Since January, 2003
            
 Page Through from Before to After

It took a while for the weather and the calendar to successfully dovetail, but on Sunday the JDLand Camera finally got a look at the new plaza now nestled between Diamond Teague Park and Dock 79, as well as the extension of the Anacostia Riverwalk westward. (I missed out on the fountains, though.)
Once The Salt Line and All-Purpose open in their spots next year, and baseball fans figure out that there's a spot to hang out on the stadium's southeastern side (with handy built-in tables to eat carryout pizza at), this may become a pretty activated location. Especially in comparison to what it looked like 11 years ago.
Comments (23)
   
 
 More About Florida Rock

JDLand.com Home

Comments

202_cyclist says: (10/19/16 3:36 PM)
My wife and I walked over there on Sunday afternoon. The public spaces of this site are very nice. On the western side of this, towards the proposed Bardo site, there is quite a bit of space. It would be nice if the Capitol Riverfront BID sponsored some kind of activity or seasonal events there, like a Saturday farmer's market, etc...

I can only imagine how nice this location will be once the outside dining opens.


202_cyclist says: (10/19/16 3:38 PM)
Those photos would have looked even better if the Nationals were still playing now...


RMP says: (10/19/16 3:39 PM)
Great pictures. I also checked this out last weekend. Nice space. Dock 79 seemed completely deserted at the time. We could see pretty clearly into a bunch of units facing the river and it didn't look like any of them were occupied. I guess it only started move-ins a couple months ago so maybe it's still pretty empty.


SWag says: (10/19/16 3:46 PM)
Happy to have the new addition, but that brown surface looks horrible...


JD says: (10/19/16 3:50 PM)
There will also be prime seating for watching the Douglass Bridge construction/demolition.



Chaifetz10 says: (10/19/16 3:54 PM)
@202: Dock79 is still building out the dog park and volley ball courts. Landscaping just went in yesterday and they're on track to have them completed in the next few weeks. Look for the construction fence to come down soon after.

@RMP: Move ins are happening almost on a daily basis. It appears that most have been on the South half of the building as only see a few people on the North end of the court yard from our unit. Construction crews are still finishing the rooftop deck so it's still not open to residents... and I can see cleaning crews on some of the top floors getting units ready for move ins as well.


walt says: (10/19/16 4:26 PM)
Those seats look like prime viewing for bands on a barge! We need a Barge Band ASAP!


CJBabyDaddy says: (10/19/16 10:16 PM)
If you know any barge bands auditioning to fill an inexperienced kazoo virtuoso vacancy, I can give you my agent's contact info to pass along.


G Street says: (10/20/16 2:00 PM)
Like the yellow *thrones* in the park.


dcgent says: (10/20/16 3:42 PM)
Had a long talk with a Bardo bartender last weekend. Those are its fermentation tanks farther down near the bridge. They're still quite confident of moving into that space by spring time--despite some roadblocks--and I guess they can brew beer there in any case? They say the developer doesn't want to do that third site until the old bridge is own/new is up, so they think they could have a cool beergarden site for 2-5 years. might add a pizza oven outside for slices, etc though the new pizza place is there. We'll see if they can pull it off.


202_cyclist says: (10/23/16 2:29 PM)
I predict another JD Land update soon.


JD says: (10/23/16 9:08 PM)
Nah, I was just filling in some holes this morning and testing my new camera some more.

But maybe some tidbits are in the offing.


E. Masquinongy says: (10/24/16 8:42 AM)
Regarding the Douglass Bridge demo, when will that start?


JD says: (10/24/16 9:04 AM)
They haven't even awarded the design/build contract yet for the Douglass Bridge. I can't imagine it's anything less than a year away.


NavyYahd says: (10/26/16 2:00 PM)
Does anyone know what the plan is with what appears to be landscaping in the lot across from Park Chelsea?


202_cyclist says: (10/27/16 12:09 PM)
Construction is definitely underway for the new DC Water and Sewer Authority headquarters. I saw that a barrier was installed around the perimeter of the construction and a construction crew was remove the current concrete and pavement at the site.


jdc says: (10/27/16 3:30 PM)
I've said it for other parts of the area, but turning the lower 1st St. corridor into something other than the dump it is will have a HUGE impact on JD Land.


JD says: (10/28/16 3:36 PM)
Did not really intend to go quiet this week, but gears are kind of shifting in Mr. JDLand's treatment, and so my focus is elsewhere right now as we try to get everything lined up. (He's still feeling pretty good, though.)


