Since January, 2003
            
 Sliding from Before to After

As part of the continuing reconstruction of the Virginia Avenue Tunnel, the intersection of 5th Street at Virginia Avenue will be closed starting Aug. 1 for three to four weeks for the installation of a temporary bridge deck.
The 6th Street exit ramp from eastbound I-695 will still be open during this closure, and traffic coming off the ramp will still be able to turn left to head north on 6th or continue straight on the one lane of Virginia Avenue open between 5th and 7th.
However, if you are south of Virginia Avenue and want to go north of the freeway, you will need to use either 3rd, 7th, 8th, or 11th Streets, SE. (The 7th Street intersection is expected to reopen from its own multi-week closure on Friday, July 29.)
Local traffic will still be allowed for the block of 5th Street north of K, including traffic to the Capper Seniors building.
See CSX's informational slides on this closure for additional details, or marvel at the wonder that is my own informational map above.
UPDATE, AUG. 2: The closure is officially underway.
Comments (28)
   
 
 More About CSX/Virginia Ave. Tunnel

JDLand.com Home

Comments

dude says: (7/28/16 1:12 PM)
Thanks for the heads up on this. I know a lot of people think CSX is the devil, but, these closures don't seem to really have a huge impact on things. Maybe I'm driving at times where any impact is less obvious though.


walt says: (7/28/16 1:31 PM)
I think this neighborhood is really well-situated with numerous access points to any roadways we need. I use this intersection almost daily, and I will simply take the 11th street entrance to 295 OR I will go over the Douglass Bridge instead. No big deal.


202_cyclist says: (7/29/16 8:08 AM)
Wow! Forest City knows how to throw a good party,


JD says: (7/29/16 10:46 AM)
The 7th and L Market was robbed at gunpoint last night:

Alert: 1D Robbery Gun of an Establishment, [7th & L Market ] at 7th & L Street SE. The lookout is for 3 black/males, 5'5" to 5'7" tall,Suspect (1) black revolver, black hoodie, whit shorts, gray sneakers, Suspect (2) gray hoodie, black shorts, Suspect (3) white hoodie, black shorts, black sneakers.
DO NOT TAKE ACTION CALL 911 W/ EVENT #I20160458400
Sent to 2nd District (PSA 201-208) Alert DC
Sent by MPD Cad #5279



JD says: (7/29/16 10:48 AM)
In somewhat better news, I am going to dig up some very (VERY) old code I wrote years ago for a bulletin board offering and repurpose it here. It won't be pretty, and it won't be very technologically advanced, but it'll be a step up from just yakking in the comment threads.



JES says: (7/29/16 12:06 PM)
...but i LIKE yakking in the comment threads


jdc says: (7/29/16 12:21 PM)
me too.


JD says: (7/29/16 12:57 PM)
That just means there's somewhere for everyone!

Okay, the earliest-of-early version of the JDLand Message Board is here:

link

All beta testers welcome. Be prepared for anything beyond the basics to not work. But I was in the groove to just get the rudimentary version up and running, so have at it.

(and the first thing I realize I need to add is emoji)


dude says: (7/29/16 6:08 PM)
Awesome!


Shogungts says: (7/30/16 10:26 AM)
Thanks JD!


JD says: (7/30/16 6:27 PM)
Note there is now a sneak peek on the main home page for message board posts.



JD says: (8/1/16 10:05 AM)
By the way, with access to the in-process permit database restored, I can update a few things:

* Parcel O does have a shoring permit but nothing more. (It looks like there's one shoring permit for both buildings, one foundation permit in process for both, and then two separate building applications in process.)

* JBG filed its shoring permit for Half Street last week.

* Jair Lynch has shoring and foundation permits in process for Monument Valley.

* Still no approved shoring permit for the NAB HQ or the attached residential building. (Shoring and foundation permits in process for both.)

