Since January, 2003
            
 (a random before-and-after moment)
February 8, 2006
May 19, 2019 
Half at N, Looking North (see more)

It took a while for the weather and the calendar to successfully dovetail, but on Sunday the JDLand Camera finally got a look at the new plaza now nestled between Diamond Teague Park and Dock 79, as well as the extension of the Anacostia Riverwalk westward. (I missed out on the fountains, though.)
Once The Salt Line and All-Purpose open in their spots next year, and baseball fans figure out that there's a spot to hang out on the stadium's southeastern side (with handy built-in tables to eat carryout pizza at), this may become a pretty activated location. Especially in comparison to what it looked like 11 years ago.
Comments (23)
   
 
 More About Florida Rock

JDLand.com Home

Comments

202_cyclist says: (10/19/16 3:36 PM)
My wife and I walked over there on Sunday afternoon. The public spaces of this site are very nice. On the western side of this, towards the proposed Bardo site, there is quite a bit of space. It would be nice if the Capitol Riverfront BID sponsored some kind of activity or seasonal events there, like a Saturday farmer's market, etc...

I can only imagine how nice this location will be once the outside dining opens.


202_cyclist says: (10/19/16 3:38 PM)
Those photos would have looked even better if the Nationals were still playing now...


RMP says: (10/19/16 3:39 PM)
Great pictures. I also checked this out last weekend. Nice space. Dock 79 seemed completely deserted at the time. We could see pretty clearly into a bunch of units facing the river and it didn't look like any of them were occupied. I guess it only started move-ins a couple months ago so maybe it's still pretty empty.


SWag says: (10/19/16 3:46 PM)
Happy to have the new addition, but that brown surface looks horrible...


JD says: (10/19/16 3:50 PM)
There will also be prime seating for watching the Douglass Bridge construction/demolition.



Chaifetz10 says: (10/19/16 3:54 PM)
@202: Dock79 is still building out the dog park and volley ball courts. Landscaping just went in yesterday and they're on track to have them completed in the next few weeks. Look for the construction fence to come down soon after.

@RMP: Move ins are happening almost on a daily basis. It appears that most have been on the South half of the building as only see a few people on the North end of the court yard from our unit. Construction crews are still finishing the rooftop deck so it's still not open to residents... and I can see cleaning crews on some of the top floors getting units ready for move ins as well.


walt says: (10/19/16 4:26 PM)
Those seats look like prime viewing for bands on a barge! We need a Barge Band ASAP!


CJBabyDaddy says: (10/19/16 10:16 PM)
If you know any barge bands auditioning to fill an inexperienced kazoo virtuoso vacancy, I can give you my agent's contact info to pass along.


G Street says: (10/20/16 2:00 PM)
Like the yellow *thrones* in the park.


dcgent says: (10/20/16 3:42 PM)
Had a long talk with a Bardo bartender last weekend. Those are its fermentation tanks farther down near the bridge. They're still quite confident of moving into that space by spring time--despite some roadblocks--and I guess they can brew beer there in any case? They say the developer doesn't want to do that third site until the old bridge is own/new is up, so they think they could have a cool beergarden site for 2-5 years. might add a pizza oven outside for slices, etc though the new pizza place is there. We'll see if they can pull it off.


202_cyclist says: (10/23/16 2:29 PM)
I predict another JD Land update soon.


JD says: (10/23/16 9:08 PM)
Nah, I was just filling in some holes this morning and testing my new camera some more.

But maybe some tidbits are in the offing.


E. Masquinongy says: (10/24/16 8:42 AM)
Regarding the Douglass Bridge demo, when will that start?


JD says: (10/24/16 9:04 AM)
They haven't even awarded the design/build contract yet for the Douglass Bridge. I can't imagine it's anything less than a year away.


NavyYahd says: (10/26/16 2:00 PM)
Does anyone know what the plan is with what appears to be landscaping in the lot across from Park Chelsea?


202_cyclist says: (10/27/16 12:09 PM)
Construction is definitely underway for the new DC Water and Sewer Authority headquarters. I saw that a barrier was installed around the perimeter of the construction and a construction crew was remove the current concrete and pavement at the site.


jdc says: (10/27/16 3:30 PM)
I've said it for other parts of the area, but turning the lower 1st St. corridor into something other than the dump it is will have a HUGE impact on JD Land.


JD says: (10/28/16 3:36 PM)
Did not really intend to go quiet this week, but gears are kind of shifting in Mr. JDLand's treatment, and so my focus is elsewhere right now as we try to get everything lined up. (He's still feeling pretty good, though.)


202_cyclist says: (10/28/16 4:38 PM)
Our thoughts are with Mr. JD Land.


JNB says: (11/1/16 10:48 AM)
Prayers for your family.


jdc says: (11/1/16 12:58 PM)
Paper signage on doors of Homewood Suites says "coming soon".


202_cyclist says: (11/3/16 2:46 PM)
Of possible interest -- this was sent on the Capitol Hill listserve last week. I'll be attending this meeting.

===================================================================

The DC Office of Planning (OP) is amending the District’s Comprehensive Plan, a 20-year framework that guides future growth and development in the city and shapes the places we live, work, shop, and play. OP launched the second amendment cycle to the Comprehensive Plan this year to ensure that the Plan remains responsive to the needs of the community.

Your ideas are essential to a successful amendment process. Between October 19th and November 14th, OP is hosting a series of 7 community meetings. The meetings are organized geographically by Area Elements. Since the Comprehensive Plan is a 20-year plan, the Plan uses Area Elements instead of Wards since Ward boundaries can change every ten years. Please RSVP and check out the map to find a meeting closest to you. For more details about the Comprehensive Plan, Area Elements and the Amendment Process, please visit PlanDC.dc.gov and sign up for alerts.

