While these dates are always subject to change, CSX announced on Friday that it expects to reopen 4th Street just south of the freeway by Wednesday, Nov. 23, as it completes the demolition of the Phase 1 temporary bridge deck over the new tunnel that is being built, and construction of the new Phase 2 deck over the existing tunnel that will now be rebuilt and expanded.
Once the 4th Street intersection opens, the next big closure will be prepped, with the expectation that 3rd Street SE will close at Virginia Avenue for up to eight weeks, beginning perhaps on Monday, Nov. 28, to do the same demolition of the Phase 1 deck and construction of the Phase 2 deck.
Note that, unlike when the Phase 1 deck was built over 3rd Street earlier this year in a way that allowed northbound traffic to continue to flow, this is a full closure. (Though pedestrian access will remain in place, as will access to the Capitol Quarter driveway entrance on 3rd.)
This does not affect access to I-695 from the 3rd Street ramp.
If you want to see recent photos of the new tunnel and all the related construction, the Coffee with Chuck slides from Nov. 16 have a pile of them. (The slides also note that this is month #18 of the expected 42 months of total construction.)
Comments (10)
   
 
 More About CSX/Virginia Ave. Tunnel

JDLand.com Home

Comments

202_cyclist says: (11/21/16 11:04 AM)
It's outside of the neighborhood but the NYT has a good profile of Capitol Hill, along with some nice photos: link .


G Street says: (11/21/16 12:01 PM)
I don't want to jinx it, of course, but (so far) this tunnel project has gone = pretty smoothly


conngs0 says: (11/21/16 12:45 PM)
I think it's been pretty much as-advertised, which is a good thing. There's no arguing that closing 3rd Street is going to be a significant inconvenience, but hopefully traffic flows reasonably well through the alternative routes and the closure doesn't last any longer than the planned 6-8 weeks. It's like your standard broken bone!


Ampersand says: (11/21/16 12:52 PM)
If 3rd was going to need to be closed for this long, I can't think of a better time to do it than now. Few or no major events in the neighborhood, and much less regular traffic due to the holidays. I do hope that the northbound light at 6th and Virginia is retimed, though; the left-turn lanes already get pretty backed up without all the diverted traffic. I don't go through at rush hour much, but it's very frustrating to sit in a 12-car line with a red light while VA is empty of westbound cars. I almost think it might function better as a four-way stop...


JD says: (11/21/16 12:57 PM)
I agree with @Ampersand on this being optimal timing to close 3rd. Longtime area residents such as myself know how much this town empties out between Thanksgiving and Christmas, and with a change in administration and the party in the White House, I expect that to be even more pronounced this year.

(I bet they will be pressed by TPTB to be sure to have 3rd reopened by the inauguration, though.)

I also hope there will be a retiming of the 3rd Street light. Coming southbound on 3rd right now there's at most time for three cars (more often two, if the first driver isn't quick on the gas) to get through before it turns back to red, and at that point only drivers who know that northbound 3rd still has a green and a left arrow know that they can turn right-on-red to get to the freeway ramp if there's no oncoming traffic.


202_cyclist says: (11/21/16 12:59 PM)
In other news, the Capitol Hill Corner blog has a post on the new community center.

Capitol Quarter Community Center – Key to Mixed Income Community – a Ship without a Captain
link


Ampersand says: (11/21/16 4:39 PM)
@JD oh gosh, I hate 3rd & VA southbound. In addition to the stupidly short cycle, the worst part in my opinion is that the southbound green only triggers if you trip a sensor. On a bike, it's impossible to trigger, and in a car if you miss it you'll sit there indefinitely with cycle after cycle of permanent red light. I once was driving home at 1am or so and it Just Would Not Trigger. I waited at a completely empty intersection for 5+ minutes (6 cycles) before giving up and running the red light. After that I gave up and started diverting to 4th; I use the pass-through on a bike, and in a car I turn right onto VA and left onto 3rd.

I would love to see the northbound left turn arrow moved to the beginning of the cycle, then after a ~10 second lead a switch to two-way greens. Also for the crosswalk to get a countdown timer, as I see a lot of pedestrians who give up hope and jaywalk.


dude says: (11/21/16 10:23 PM)
Yeah, closing 3rd will suck for me. Ah well, 8 weeks isn't too long.


dude says: (12/7/16 10:35 PM)
In case people haven't seen, they've closed this now. 8 week countdown in process.


conngs0 says: (12/8/16 1:10 PM)
Two days in a row I've forgotten that 3rd is closed and tried to head north under the freeway that way! That morning autopilot takes awhile to change course I suppose.... I agree with dude that eight weeks can't come soon enough!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

dude on Ramen Coming: Our dog likes to bark when she hears sirens which woke me up. Despite being jus...
202_cyclist on Ramen Coming: I posted without seeing the report of the injuries (the earlier MPD tweet didn’t...
JD on Ramen Coming: (I updated the comment/tidbit with the report from MPD.)
202_cyclist on Ramen Coming: Unfortunately, my wife heard it. Hopefully there weren’t any injuries or fatali...
JD on Ramen Coming: There was a shooting last night/early Saturday morning outside the Capper Commun...
dude on Ramen Coming: It’s hard to believe that the Virginia Avenue Tunnel project is coming to an end...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/19/18
200 B/O I ST SE   ROBBERY  07/17/18
1200 B/O 1ST ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/15/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 07/15/18
1200 B/O 4TH ST SE   ASSAULT WITH A DANGEROUS WEAPON  07/14/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/13/18
900 B/O POTOMAC AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/13/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/11/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/11/18
UNIT B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/10/18
100 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/18
700 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/06/18
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/02/18
400 B/O M ST SE   THEFT
Shoplifting
 07/02/18
200 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/28/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/28/18
900 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/27/18
1000 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/25/18
1100 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/24/18

