Since January, 2003
            
 Sliding from Before to After

It took a while for the weather and the calendar to successfully dovetail, but on Sunday the JDLand Camera finally got a look at the new plaza now nestled between Diamond Teague Park and Dock 79, as well as the extension of the Anacostia Riverwalk westward. (I missed out on the fountains, though.)
Once The Salt Line and All-Purpose open in their spots next year, and baseball fans figure out that there's a spot to hang out on the stadium's southeastern side (with handy built-in tables to eat carryout pizza at), this may become a pretty activated location. Especially in comparison to what it looked like 11 years ago.
Comments (23)
   
 
 More About Florida Rock

JDLand.com Home

Comments

202_cyclist says: (10/19/16 3:36 PM)
My wife and I walked over there on Sunday afternoon. The public spaces of this site are very nice. On the western side of this, towards the proposed Bardo site, there is quite a bit of space. It would be nice if the Capitol Riverfront BID sponsored some kind of activity or seasonal events there, like a Saturday farmer's market, etc...

I can only imagine how nice this location will be once the outside dining opens.


202_cyclist says: (10/19/16 3:38 PM)
Those photos would have looked even better if the Nationals were still playing now...


RMP says: (10/19/16 3:39 PM)
Great pictures. I also checked this out last weekend. Nice space. Dock 79 seemed completely deserted at the time. We could see pretty clearly into a bunch of units facing the river and it didn't look like any of them were occupied. I guess it only started move-ins a couple months ago so maybe it's still pretty empty.


SWag says: (10/19/16 3:46 PM)
Happy to have the new addition, but that brown surface looks horrible...


JD says: (10/19/16 3:50 PM)
There will also be prime seating for watching the Douglass Bridge construction/demolition.



Chaifetz10 says: (10/19/16 3:54 PM)
@202: Dock79 is still building out the dog park and volley ball courts. Landscaping just went in yesterday and they're on track to have them completed in the next few weeks. Look for the construction fence to come down soon after.

@RMP: Move ins are happening almost on a daily basis. It appears that most have been on the South half of the building as only see a few people on the North end of the court yard from our unit. Construction crews are still finishing the rooftop deck so it's still not open to residents... and I can see cleaning crews on some of the top floors getting units ready for move ins as well.


walt says: (10/19/16 4:26 PM)
Those seats look like prime viewing for bands on a barge! We need a Barge Band ASAP!


CJBabyDaddy says: (10/19/16 10:16 PM)
If you know any barge bands auditioning to fill an inexperienced kazoo virtuoso vacancy, I can give you my agent's contact info to pass along.


G Street says: (10/20/16 2:00 PM)
Like the yellow *thrones* in the park.


dcgent says: (10/20/16 3:42 PM)
Had a long talk with a Bardo bartender last weekend. Those are its fermentation tanks farther down near the bridge. They're still quite confident of moving into that space by spring time--despite some roadblocks--and I guess they can brew beer there in any case? They say the developer doesn't want to do that third site until the old bridge is own/new is up, so they think they could have a cool beergarden site for 2-5 years. might add a pizza oven outside for slices, etc though the new pizza place is there. We'll see if they can pull it off.


202_cyclist says: (10/23/16 2:29 PM)
I predict another JD Land update soon.


JD says: (10/23/16 9:08 PM)
Nah, I was just filling in some holes this morning and testing my new camera some more.

But maybe some tidbits are in the offing.


E. Masquinongy says: (10/24/16 8:42 AM)
Regarding the Douglass Bridge demo, when will that start?


JD says: (10/24/16 9:04 AM)
They haven't even awarded the design/build contract yet for the Douglass Bridge. I can't imagine it's anything less than a year away.


NavyYahd says: (10/26/16 2:00 PM)
Does anyone know what the plan is with what appears to be landscaping in the lot across from Park Chelsea?


202_cyclist says: (10/27/16 12:09 PM)
Construction is definitely underway for the new DC Water and Sewer Authority headquarters. I saw that a barrier was installed around the perimeter of the construction and a construction crew was remove the current concrete and pavement at the site.


jdc says: (10/27/16 3:30 PM)
I've said it for other parts of the area, but turning the lower 1st St. corridor into something other than the dump it is will have a HUGE impact on JD Land.


JD says: (10/28/16 3:36 PM)
Did not really intend to go quiet this week, but gears are kind of shifting in Mr. JDLand's treatment, and so my focus is elsewhere right now as we try to get everything lined up. (He's still feeling pretty good, though.)


202_cyclist says: (10/28/16 4:38 PM)
Our thoughts are with Mr. JD Land.


JNB says: (11/1/16 10:48 AM)
Prayers for your family.


jdc says: (11/1/16 12:58 PM)
Paper signage on doors of Homewood Suites says "coming soon".


202_cyclist says: (11/3/16 2:46 PM)
Of possible interest -- this was sent on the Capitol Hill listserve last week. I'll be attending this meeting.