Please join us for a meeting in your area element which includes Capitol Hill/Lower Anacostia/Near Southwest:
Date: Nov 3rd
Location: Jefferson Academy Middle School Academy, 801 7th Street SW
Nearest Metro: L’Enfant Plaza
Time: 6:00-8:30pm (presentation starts at 6:30)

Contact the DC Office of Planning at PlanDC@dc.gov or 202-442-7600 and follow us on Twitter at @OPinDC #PlanDC #DCCompPlan.

Come learn about the amendment process, share your ideas and help shape the future of the District!


dude says: (11/6/16 9:23 AM)
Walked over there last night for the first time since the new stuff was put in. Looks like a good hang out area before Nats games for people that are into that sort of thing.

Did anyone else find Side Yards much more lame than in previous years?

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

bdj on Nom News: There’s some signs up on the Tishman Speyer development on 1st and K/I that name...
conngs0 on Nom News: The return of Congressional Cleaners if fantastic news! Same ownership and ever...
JD on Nom News: It will be the return of Congressional Cleaners (the place that used to be at Ca...
GarfieldPark on Nom News: Good news for I and NJ Ave residents: signs on door of I ST space has a dry clea...
conngs0 on Nom News: I agree that it's strange that the senior center appears untouched (perhaps work...
walt on Nom News: Anybody have an update on the reconstruction for the Senior Center? It's nice ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/23/19
1000 B/O 7TH ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 05/22/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/17/19
500 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/17/19
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 05/17/19
1100 SOUTH CAPITOL ST SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 05/16/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/15/19
300 K ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/14/19
70 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/12/19
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/11/19
200 B/O K ST SE   ROBBERY  05/11/19
300 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/08/19
1300 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/08/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 05/01/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/29/19
1500 B/O SOUTH CAPITOL ST   THEFT
Theft First Degree (theft From Building)
 04/26/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/25/19
300 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/25/19
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/24/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
04/30/19 
CBRE / HELEN M MAPPLEBECK
TL1900080 / CONSTRUCTION
First generation finish out of Suite #100 at Square 769N Building, first floor for a 1,374 SF hair salon
   
05/17/19 
CAPPER 769N CONDOMINIUM / WILLIAM J. ANDERSON
P1906344 / SUPPLEMENTAL
   
05/22/19 
HELEN M. MAPPLEBECK / HEE YEOL HWANG
E1907663 / SUPPLEMENTAL
   
05/22/19 
CBRE / DOMINIC E TOTARO
M1902700 / SUPPLEMENTAL
1331 4TH ST SE CU   
05/01/19 
FC 1331 LLC / BEN BEDDO; BEN BEDDO
SG1900282 / CONSTRUCTION
INSTALL WALL MOUNTED BLADE SIGN WITH EXTERNAL ILLUMINATION. SIGN DOES NOT ENCROACH PUBLIC SPACE.
   
05/09/19 
FC 1331 LLC / BEN BEDDO
B1908465 / CONSTRUCTION
INSTALLATION OF RESTAURANT SUMMER GARDEN WITHIN PROPERTY LINE.
1331 4TH ST SE R-2   
04/29/19 
FC 1331 LLC / ALAN W. CARTER
E1906870 / SUPPLEMENTAL
   
04/29/19 
FC 1331 LLC / ALAN W. CARTER
E1906871 / SUPPLEMENTAL
1017 4TH ST SE   
05/17/19 
MIKE MORAWSKI / KYLE YOST; KYLE YOST
SOL1901148 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
150 I ST SE   
05/21/19 
WILLIAM C SMITH CO / null
E1907650 / SUPPLEMENTAL
250 M ST SE   
05/20/19 
SWUARE 769 LLC / PATRICK B. MCATEER
P1906137 / SUPPLEMENTAL
   
05/20/19 
SQUARE 769 LLC / CHRISTOPHER J. PETRAKES
M1902543 / SUPPLEMENTAL
880 NEW JERSEY AVE SE   
04/29/19 
880 NEW JERSEY AVE LLC / null
M1902401 / SUPPLEMENTAL
   
05/02/19 
880 NEW JERSEY AVENUE LLC / null
M1902440 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 7TH FL 20590   
05/13/19 
JBG/FEDERAL CENTER LLC / null
P1906172 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 7TH 20590   
05/01/19 
JBG/ FEDERAL CENTER LIC / null
P1905855 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
05/02/19 
SQUARE 742, LLC / SAM HOLLEN; NA
B1909008 / CONSTRUCTION
INTERIOR RENOVATION TO 6TH FLOOR OFFICE SPACE. DEMISING PARTITIONS, FURNITURE, MECHANICAL , ELECTRICAL AND LIFE SAFETY. 980 SQUARE FEET. ALION SCIENCE AND TECHNOLOGY
1200 NEW JERSEY AVE SE 20590   
05/09/19 
JBG/FEDERAL CENTER LLC / CARLOS E. MONTES
P1906111 / SUPPLEMENTAL
79 POTOMAC AVE SE   
05/08/19 
RIVERFRONT HOLDINGS I LLC / null
E1907222 / SUPPLEMENTAL
227 TINGEY ST SE   
05/10/19 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
B1909472 / CONSTRUCTION
First Extension to B1801871, to Expire on 11 / 25 / 2019. Original Scope: Yards Parcel L-2. New 11-story mixed use building with residential, retail on ground level, and underground parking garage. TPR. 6-month extension of permit B1801871.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.