 There apparently is a DC Housing Authority "construction progress" meeting tonight at the Community Center at 6 pm. I don't have more specifics from that, and I won't be able to be there, alas, but I do know that they will be displaying the renderings showing (at last) the designs for the two new buildings planned for Square 767, the block bounded by 3rd, 2nd, I, and K, in advance of a planned zoning filing early next year. Given that it's been almost precisely one year since the specifics for this project were last discussed at a public meeting, I would prefer to wait for the zoning filing to describe any plans beyond that there will be a condo building by Capitol Quarter developer EYA on the southern end of the block, and a smaller rental building that will be some mix of affordable units and public housing units on the north end. The above rendering shows both buildings as seen from Canal Park, with the taller condo building at right along K Street and the shorter affordable building at left along I. The drawings below show the block as seen from 3rd and I, in both wide and close-up views, along with the current state of that stretch of 3rd. If you have any feedback for the plans, head to the meeting tonight (sorry for the late notice) or contact the Housing Authority, or just sound off in the comments.
JDLand.com Home
malatesta says: (11/15/16 8:29 PM)
Off topic a bit, but the big tree at New Jersey and I has been cut down. The corner looks way different now. A pity, it was one of the few tall trees left in the neighborhood.
ValveetaChz says: (11/16/16 9:52 AM)
The construction is still four years away. Square 769 is set to start either next month or January.
JD says: (11/16/16 9:54 AM)
That is correct. (Did I say it otherwise in the post? I didn't mean to.)
knavyard says: (11/16/16 10:07 AM)
Malatesta, it is sad that the tree was cut down but it was diseased and dying (it was barely putting out leaves) and only a matter of time before it came down on its own. You can even see the rotted out heartwood in the stump. So, sad, but necessary.
202_cyclist says: (11/17/16 11:32 AM)
This is across the way in SW but the Wharf development will be getting water taxi service. Hopefully our neighborhood can get water taxi service to Old Town, National Harbor, and DCA beyond the novelty service we have to/from the Nats games. link
RMP says: (11/17/16 3:25 PM)
The DCist article definitely made it sound like we're getting water taxi service next year at the Diamond Teague Park dock.
conngs0 says: (11/18/16 9:48 AM)
Agreed. My impression from the Washington Business Journal article is that there will be daily water taxi service to/from Nationals Park in addition to the Warf. With the number of residents expected to move into the Navy Yard neighborhood in the next year or so, this makes a lot of sense. On the 767/769N subject, I suppose the renderings look ok, but we'll just have to see how (whether) the condo buildings are integrated with the public housing units. I'm thrilled to see progress on adding the promised affordable housing units back to the old Capper footprint and proud to be in a neighborhood that continues to address the shortage of public housing. Nevertheless, I'm also cognizant of the fact that while other public housing projects throughout the city have served to drag down development, lower property values, raise crime rates, etc., the integrated nature of the Capitol Quarter neighborhood so far seems like it's on track to being a tremendous success and might serve as a model for the future. It'll be a real shame if the separate buildings for public and market-rate housing hinders that positive momentum. In short, although I was unfortunately not in town for the DCHA meeting this week, my only request of them is to please not screw this up!
JES says: (11/18/16 3:48 PM)
Was one of the docks at Yards Park intended to be for a water taxi? That'd be a better year-round place for a daily boat to dock, at least until more gets built at Florida Rock and along 1st Street.
202_cyclist says: (11/18/16 4:15 PM)
As someone noted elsewhere, with the unabated global warming, perhaps we'll have water taxi service to U St and H St NE next.
walt says: (11/21/16 9:09 AM)
Would love affordable water taxi, but at $40 round-trip, it just isn't a serious mode of transportation yet. I would love to hop on a water taxi and jump over to Old Town for lunch or down to National Harbor for a little shopping. I can't understand why the businesses and BIDs in these three locations (and Georgetown) aren't joining together and subsidizing the water taxis. Or at least validating purchases for discounted fares.