===================================================================

The DC Office of Planning (OP) is amending the District’s Comprehensive Plan, a 20-year framework that guides future growth and development in the city and shapes the places we live, work, shop, and play. OP launched the second amendment cycle to the Comprehensive Plan this year to ensure that the Plan remains responsive to the needs of the community.

Your ideas are essential to a successful amendment process. Between October 19th and November 14th, OP is hosting a series of 7 community meetings. The meetings are organized geographically by Area Elements. Since the Comprehensive Plan is a 20-year plan, the Plan uses Area Elements instead of Wards since Ward boundaries can change every ten years. Please RSVP and check out the map to find a meeting closest to you. For more details about the Comprehensive Plan, Area Elements and the Amendment Process, please visit PlanDC.dc.gov and sign up for alerts.

Please join us for a meeting in your area element which includes Capitol Hill/Lower Anacostia/Near Southwest:
Date: Nov 3rd
Location: Jefferson Academy Middle School Academy, 801 7th Street SW
Nearest Metro: L’Enfant Plaza
Time: 6:00-8:30pm (presentation starts at 6:30)

Contact the DC Office of Planning at PlanDC@dc.gov or 202-442-7600 and follow us on Twitter at @OPinDC #PlanDC #DCCompPlan.

Come learn about the amendment process, share your ideas and help shape the future of the District!


dude says: (11/6/16 9:23 AM)
Walked over there last night for the first time since the new stuff was put in. Looks like a good hang out area before Nats games for people that are into that sort of thing.

Did anyone else find Side Yards much more lame than in previous years?

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News

smitty2k1 on Barre3 Studio Coming: Cornercopia is open every weekday for breakfast and lunch. They close fairly ear...
202_cyclist on Barre3 Studio Coming: I noticed another construction trailer this morning on the empty lot immediately...
jdc on Barre3 Studio Coming: I love Harry's, but competition is always good. That said, I wonder if this plac...
sameter on Barre3 Studio Coming: besides harrys being overpriced, it will do the neighborhood good to have compet...
Message Board (beta)

Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O K ST SE   BURGLARY
Burglary Two
 01/13/18
1000 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/11/18
500 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 01/09/18
900 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/07/18
100 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/04/18
400 B/O M ST SE   THEFT
Shoplifting
 01/02/18
UNIT B/O K ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/31/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/19/17

Recent Issued Building Permits Archive  
1100 2ND PL SE   
12/21/17 
CAPPER CARROLLSBURG VENTURE LLC / null
P1802299 / SUPPLEMENTAL
1331 2ND ST SE   
12/22/17 
DC WATER / DAVE LEVINE
AH1800369 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 DC Water, Corman Construction 301-343-5417. TO EXCLUDE LEGAL HOLIDAYS.
1331 4TH ST SE CU   
12/27/17 
FC 1331 LLC / GARY BRENT; N/A
SG1800119 / CONSTRUCTION
Install 1 illuminated blade sign and 7 non-illuminated window vinyl signs - CHLOE BY HAIDAR KAROUM
   
12/28/17 
FC 1331 LLC / BEN BEDDO
TL1700205 / CONSTRUCTION
New Tenant Layout for restaurant
1300 4TH ST SE   
01/05/18 
FORREST CITY WASHINGTON / GEORGE ARTHUR KING
SB1800091 / CONSTRUCTION
To abandon 18 6 inch diameter 80 foot deep dewatering wells and 4 2 inch diameter 50 feet deep observation wells per the DOEE regulations
1346 4TH ST SE   
01/12/18 
ALAN OWINGS / ROBERT HENRY
AH1800415 / CONSTRUCTION
After Hours Permit for 1 / 15 / 18 from 7AM to 7PM to perform concrete operations, framing, operations, and utility operations.
2 I ST SE   
12/20/17 
CRESCENT CAPITAL VIEW, LLC N/A / ERICKA CLARK
AH1800359 / CONSTRUCTION
Place and finish concrete. Minimal noise impact, and required for reduction on impact to traffic.
411 I ST SE   
12/27/17 
ABIGAIL A SMITH / ROBERT D. JOHNSTON
E1802679 / SUPPLEMENTAL
337 L ST SE   
12/22/17 
JENNIFER LANCASTER / null
E1802602 / SUPPLEMENTAL
   
01/11/18 
JENNIFER LANCASTER / BJORN FALK
SOL1800005 / CONSTRUCTION
Installation of a 3.6kW solar PV system. Roof Mounted, 10 panels
300 M ST SE STE# 400   
01/03/18 
FEDERAL CENTER LP / SAM HOLLEN
B1803531 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE CONFERENCE ROOM. PARTITIONS, CEILING, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 680 SQUARE FEET. CACI SUITE 400
25 POTOMAC AVE SE DOCK 79   
01/11/18 
RIVERFRONT HOLDINGS I LLC / null
P1802701 / SUPPLEMENTAL
227 TINGEY ST SE   
12/29/17 
JW CAPITAL PARTNERS / MELISSA DIAZ
FD1700126 / CONSTRUCTION
Parcel L1- Foundation to Grade permit for the new construction on an 11 story full service hotel building with restaurant and retail.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.