Since January, 2003
            
 Sliding from Before to After

With the Bixby now apparently targeting late fall for move-in dates*, it's time to look toward the next project in the Hope VI redevelopment of the old Capper/Carrollsburg public housing projects, and that's the 171-unit mixed-income apartment building planned for the north end of the block bounded by 2nd Place, 3rd, L, and M Streets, SE.
There had been chatter that the project (it's the one on the left side of the rendering) would get underway this summer, but alas, delays with permits and financing have pushed that date enough along the calendar that the DC Housing Authority had to file a request with the Zoning Commission for a six-month extension past what was already a two-year extension.
"Although financing has been secured for the project," the agency's letter to the ZC says, "the final building permit authorizing construction has not been issued yet, which is a condition to closing." There are also delays associated with the more wide-ranging reviews and coordination apparently inherent in being the first building to implement the shared stormwater management system that was designed as part of Canal Park.
The Zoning Commission granted the extension with almost no discussion on Monday night, probably at about the same time that ANC 6D was voting 6-0-0 to support the request. This means that Feb. 14, 2017 is now the date by which construction is required to begin.
The as-yet-unnamed building, which is currently referred to as the "Square 769N Residential project," will share the block with what is currently slated to be an office building by WC Smith. It will have 34 affordable units and about 4,000 square feet of retail that would face Canal Park and Il Parco.
This would be the fourth multi-unit building to be built as part of the Capper redevelopment, and I'll note that it is not the "Square 767" development that has had residents expressing concerns over a two-building (one condo, one affordable only) configuration. (There should be some zoning filings on that one coming Any Minute Now.)
If you are trying to envision exactly where Square 769N is, perhaps a graphic and/or sort-of-current-ish photo would be of some assistance.
* As apparently told to ANC 6D at Monday night's meeting, though I was not there to hear it with my own ears.
Comments (6)
   
 
 More About Development News

JDLand.com Home

Comments

jdc says: (9/14/16 8:52 AM)
Great news. So sad all of those lots have sat empty for so long, when there are so many people that would love to live there, whatever income level.


Ampersand says: (9/14/16 10:52 AM)
I've long thought it's strange to have an entire three-block stretch of empty lots between 2nd Pl and 3rd St, so it's good that this looks like it'll get moving soon. I wonder how the feel of the neighborhood will change as those blocks develop - right now, there is open space between the townhouses and Canal Park, but eventually that opens space will be closed off with pretty large buildings.


conngs0 says: (9/14/16 11:26 AM)
Glad to see progress (albeit incremental and glacial) is being made. I wonder if the empty lots next to Canal Park serve as more of a barrier in the neighborhood than the planned large buildings will. Either way, I agree with jdc that it seems like a lot folks wish to live in the area, so this is a good development.

Also, the Bixby looks pretty awesome. I'll be very interested to hear the early reviews once folks start to move in.


202_cyclist says: (9/14/16 1:17 PM)
Regarding the Bixby-- it looks like the new street between the Bixby and Van Ness elementary school is about to open onto M Street.


walt says: (9/14/16 6:15 PM)
Any idea on when the other blocks are slated for action? It's been a long time coming!


VelocityChris says: (9/14/16 8:20 PM)
Thank God! I've been waiting for those three blocks to fill in, it will make Canal Park much more of an oasis when you can sit there and not stare at parking lots with lots of weeds growing up! It will totally change the feel for that whole area for the better.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

VelocityChris on Wednesday Tidbits: 202, as much as I'd love that construction trailer being a sign of movement on t...
JNB on Hallo, Douglass Bridge: Hallelujah!!!!!!! https://www.facebook.com/edwardANC/photos/a.322002718410934/...
JD on Wednesday Tidbits: It's the Garrett.
202_cyclist on Wednesday Tidbits: JD-- I saw this in your listing of building permits. Is the the Garrett or is it...
202_cyclist on Wednesday Tidbits: JD-- any update on the movie theater?
AGH on Wednesday Tidbits: That is a bummer although not entirely unexpected. Now I will aim and cross fing...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1255 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 01/19/20
400 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/17/20
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/14/20
1100 B/O 1ST ST SE   BURGLARY
Burglary One
 01/12/20
100 B/O L ST SE   ROBBERY  01/08/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/08/20
1100 B/O 2ND PLACE SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/06/20
40 N ST SE   ROBBERY  01/05/20
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/03/20
139 N ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 01/02/20
100 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/02/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/31/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/30/19
UNIT B/O M ST SE   BURGLARY
Burglary Two
 12/30/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/29/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/19
500 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/28/19
700 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/28/19
UNIT B/O I ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 12/27/19
300 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/27/19
1220 HALF ST SE   BURGLARY
Burglary Two
 12/27/19
300 B/O WATER ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/26/19
900 B/O NEW JERSEY AVE SE   BURGLARY
Burglary Two
 12/25/19
2 I ST SE   THEFT
Theft 2nd Degree (all Other Larceny) - Highway/ Road/ Alley/ Street/ Sidewalk
 12/24/19