202_cyclist says: (10/28/16 4:38 PM)
Our thoughts are with Mr. JD Land.


JNB says: (11/1/16 10:48 AM)
Prayers for your family.


jdc says: (11/1/16 12:58 PM)
Paper signage on doors of Homewood Suites says "coming soon".


202_cyclist says: (11/3/16 2:46 PM)
Of possible interest -- this was sent on the Capitol Hill listserve last week. I'll be attending this meeting.

===================================================================

The DC Office of Planning (OP) is amending the District’s Comprehensive Plan, a 20-year framework that guides future growth and development in the city and shapes the places we live, work, shop, and play. OP launched the second amendment cycle to the Comprehensive Plan this year to ensure that the Plan remains responsive to the needs of the community.

Your ideas are essential to a successful amendment process. Between October 19th and November 14th, OP is hosting a series of 7 community meetings. The meetings are organized geographically by Area Elements. Since the Comprehensive Plan is a 20-year plan, the Plan uses Area Elements instead of Wards since Ward boundaries can change every ten years. Please RSVP and check out the map to find a meeting closest to you. For more details about the Comprehensive Plan, Area Elements and the Amendment Process, please visit PlanDC.dc.gov and sign up for alerts.

Please join us for a meeting in your area element which includes Capitol Hill/Lower Anacostia/Near Southwest:
Date: Nov 3rd
Location: Jefferson Academy Middle School Academy, 801 7th Street SW
Nearest Metro: L’Enfant Plaza
Time: 6:00-8:30pm (presentation starts at 6:30)

Contact the DC Office of Planning at PlanDC@dc.gov or 202-442-7600 and follow us on Twitter at @OPinDC #PlanDC #DCCompPlan.

Come learn about the amendment process, share your ideas and help shape the future of the District!


dude says: (11/6/16 9:23 AM)
Walked over there last night for the first time since the new stuff was put in. Looks like a good hang out area before Nats games for people that are into that sort of thing.

Did anyone else find Side Yards much more lame than in previous years?

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Albi Opening This: Fences up around parcel H. They are going to change the ingress points to N plac...
jdc on Albi Opening This: At 37 L, windows are going in and tower crane is gone. At Chiller site next door...
dcgent on Albi Opening This: UrbanTurf looks at what's coming housing wise for the area https://dc.urbanturf....
Shogungts on Albi Opening This: @Jason - not sure if that is the plan, but it would be nice. I went by there th...
Jason on Albi Opening This: Any news on Half Street between M and N? I've heard that it's being turned into ...
202_cyclist on Retail Roundup: When parking is further reduced, people can take metro to one of the two station...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
900 B/O 11TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 02/19/20
900 B/O M ST SE   BURGLARY
Burglary Two
 02/19/20
1200 B/O HALF ST SE   ROBBERY  02/18/20
UNIT B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/15/20
400 B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  02/08/20
300 B/O TINGEY ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/02/20
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 02/01/20
600 B/O VIRGINIA AVE SE   ASSAULT WITH A DANGEROUS WEAPON  01/29/20
1300 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/27/20
1100 B/O 8TH ST SE   BURGLARY
Burglary Two
 01/25/20
303 VIRGINIA AVE SE   ROBBERY  01/25/20
400 B/O M ST SE   THEFT
Shoplifting
 01/23/20

Recent Issued Building Permits Archive  
909 4TH ST SE   
02/12/20 
MEREDITH FASCETT / null
E2004655 / SUPPLEMENTAL
1300 4TH ST SE APT 214   
02/03/20 
null / NA NA NA
EHOP20983190 / HOME OCCUPATION
1021 5TH ST SE   
02/13/20 
KEVIN WILLIAMS / KEVIN WILLIAMS; KEVIN WILLIAMS
B2005053 / CONSTRUCTION
Apply for building permit to have final closing inspection for permit #B1602481 & B1602513 per inspector inspection report since these permits has expired.
82 I ST SE   
01/27/20 
GDV EYE STREET LLC / null
P2003302 / SUPPLEMENTAL
   