Recent Issued Building Permits Archive  
1100 1ST ST SE   
07/19/18 
ONYX ACQUISITION LLC / BAKER DC LLC
TC1800039 / CONSTRUCTION
Permit to erect tower crane on private property
1346 4TH ST SE   
07/02/18 
PC 1346 LLC / INSPECTOR STEVENS
B1811126 / CONSTRUCTION
For elevator review ONLY in reference to permit # B 1711594
   
07/11/18 
FC1346 LLC / ASHLY SALISBURY; KONE
EN1802014 / SHOP DRAWING
Installation of 4 KONE Mono500 Elevators
2 I ST SE   
07/02/18 
FORIDA ROCK PROPERTIES INC / DANIEL P. THOMPSON
P1807204 / SUPPLEMENTAL
   
07/03/18 
MCDONALDS CORPORATION / BOB BIROONAK; X
SG1800364 / CONSTRUCTION
one illuminated ID sign
150 I ST SE   
07/18/18 
null / JOHN H THOMSON 301-864-5080
E1808693 / SUPPLEMENTAL
417 I ST SE   
06/28/18 
DALE E OWEN / TIMOTHY P. CROPP 703-698-8855
M1802925 / SUPPLEMENTAL
200 K ST SE   
07/19/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / XIOMARA A VARGAS APONTE
TN1800154 / CONSTRUCTION
The International Colombian Festival at Canal Park. We are placing 8x8 fences (560 feet total). 2 tents 20 x20, 1 tent 10x30 20x16x3 plus a catwalk 8x8 65 KW
300 M ST SE   
07/02/18 
FEDERAL CENTER LP / null
E1808201 / SUPPLEMENTAL
400 M ST SE   
07/09/18 
null / DONNA G GRAHAM
AH1801113 / CONSTRUCTION
WR #3476633-VAETH / BRUNO-PEPCO CREWS WORKING THE 300-400 BLK OF M ST SE SPLICING CABLES - FROM TUESDAY NIGHT (7 / 10 / 18) THROUGH SATURDAY NIGJT (7 / 14 / 18) FROM 9PM TIL 9AM
861 NEW JERSEY AVE SE   
06/28/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1801055 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities. TO EXCLUDE LEGAL HOLIDAYS***
   
07/12/18 
CONSOLIDATED RAIL CORPORATION / RPS INC
SB1800373 / CONSTRUCTION
PER WORK PLAN, ENVIRONMENTAL INVESTIGATION, DATED JUNE 25, 2018 (SEE ATTACHED), THE WORK INVOLVES DRILLING 10 SOIL BORINGS USING A GEOPROBE RIG FOR THE PURPOSE OF COLLECTING SOIL SAMPLES FOR THE ENVIRONMENTAL SUBSURFACE EXPLORATION. BORING DEPTHS RANGE FROM 20 TO 50 FT. BORINGS WILL BE PROPERLY BACKFILLED AFTER COMPLETION.
1200 NEW JERSEY AVE SE 1ST FL 20590   
07/06/18 
JBG/FEDERAL CENTER LLC / DAVID T. MORALES
P1807299 / SUPPLEMENTAL
1299 NEW JERSEY AVE SE   
07/12/18 
UNITED STATES OF AMERICA / GARRETT MILLS
TN1800142 / CONSTRUCTION
Event: Play Ball Park DC Location: The Yards, Parcel A (Corner of First Street and M Street); Play Ball Park is a Fan event sponsor zone that features BaseBall clinics, Sponsor Areas, Food and Beverage, and Entertainment.
   
06/29/18 
UNITED STATES OF AMERICA / SHANNON BURKE
SB1800332 / CONSTRUCTION
Site is being investigated before construction in accordance with Consent Order between GSA and EPA. Temporary soil borings will be installed for soil and groundwater sampling.
71 POTOMAC AVE SE   
06/27/18 
FORIDA ROCK PROPERTIES INC / BARR CONCRETE
TC1800036 / CONSTRUCTION
towercrane for jobsite use
   
07/02/18 
FORIDA ROCK PROPERTIES INC / DANIEL P. THOMPSON
P1807202 / SUPPLEMENTAL
79 POTOMAC AVE SE   
07/13/18 
RIVERFRONT HOLDINGS I LLC / CARLOS H. LOPEZ
P1807478 / SUPPLEMENTAL
221 TINGEY ST SE   
06/27/18 
GONE YARD HOTEL OWNER, LLC / STEPHEN J. EXELBERT
P1807049 / SUPPLEMENTAL
(1) Gas generator (1) Gas Meter (1) Eye washer (12) Backwater Valve
227 TINGEY ST SE   
07/09/18 
UNITED STATES OF AMERICA / DFM DEVELOPMENT SERVICES, LLC
AH1801111 / CONSTRUCTION
Afterhours Permit to allow for work under Permit B1801871 (Yards Parcel L2) to occur from 5am to 7am on July 12 through July 17. ANC approval provided.
   
07/12/18 
UNITED STATES OF AMERICA / DFM DEVELOPMENT SERVICES, LLC
B1806775 / CONSTRUCTION
Parcel L1 - Revision to Permit FD1700126 to incorporate changes requested and approved by DC Water.
355 WATER ST SE   
07/12/18 
UNITED STATES OF AMERICA / null
E1808509 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.