* Shoring permit in process for 2 I St. (McDonald's)

There's also an early "civil"/infrastructure (water/sewer lines, etc.) permit application now in the pipeline for the Garrett.




jdc says: (8/1/16 11:03 AM)
btw Google Maps has updated the DMV area, and parts of DC are now 3D (though nothing with a federal presence, or so I'm told). JD Land is looking mighty different than before.


jdc says: (8/1/16 11:07 AM)
Actually, it seems everything east of canal park is 3D, including USDOT HQ.


JES says: (8/1/16 1:06 PM)
Glad to see Jair Lynch and JBG finally getting their asses in gear...


walt says: (8/1/16 2:47 PM)
The 3d Google maps is cool, thanks for sharing. Trees look pretty freaky though.


Shogungts says: (8/1/16 3:02 PM)
I like that the 3D view of the Nats stadium was taking during the prep/clean up of the Winter Classic


202_cyclist says: (8/1/16 3:18 PM)
The WBJ reports that WMATA is considering selling its downtown headquarters adjacent to the Verizon Center. This would be welcome news and could generate revenue for the agency for much-needed maintenance.

If WMATA sells its HQ and relocates, the Capitol Riverfront/Navy Yard would be an obvious choice, given its proximity to both the US DOT and DDOT headquarters.

link


JD says: (8/1/16 3:20 PM)
Wonder if they can still reneg on their plan to sell the Chiller site to MRP Realty.


202_cyclist says: (8/1/16 3:32 PM)
@JD: Good idea, since WMATA already owns that property. I would have to think, as nice as our neighborhood is, commercial property here is less than it is adjacent to the Verizon Ctr.


jdc says: (8/1/16 6:40 PM)
re: reneging on the sale of the chiller site: Jackson Graham building is 300,000SF ( link They want new site to be approx. 10% less SF. (same pdf). MRP Realty, which proposed the largest SF usage of the chiller property ( link is only building 163,000. Assuming MRP Realty isn't leaving anything on the table, the chiller plant site is just too small for WMATA's needs. Also, per the earlier pdf, they are looking at New Carrollton or Anacostia.


JD says: (8/2/16 2:09 PM)
Since he's now made it public, here's Mr. JDLand's announcement about his illness:

link



jdc says: (8/2/16 4:19 PM)
Continued well wishes to Mr. JDLand, and to JDLand herself.


walt says: (8/2/16 5:15 PM)
@202_cyclist,
Re: If WMATA sells its HQ and relocates, the Capitol Riverfront/Navy Yard would be an obvious choice, given its proximity to both the US DOT and DDOT headquarters.

Please no. this neighborhood doesn't have enough parking spots for all the WMATA employees!


202_cyclist says: (8/2/16 8:51 PM)
I don't want to upstage our erstwhile blogger but it appears there is equipment for soil testing on the vacant lot behind the charter school, next to the Circulator bus terminus.


JD says: (8/2/16 8:54 PM)
We talked about Akridge putting that site on the market, didn't we? I assume the soil boring is due diligence for a sale.

The permit for the boring is the top one on my permit list, right next to where I'm typing!


RMP says: (8/3/16 10:51 AM)
Is this Shake Shack announcement a surprise to everyone? Or was I just not paying attention? link


JD says: (8/3/16 10:53 AM)
That is indeed a surprise. Wow!