01/27/20 
GDV EYE STREET LLC / null
M2001261 / SUPPLEMENTAL
150 I ST SE   
02/14/20 
SQUARE 737 LLC / JASON D DORRIS
AH2000818 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail, and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
250 M ST SE   
02/14/20 
SQUARE 769 LLC / null
P2003901 / SUPPLEMENTAL
800 NEW JERSEY AVE SE   
01/30/20 
NEW JERSEY AT H LLC / MICHELLE GABBITAS
AH2000649 / CONSTRUCTION
Manhole rehabilitation on New Jersey, 2nd St and M St SE to repair 3 existing sewer manholes in DDOT ROW. Work will all be done through existing manholes (trenchless) and include lining, rebuilding and bypass of existing manholes.
861 NEW JERSEY AVE SE   
01/28/20 
DISTRICT OF COLUMBIA / JANE MCCRAY
AH2000647 / CONSTRUCTION
Pepco contractor, W.A.Chester, will be splicing cable on 02 / 01 / 2020 - 02 / 28 / 2020, from 9 PM - 7 AM.
1275 NEW JERSEY AVE SE 20003   
02/14/20 
BROOKFIELD PROPOERTIES / TIM GOOD
AH2000849 / CONSTRUCTION
After hours to conduct work on 1275 New Jersey Ave SE on the upcoming holiday, Presidents Day, February 17, 2020. Operations would include below grade concrete and waterproofing activities with access limited to N Street. This permit would not include extended work hours beyond the normal 7am to 7pm period.
1275 NEW JERSEY AVE SE   
01/29/20 
US GOVERNMENT / null
E2004153 / SUPPLEMENTAL
   
01/29/20 
MILLER AND LONG / WILLIAM MOORE
AH2000659 / CONSTRUCTION
Afterhours to pour concrete with pump truck from 11pm to 7am from 2 / 6 / 2020 to 3 / 6 / 2020
   
01/30/20 
UNITED STATES OF AMERICA / VINCENT J. BROWNING; VINCENT J. BROWNING
P2003449 / SUPPLEMENTAL
1-Oil / Sand interceptor
   
01/30/20 
US GOVERNMENT / null
E2004202 / SUPPLEMENTAL
   
02/07/20 
MILLER AND LONG / WILLIAM MOORE
AH2000699 / CONSTRUCTION
Afterhours to put up towercrane with mobile crane saturday 2 / 8 / 2020 and 2 / 9 / 2020 from 5am to 1159pm
1299 NEW JERSEY AVE SE   
02/18/20 
FOREST CITY SEFC LLC / STRAUCHON; SEE BELOW
BCIV1800153 / CONSTRUCTION
Phase 1A BCIV Permit Description - BCIV 1800153 - The subject BCIV permit is for the Phase IA development of Quander St SE, N Pl SE, and 1-1 / 2 St SE within the overall Forest City, Yards West (FCYW) development area which emphasizes: pedestrian-focused public realm, optimized utility corridor, fully integrated SWM design, and complete street and vision zero design. The FCYW Phase IA is comprised...
1322 PATTERSON AVE SE   
02/13/20 
JOINT BASE ANACOSTIA BOLLING - UNITED STATES NAVAL OBSERVATORY SI / TONYA HARRIS; TONYA HARRIS; TBD
BCIV2000046 / CONSTRUCTION
***FEDERAL PROPERTY*** PROJECT WILL CONSIST OF DREDGING THE EXISTING RETENTION POND AND INSPECTING AND CLEANING THE OUTLET CONTROL STRUCTURE (S1) LOCATED ON THE UNITED STATES NAVAL OBSERVATORY TO REMOVE SEDIMENT ACCUMULATION. CONTRACTOR SHALL AVOID THE CLEARING OF VEGETATION ON POND EMBANKMENTS AND SURROUNDING AREAS SO AS TO KEEP RESTORATION AND REPLANTING TO A MINIMUM.
71 POTOMAC AVE SE   
02/13/20 
MRP REALTY / JAMES VANEGAS
AH2000681 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building.
   
02/19/20 
RIVERFRONT HOLDINGS II, LLC / JUSTIN BISHOP; JUSTIN BISHOP
SP1900054 / CONSTRUCTION
Construct a 680 sqft concrete swimming pool inside an existing waterproofed structural box on the 14th floor. All MEP, decking and fencing work by other trades under separate permits.
227 TINGEY ST SE   
02/12/20 
GONE YARD HOTEL OWNER LLC / BOB BIROONAK; BOB BIROONAK
SG2000048 / CONSTRUCTION
one double face illuminated blade sign
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.