASS
B1803433 / CONSTRUCTION
INTERIOR FIT-OUT / EXTENSION OF EXISTING TENANT SUITE (APPROVED UNDER B1605215) INCLUDING NEW MECHANICAL AND ELECTRICAL WORK. **LEVEL 2 ALTERATION
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.