Since January, 2003
            
 (a random before-and-after moment)
January 19, 2003
August 14, 2007
5th at Virginia, Looking South-Southeast (see more)

With the Bixby now apparently targeting late fall for move-in dates*, it's time to look toward the next project in the Hope VI redevelopment of the old Capper/Carrollsburg public housing projects, and that's the 171-unit mixed-income apartment building planned for the north end of the block bounded by 2nd Place, 3rd, L, and M Streets, SE.
There had been chatter that the project (it's the one on the left side of the rendering) would get underway this summer, but alas, delays with permits and financing have pushed that date enough along the calendar that the DC Housing Authority had to file a request with the Zoning Commission for a six-month extension past what was already a two-year extension.
"Although financing has been secured for the project," the agency's letter to the ZC says, "the final building permit authorizing construction has not been issued yet, which is a condition to closing." There are also delays associated with the more wide-ranging reviews and coordination apparently inherent in being the first building to implement the shared stormwater management system that was designed as part of Canal Park.
The Zoning Commission granted the extension with almost no discussion on Monday night, probably at about the same time that ANC 6D was voting 6-0-0 to support the request. This means that Feb. 14, 2017 is now the date by which construction is required to begin.
The as-yet-unnamed building, which is currently referred to as the "Square 769N Residential project," will share the block with what is currently slated to be an office building by WC Smith. It will have 34 affordable units and about 4,000 square feet of retail that would face Canal Park and Il Parco.
This would be the fourth multi-unit building to be built as part of the Capper redevelopment, and I'll note that it is not the "Square 767" development that has had residents expressing concerns over a two-building (one condo, one affordable only) configuration. (There should be some zoning filings on that one coming Any Minute Now.)
If you are trying to envision exactly where Square 769N is, perhaps a graphic and/or sort-of-current-ish photo would be of some assistance.
* As apparently told to ANC 6D at Monday night's meeting, though I was not there to hear it with my own ears.
Comments (6)
   
 
 More About Development News

JDLand.com Home

Comments

jdc says: (9/14/16 8:52 AM)
Great news. So sad all of those lots have sat empty for so long, when there are so many people that would love to live there, whatever income level.


Ampersand says: (9/14/16 10:52 AM)
I've long thought it's strange to have an entire three-block stretch of empty lots between 2nd Pl and 3rd St, so it's good that this looks like it'll get moving soon. I wonder how the feel of the neighborhood will change as those blocks develop - right now, there is open space between the townhouses and Canal Park, but eventually that opens space will be closed off with pretty large buildings.


conngs0 says: (9/14/16 11:26 AM)
Glad to see progress (albeit incremental and glacial) is being made. I wonder if the empty lots next to Canal Park serve as more of a barrier in the neighborhood than the planned large buildings will. Either way, I agree with jdc that it seems like a lot folks wish to live in the area, so this is a good development.

Also, the Bixby looks pretty awesome. I'll be very interested to hear the early reviews once folks start to move in.


202_cyclist says: (9/14/16 1:17 PM)
Regarding the Bixby-- it looks like the new street between the Bixby and Van Ness elementary school is about to open onto M Street.


walt says: (9/14/16 6:15 PM)
Any idea on when the other blocks are slated for action? It's been a long time coming!


VelocityChris says: (9/14/16 8:20 PM)
Thank God! I've been waiting for those three blocks to fill in, it will make Canal Park much more of an oasis when you can sit there and not stare at parking lots with lots of weeds growing up! It will totally change the feel for that whole area for the better.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Top News

smitty2k1 on Barre3 Studio Coming: Cornercopia is open every weekday for breakfast and lunch. They close fairly ear...
202_cyclist on Barre3 Studio Coming: I noticed another construction trailer this morning on the empty lot immediately...
jdc on Barre3 Studio Coming: I love Harry's, but competition is always good. That said, I wonder if this plac...
sameter on Barre3 Studio Coming: besides harrys being overpriced, it will do the neighborhood good to have compet...
Message Board (beta)

  
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O K ST SE   BURGLARY
Burglary Two
 01/13/18
1000 B/O 4TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 01/11/18
500 B/O M ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 01/09/18
900 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/07/18
100 B/O I ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 01/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 01/04/18
400 B/O M ST SE   THEFT
Shoplifting
 01/02/18
UNIT B/O K ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/31/17
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/19/17

Recent Issued Building Permits Archive  
1100 2ND PL SE   
12/21/17 
CAPPER CARROLLSBURG VENTURE LLC / null
P1802299 / SUPPLEMENTAL
1331 2ND ST SE   
12/22/17 
DC WATER / DAVE LEVINE
AH1800369 / CONSTRUCTION
After Hours work for structure excavation and support for B1311474 DC Water, Corman Construction 301-343-5417. TO EXCLUDE LEGAL HOLIDAYS.
1331 4TH ST SE CU   
12/27/17 
FC 1331 LLC / GARY BRENT; N/A
SG1800119 / CONSTRUCTION
Install 1 illuminated blade sign and 7 non-illuminated window vinyl signs - CHLOE BY HAIDAR KAROUM
   
12/28/17 
FC 1331 LLC / BEN BEDDO
TL1700205 / CONSTRUCTION
New Tenant Layout for restaurant
1300 4TH ST SE   
01/05/18 
FORREST CITY WASHINGTON / GEORGE ARTHUR KING
SB1800091 / CONSTRUCTION
To abandon 18 6 inch diameter 80 foot deep dewatering wells and 4 2 inch diameter 50 feet deep observation wells per the DOEE regulations
1346 4TH ST SE   
01/12/18 
ALAN OWINGS / ROBERT HENRY
AH1800415 / CONSTRUCTION
After Hours Permit for 1 / 15 / 18 from 7AM to 7PM to perform concrete operations, framing, operations, and utility operations.
2 I ST SE   
12/20/17 
CRESCENT CAPITAL VIEW, LLC N/A / ERICKA CLARK
AH1800359 / CONSTRUCTION
Place and finish concrete. Minimal noise impact, and required for reduction on impact to traffic.
411 I ST SE   
12/27/17 
ABIGAIL A SMITH / ROBERT D. JOHNSTON
E1802679 / SUPPLEMENTAL
337 L ST SE   
12/22/17 
JENNIFER LANCASTER / null
E1802602 / SUPPLEMENTAL
   
01/11/18 
JENNIFER LANCASTER / BJORN FALK
SOL1800005 / CONSTRUCTION
Installation of a 3.6kW solar PV system. Roof Mounted, 10 panels
300 M ST SE STE# 400   
01/03/18 
FEDERAL CENTER LP / SAM HOLLEN
B1803531 / CONSTRUCTION
INTERIOR RENOVATION TO 4TH FLOOR OFFICE CONFERENCE ROOM. PARTITIONS, CEILING, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 680 SQUARE FEET. CACI SUITE 400
25 POTOMAC AVE SE DOCK 79   
01/11/18 
RIVERFRONT HOLDINGS I LLC / null
P1802701 / SUPPLEMENTAL
227 TINGEY ST SE   
12/29/17 
JW CAPITAL PARTNERS / MELISSA DIAZ
FD1700126 / CONSTRUCTION
Parcel L1- Foundation to Grade permit for the new construction on an 11 story full service hotel building with restaurant and retail.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.