MoreGreenSpacePlease says: (11/22/16 8:40 PM)
Is there a plan to try to leave the mature trees on 3rd standing as they develop those vacant parcels? They are still healthy, beautiful trees and add so much to the area in terms of habitat for the local birds and a little co2 conversion to help us breathe with all these massive buildings. There isn't enough green space for all the people who are coming, and their dogs.
conngs0 says: (11/27/16 10:40 PM)
Following up my previous entry, the events of the last few days have really caused me to worry about the execution behind lots 767, 769N, etc. Primarily, the heartbreaking story of the sixteen year old girl shot at Potomac Gardens is beyond tragic on its own merits. link But a distant second is the fact that no one familiar with that area was surprised to hear that story. No one should have to live in such an environment. Likewise, no community should have to absorb a consistent source of violent crime. There's no reason why everyone can't be served by a properly executed and administered integration of low income and market based housing, and I desperately hope DCHA and the rest of the city government is up to the challenge when it comes to these lots.
Add a Comment:
Comments are closed for this post.
JDLand Comments RSS Feed
See All Current News Items |
Full Blog Archive
|
|
|
Full Neighborhood Development Map
There's a lot more than just the projects listed here. See the complete map of completed, underway, and proposed projects all across the neighborhood.
What's New This Year A quick look at what's arrived or been announced since the end of the 2018 baseball season.
Food Options, Now and Coming Soon
There's now plenty of food options in the neighborhood. Click to see what's here, and what's coming.
Anacostia Riverwalk
A bridge between Teague and Yards Parks is part of the planned 20-mile Anacostia Riverwalk multi-use trail along the east and west banks of the Anacostia River.
Virginia Ave. Tunnel Expansion
Construction underway in 2015 to expand the 106-year-old tunnel to allow for a second track and double-height cars. Expected completion 2018.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Rail and Bus Times Get real time data for the Navy Yard subway, Circulator, Bikeshare, and bus lines, plus additional transit information.
Canal Park
Three-block park on the site of the old Washington Canal. Construction begun in spring 2011, opened Nov. 16, 2012.
Nationals Park
21-acre site, 41,000-seat ballpark, construction begun May 2006, Opening Day March 30, 2008.
Washington Navy Yard
Headquarters of the Naval District Washington, established in 1799.
Yards Park
5.5-acre park on the banks of the Anacostia. First phase completed September 2010.
Van Ness Elementary School
DC Public School, closed in 2006, but reopening in stages beginning in 2015.
Agora/Whole Foods
336-unit apartment building at 800 New Jersey Ave., SE. Construction begun June 2014, move-ins underway early 2018. Whole Foods expected to open in late 2018.
New Douglass Bridge
Construction underway in early 2018 on the replacement for the current South Capitol Street Bridge. Completion expected in 2021.
1221 Van
290-unit residential building with 26,000 sf retail. Underway late 2015, completed early 2018.
NAB HQ/Avidian
New headquarters for National Association of Broadcasters, along with a 163-unit condo building. Construction underway early 2017.
Yards/Parcel O Residential Projects
The Bower, a 138-unit condo building by PN Hoffman, and The Guild, a 190-unit rental building by Forest City on the southeast corner of 4th and Tingey. Underway fall 2016, delivery 2018.
New DC Water HQ
A wrap-around six-story addition to the existing O Street Pumping Station. Construction underway in 2016, with completion in 2018.
The Harlow/Square 769N Apts
Mixed-income rental building with 176 units, including 36 public housing units. Underway early 2017, delivery 2019.
West Half Residential
420-unit project with 65,000 sf retail. Construction underway spring 2017.
Novel South Capitol/2 I St.
530ish-unit apartment building in two phases, on old McDonald's site. Construction underway early 2017, completed summer 2019.
1250 Half/Envy
310 rental units at 1250, 123 condos at Envy, 60,000 square feet of retail. Underway spring 2017.
Parc Riverside Phase II
314ish-unit residential building at 1010 Half St., SE, by Toll Bros. Construction underway summer 2017.
