Since January, 2003
            
 Sliding from Before to After

While these dates are always subject to change, CSX announced on Friday that it expects to reopen 4th Street just south of the freeway by Wednesday, Nov. 23, as it completes the demolition of the Phase 1 temporary bridge deck over the new tunnel that is being built, and construction of the new Phase 2 deck over the existing tunnel that will now be rebuilt and expanded.
Once the 4th Street intersection opens, the next big closure will be prepped, with the expectation that 3rd Street SE will close at Virginia Avenue for up to eight weeks, beginning perhaps on Monday, Nov. 28, to do the same demolition of the Phase 1 deck and construction of the Phase 2 deck.
Note that, unlike when the Phase 1 deck was built over 3rd Street earlier this year in a way that allowed northbound traffic to continue to flow, this is a full closure. (Though pedestrian access will remain in place, as will access to the Capitol Quarter driveway entrance on 3rd.)
This does not affect access to I-695 from the 3rd Street ramp.
If you want to see recent photos of the new tunnel and all the related construction, the Coffee with Chuck slides from Nov. 16 have a pile of them. (The slides also note that this is month #18 of the expected 42 months of total construction.)
Comments (10)
   
 
 More About CSX/Virginia Ave. Tunnel

JDLand.com Home

Comments

202_cyclist says: (11/21/16 11:04 AM)
It's outside of the neighborhood but the NYT has a good profile of Capitol Hill, along with some nice photos: link .


G Street says: (11/21/16 12:01 PM)
I don't want to jinx it, of course, but (so far) this tunnel project has gone = pretty smoothly


conngs0 says: (11/21/16 12:45 PM)
I think it's been pretty much as-advertised, which is a good thing. There's no arguing that closing 3rd Street is going to be a significant inconvenience, but hopefully traffic flows reasonably well through the alternative routes and the closure doesn't last any longer than the planned 6-8 weeks. It's like your standard broken bone!


Ampersand says: (11/21/16 12:52 PM)
If 3rd was going to need to be closed for this long, I can't think of a better time to do it than now. Few or no major events in the neighborhood, and much less regular traffic due to the holidays. I do hope that the northbound light at 6th and Virginia is retimed, though; the left-turn lanes already get pretty backed up without all the diverted traffic. I don't go through at rush hour much, but it's very frustrating to sit in a 12-car line with a red light while VA is empty of westbound cars. I almost think it might function better as a four-way stop...


JD says: (11/21/16 12:57 PM)
I agree with @Ampersand on this being optimal timing to close 3rd. Longtime area residents such as myself know how much this town empties out between Thanksgiving and Christmas, and with a change in administration and the party in the White House, I expect that to be even more pronounced this year.

(I bet they will be pressed by TPTB to be sure to have 3rd reopened by the inauguration, though.)

I also hope there will be a retiming of the 3rd Street light. Coming southbound on 3rd right now there's at most time for three cars (more often two, if the first driver isn't quick on the gas) to get through before it turns back to red, and at that point only drivers who know that northbound 3rd still has a green and a left arrow know that they can turn right-on-red to get to the freeway ramp if there's no oncoming traffic.


202_cyclist says: (11/21/16 12:59 PM)
In other news, the Capitol Hill Corner blog has a post on the new community center.

Capitol Quarter Community Center – Key to Mixed Income Community – a Ship without a Captain
link


Ampersand says: (11/21/16 4:39 PM)
@JD oh gosh, I hate 3rd & VA southbound. In addition to the stupidly short cycle, the worst part in my opinion is that the southbound green only triggers if you trip a sensor. On a bike, it's impossible to trigger, and in a car if you miss it you'll sit there indefinitely with cycle after cycle of permanent red light. I once was driving home at 1am or so and it Just Would Not Trigger. I waited at a completely empty intersection for 5+ minutes (6 cycles) before giving up and running the red light. After that I gave up and started diverting to 4th; I use the pass-through on a bike, and in a car I turn right onto VA and left onto 3rd.