Recent Issued Building Permits Archive  
909 4TH ST SE   
12/30/19 
MEREDITH FASCETT / KYLE YOST
SOL2000550 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
1300 4TH ST SE 912   
01/07/20 
DEBORAH J ISRAEL / DORIS A MINOR; DORIS A MINOR
B2003615 / CONSTRUCTION
REPLACE KITCHEN CABINETS
900 5TH ST SE   
01/10/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / WILLIAM ANDERSON; WILLIAM ANDERSON
P2002846 / SUPPLEMENTAL
   
01/17/20 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / WILLIAM B. CRIST; WILLIAM B. CRIST
E2003759 / SUPPLEMENTAL
82 I ST SE   
01/15/20 
GDVC EYE ST LLC / MARK G. MILLS; MARK G. MILLS
E2003664 / SUPPLEMENTAL
150 I ST SE   
01/16/20 
SQUARE 737 LLC / JASON D DORRIS
AH2000499 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
415 I ST SE   
01/10/20 
MEGHAN E RILEY / DAEHO PARK; DAEHO PARK
P2002836 / SUPPLEMENTAL
300 M ST SE   
01/03/20 
FEDERAL CENTER LP / null
E2003217 / SUPPLEMENTAL
111 N ST SE   
01/17/20 
ALAN OWINGS / CRAIG KUBICZ
BCIV1900068 / CONSTRUCTION
The proposed construction on Parcel H consists of a new curb cut off of N Place, a guard house, and resurfacing of the eastern portion of the parking lot. The two existing storm inlets in the parking lot will be removed and replaced by a bioretention facility. DOEE SWMP No. 6343: N Place and First Street SE
861 NEW JERSEY AVE SE   
12/31/19 
CONSOLIDATED RAIL CORPQ / null
E2003162 / SUPPLEMENTAL
   
12/31/19 
DISTRICT OF COLUMBIA / JANE MCCRAY
AH2000399 / CONSTRUCTION
Pepco will be splicing cable at 861 New Jersey Avenue, SE, from 9PM to 7AM, Monday thru Friday.
   
01/03/20 
CSX TRANSPORTATION INC / SUSANA VAZQUEZ; JOHN MORIARTY & ASSOCIATES OF VIRGINIA LLC
TC2000014 / CONSTRUCTION
Tower Crane
1100 NEW JERSEY AVE SE 1ST FL   
01/06/20 
SQUARE 742 LLC / JAMES W. LASHER; JAMES W. LASHER
E2003296 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
12/30/19 
SQUARE 742 LLC / RYAN FITZGERALD; NEXIUS SOLUTIONS, INC.
AN2000023 / CONSTRUCTION
AT&T proposes to replace (3) existing antennas with (3) new antennas and install (3) new antennas.
   
01/02/20 
SQUARE 742 LLC C/O WCSMITH / PATRICIA J STAUB; CDH CONSTRUCTION INC
B2001972 / CONSTRUCTION
Provide Landlord Work (warm white shell) for Tenant buildout of 1827 SF.
   
01/07/20 
SQUARE 742 LLC / ;
P2002715 / SUPPLEMENTAL
   
01/08/20 
SQUARE 742 LLC / null
P2002765 / SUPPLEMENTAL
1275 NEW JERSEY AVE SE   
01/03/20 
MILLER AND LONG / WILLIAM MOORE; MILLER LONG
TC2000016 / CONSTRUCTION
towercrane for jobsite use 1 / 25 / 2020 to 1 / 25 / 2021
71 POTOMAC AVE SE   
01/15/20 
RIVERFRONT HOLDINGS I, LLC / null
E2003671 / SUPPLEMENTAL
   
01/17/20 
MRP REALTY / JAMES VANEGAS
AH2000410 / CONSTRUCTION
Perform interior and exterior construction activities. New construction 14-story new residential multi-family building. **No loud equipment is to be used until 9am on this day.
355 WATER ST SE   
12/30/19 
UNITED STATES OF AMERICA / KELSI EVANS
TN2000035 / CONSTRUCTION
1 40' x 80 tent
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.