99 M Street
A 224,000-square-foot office building by Skanska for the corner of 1st and M. Underway fall 2015, substantially complete summer 2018. Circa and an unnamed sibling restaurant announced tenants.
The Garrett
375-unit rental building at 2nd and I with 13,000 sq ft retail. Construction underway late fall 2017.
Yards/The Estate Apts. and Thompson Hotel
270-unit rental building and 227-room Thompson Hotel, with 20,000 sq ft retail total. Construction underway fall 2017.
Meridian on First
275-unit residential building, by Paradigm. Construction underway early 2018.
The Maren/71 Potomac
264-unit residential building with 12,500 sq ft retail, underway spring 2018. Phase 2 of RiverFront on the Anacostia development.
DC Crossing/Square 696
Block bought in 2016 by Tishman Speyer, with plans for 800 apartment units and 44,000 square feet of retail in two phases. Digging underway April 2018.
One Hill South Phase 2
300ish-unit unnamed sibling building at South Capitol and I. Work underway summer 2018.
New DDOT HQ/250 M
New headquarters for the District Department of Transportation. Underway early 2019.
37 L Street Condos
11-story, 74-unit condo building west of Half St. Underway early 2019.
CSX East Residential/Hotel
225ish-unit AC Marriott and two residential buildings planned. Digging underway late summer 2019.
1000 South Capitol Residential
224-unit apartment building by Lerner. Underway fall 2019.
Capper Seniors 2.0
Reconstruction of the 160-unit building for low-income seniors that was destroyed by fire in 2018.
Chemonics HQ
New 285,000-sq-ft office building with 14,000 sq ft of retail. Expected delivery 2021.
Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.
|
|
No records added or modified in the past two weeks. |
|
Recent Issued Building Permits
| Archive
|
|
1300 4TH ST SE 1001
|
|
02/22/21
AP BOWER RETAIL LLC / null
E2104231 /
SUPPLEMENTAL
|
1346 4TH ST SE APT 1M
|
|
02/06/21
null / NA NA NA
EHOP21945129 /
HOME OCCUPATION
|
1331 4TH ST SE R-2
|
|
02/08/21
FC 1331 LLC / FC 1331 LLC
BP2101814 /
POST CARD
|
10 I ST SE
|
|
02/16/21
CAPITOL HILL RACQUET CLUB / NA; VICTORIA STEINHOFF
SB2100112 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
555 L ST SE
|
|
01/29/21
UNITED STATES OF AMERICA / RENNE WELL; RICK HARLAN SCHNEIDER
B2102004 /
CONSTRUCTION
DGS PROJECT REHABILITATION+RESTORATION OF THE HISTORIC LINCOIN FIELDHOUSE
|
861 NEW JERSEY AVE SE 20003
|
|
02/23/21
809-853 NEW JERSEY AVE ACQUISITION LLC / SUSANA VAZQUEZ
AH2100728 /
CONSTRUCTION
Dismantling of tower crane.
|
809 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC 809-853 NEW JERSEY AVENUE ACQUISITION LLC / null
E2103926 /
SUPPLEMENTAL
|
853 NEW JERSEY AVE SE
|
|
02/11/21
GREYSTAR GP LLC / null
E2103924 /
SUPPLEMENTAL
|
861 NEW JERSEY AVE SE
|
|
02/05/21
GS CSX HOTEL OWNER LLC / null
E2103762 /
SUPPLEMENTAL
|
1275 NEW JERSEY AVE SE
|
|
02/02/21
FC 1275 NJ LLC / null
E2103662 /
SUPPLEMENTAL
|
|
|
02/11/21
FC 1275 NJ LLC / null
P2103445 /
SUPPLEMENTAL
|
848 SOUTH CAPITOL ST SE
|
|
02/16/21
CXS TRANSPORTATION INC / VICTORIA STEINHOFF; TBD
SB2100111 /
CONSTRUCTION
Installation of up to six (6) 3-inch diameter direct-push Geoprobe borings to depths of up to 30 feet below grade as part of an environmental assessment.
|
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;
|
|
|
No commercial transaction records added or modified in the past two weeks. |
|
|