I would love to see the northbound left turn arrow moved to the beginning of the cycle, then after a ~10 second lead a switch to two-way greens. Also for the crosswalk to get a countdown timer, as I see a lot of pedestrians who give up hope and jaywalk.


dude says: (11/21/16 10:23 PM)
Yeah, closing 3rd will suck for me. Ah well, 8 weeks isn't too long.


dude says: (12/7/16 10:35 PM)
In case people haven't seen, they've closed this now. 8 week countdown in process.


conngs0 says: (12/8/16 1:10 PM)
Two days in a row I've forgotten that 3rd is closed and tried to head north under the freeway that way! That morning autopilot takes awhile to change course I suppose.... I agree with dude that eight weeks can't come soon enough!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

202_cyclist on Super Tuesday Tidbits: 2-story retail is such a waste for the 1299 First Street lot.
CJBabyDaddy on Super Tuesday Tidbits: @JES: With all the stress and anxiety we’re enduring, you had to go rub salt in...
202_cyclist on Super Tuesday Tidbits: Gary— yes, they play that and He revelry every morning at the Navy Yard. Someti...
JES on Super Tuesday Tidbits: @NWtoSE I just saw "Coming 2019 Showplace ICON theatre" on the map in ...
NWtoSE on Super Tuesday Tidbits: https://www.mgaco.com/spaces/lease-sale/1299-1st-st-se
NWtoSE on Super Tuesday Tidbits: @JScott280- I don't think they have a tenant, but the developer plans to build a...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O 1ST ST SE   THEFT
Theft First Degree (all Other Larceny)
 04/07/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/28/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/23/20
1500 B/O SOUTH CAPITOL ST SE   THEFT
Shoplifting
 03/11/20
200 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 03/09/20

Recent Issued Building Permits Archive  
1300 4TH ST SE 1001   
03/16/20 
LA FAMOSA LLC / null
P2004796 / SUPPLEMENTAL
   
03/20/20 
LA FAMOSA LLC / null
E2005975 / SUPPLEMENTAL
1300 4TH ST SE 1006   
03/16/20 
LA FAMOSA LLC / null
M2001859 / SUPPLEMENTAL
1300 4TH ST SE   
03/13/20 
LA FAMOSA LLC / KIMOY LALLEMENT; POTOMAC CONSTRUCTION SERVICES
TL2000028 / CONSTRUCTION
New tenant layout for commercial kitchen, two restrooms, point of sale bar, and dining seating, new lighting and mechanical zones. 2,338 sf INDOOR OCCUPANCY: 84 PERSONS WITH 59 SEATS OUTDOOR OCCUPANCY: 38 PERSONS WITH 38 SEATS TOTAL MAX OCCUPANCY: 122
900 5TH ST SE   
03/24/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / KAYLA TRICE; DELAWARE
EN2001608 / SHOP DRAWING
Install 3 new hydraulic passenger elevators
200 I ST SE   
03/17/20 
DISTRICT OF COLUMBIA / LEIA TERRELL
B2006382 / CONSTRUCTION
Tenant Alterations of existing office doors and wall. Including relocation of existing electrical, and mechanical terminals. NO CHANGE OF EGRESS, USE OF OCCUPANCY, NO EXTERIOR LAND DISTURBANCE, NO BASE BUILDING STRUCTURAL WORK.
   
04/01/20 
DISTRICT OF COLUMBIA / null
E2006294 / SUPPLEMENTAL
300 M ST SE   
04/02/20 
FEDERAL CENTER LP / CENTER; EDGE CONSTRUCTION
B2004640 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL, LIFE SAFETY AND STRUCTURAL HANGING PARTITION. 3500 SQUARE FEET. AMENTUM
139 N ST SE   
03/16/20 
PARCEL I FC ROWAN / MIGUEL RIOS; GRIFFIN DEWATERING, LLC
SB2000152 / CONSTRUCTION
Type of proposed System: Deep well dewatering system consisting of 16 wells around the perimeter of the shored excavation and 2 wells within the excavation in a mutually agreed layout. • Installation Method: Wells will be drilled up to 70’ deep, utilizing Griffin’s hollow stem auger drilling rig to drill up to a 10.25” I.D. borehole. Deep wells come complete with screen, casing, riser pipe and a s...
1299 NEW JERSEY AVE SE   
03/13/20 
FOREST CITY SEFC LLC / SARAH J. NAPIER
BCIV2000067 / CONSTRUCTION
Revisions to BCIV1800153. This submission is for approval stamps only. No change in work.
71 POTOMAC AVE SE   
03/27/20 
MRP RESIDENTIAL / KAYLA SHATTUCK; KAYLA SHATTUCK; PARADIGM CONTRACTORS LLC
BCIV2000036 / CONSTRUCTION
This permit is for site civil work at 71 Potomac Avenue SE including stormwater management and erosion & sediment control. See plans for more details.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.