I shall post on it when I am back in position, later today.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Jscott280 on Inching from Quarantining: We recently discussed this (even though it is technically not in jdland) https:...
GarfieldPark on Inching from Quarantining: Very sad news about Tortilla Coast. Was solid Tex Mex and Coronas within walking...
JD on Inching from Quarantining: The few people I know who are working downtown say that it's brutal to try to fi...
conngs0 on Inching from Quarantining: jdc, it's going to be super interesting to see how the retail landscape changes....
jdc on Inching from Quarantining: By the time I regularly resume trips to JD Land, I wonder how much of the retail...
Jscott280 on Inching from Quarantining: https://www.bisnow.com/washington-dc/news/retail/barbershop-and-cocktail-bar-con...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1200 B/O HALF ST SE   THEFT
Theft 2nd Degree (theft From Building)
 07/13/20
900 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/09/20
1500 B/O 1ST ST SE   SEX ABUSE
Assault W/intent To Commit First Degree Sexual Abuse (force) (rape)
 07/08/20
400 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/06/20
1200 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/05/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/03/20
100 B/O O ST SE   ROBBERY  07/03/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/28/20
1200 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/25/20
1200 B/O SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 06/23/20
1200 B/O NEW JERSEY AVE SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 06/20/20
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/20
800 B/O SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/14/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-2   
06/18/20 
AP BOWER RETAIL LLC / MELISSA BRENT
SG2000335 / CONSTRUCTION
Install 1 illuminated wall sign & 1 illuminated blade sign - JENIs ICE CREAM
1150 5TH ST SE   
07/01/20 
DISTRICT OF COLUMBIA / CASEY STRINGER; TBD; TBD
BCIV2000113 / CONSTRUCTION
DGS PROJECT VAN NESS ELEMENTARY SCHOOL INITIAL PHASE FOR SITE DEMOLITION AND SITE CONSTRUCTION STAGING AREA FOR THE INSTALLATION OF TWO TEMPORARY SCHOOL TRAILERS TO BE SUBMITTED UNDER A SEPARATE PERMIT.
   
07/08/20 
DISTRICT OF COLUMBIA / CASEY STRINGER; NA
B2008863 / CONSTRUCTION
DGS PROJECT Minor interior classroom renovations at existing school
150 I ST SE   
07/02/20 
SQUARE 737 LLC / JASON D DORRIS
AH2001626 / CONSTRUCTION
Construction of a new 13 story apartment building with three below grade parking levels, 1st floor retail and amenity areas; 375 units and 181 parking spaces. To include mechanical, electrical, plumbing, elevators and structural work.
151 M ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI; NA
SB2000292 / CONSTRUCTION
WSP will be advancing approximately 50 soil borings to 30 feet, and an additional 8 borings to 4 feet via direct push. A water sample will be collected from 3 of the deep borings. All borings will be abandoned via bentonite grout mix. Investigation derived waste will be stored in DOT 55-gallon steel drums. Private and public utility locating will take place prior to the work beginning
250 M ST SE   
06/19/20 
WILLIAM C SMITH / null
E2008622 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
M2002834 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
P2006931 / SUPPLEMENTAL
   
07/10/20 
SQUARE 769 LLC / null
E2009225 / SUPPLEMENTAL
300 M ST SE   
06/18/20 
FEDERAL CENTER LP / null
E2008587 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
06/19/20 
CXS TRANSPORTATION INC / ;
P2006843 / SUPPLEMENTAL
   
06/22/20 
GREYSTAR GP LLC / KIM MITCHELL
B1903035 / CONSTRUCTION
The proposed project is three structures which are connected by a shared below-grade garage, which is one story deep on the east half of the site and two stories deep on the west half of the site. Two structures will be residential, with a total of 756 units, and the third will be a 225-key hotel. The west residential structure (Building 3) is planned to be 13 stories with ground and roof level am...
   
06/25/20 
CXS TRANSPORTATION INC / ;
P2006972 / SUPPLEMENTAL
1111 NEW JERSEY AVE SE   
06/24/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P2006938 / SUPPLEMENTAL
   
07/08/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
M2002985 / SUPPLEMENTAL
401 WATER ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI
SB2000294 / CONSTRUCTION
WSP will advance 23 soil borings to 30 feet and 8 additional borings to 4 feet using direct push. A groundwater sample will be collected from 2 of the deep borings by installing a temporary well. Soil boirngs will be abandoned with bentonite / grout mix. IDW will be stored for disposal in DOT 55-gallon drums. A private and public utility mark out will be completed priot to starting intrusive w...
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.