Since January, 2003
            
 (a random before-and-after moment)
April 4, 2005
April 14, 2018
New Jersey at K, Looking South (see more)

Another construction project is now confirmed to be starting soon, with the announcement earlier this month that Skanska has signed a $60 million contract to build the new DC Water headquarters on the banks of the Anacostia River.
For those who haven't been following along, the new building will be built as a "surround" to the existing red-brick O Street Pumping Station (no, not the historic Main Pumping Station).
Skanska's press release says that construction will begin this year, and is slated for completion in late 2017.
The Anacostia Riverwalk Trail bridge between the Yards Park and Diamond Teague Park will offer a prime viewing location for the construction, as you can see in the latest renderings passed along with the announcement (and I've included one of my shots of the existing O Street building for those who need refreshing).
This is the second office project that Skanska currently has in the neighborhood, as it is building the on-spec 99 M office building a few blocks to the north.
Comments (14)
   
 
 More About Development News

JDLand.com Home

Comments

jdc says: (7/19/16 9:33 AM)
Game changer. That entire area is such an eyesore.


JES says: (7/19/16 9:59 AM)
Wish there was a way to block this from starting until they move their stupid trucks off the theater site first...


dude says: (7/19/16 10:55 AM)
@jdc If they can clean up the tons and tons of trash on the water at that spot it'll also help.


JD says: (7/19/16 10:57 AM)
I will miss the twisted staircase down to the water, though.


202_cyclist says: (7/19/16 11:14 AM)
This is a great looking modern building. It is a nice change from all of the 10-story square boxes that usually get built in DC.


walt says: (7/19/16 11:19 AM)
I hate to be a downer because the building is really beautiful and will add a lot to the area, but we've had 3 increases to our water bill in the past 2 years. Is there typically an analysis when rate hikes are being considered to determine whether they really need a building THIS fancy?
And I left my hose on overnight last week so now I'm going to have a huge bill! :(


GoNavy says: (7/19/16 12:22 PM)
@Walt I think maybe a majority of the cost savings can really come from effective contracting and buying of bulk materials for this. I doubt that the cost of this building has impact on water rates. Like 202 said I am very happy to see such a beautiful design for the waterfront especially considering the eyesore there now. Now lets DO hope for no cost overruns or delays!


JES says: (7/19/16 2:40 PM)
Also, breaking ground this year and finished by next year? Seems awfully optimistically fast.


JD says: (7/19/16 2:42 PM)
It's just a surround, so little excavation, and only six-ish stories tall. 17 months to do that doesn't seem impossible.


conngs0 says: (7/19/16 3:22 PM)
Super excited for this building as well. I think the modern-looking HQ next to the historic pumping station will be a great contrast. However, JES is absolutely correct that DC Water shouldn't get their shiny new building until they vacate the theater site.


202_cyclist says: (7/19/16 3:29 PM)
@JES:

As a wise man once said, steel and glass construction goes very quick.


Alex B. says: (7/20/16 9:19 AM)
"but we've had 3 increases to our water bill in the past 2 years. Is there typically an analysis when rate hikes are being considered to determine whether they really need a building THIS fancy?"

This isn't driving the rate hikes. The massive, needed, and legally required tunnel projects are driving the rate hikes.

Relocating DC Water's HQ from Blue Plains to somewhere else opens up more space in Blue Plains for stuff that can only happen there (e.g. sewage treatment). So that part makes sense.

Once you decide to move, where do you move to? Given that they're building on a site they already own, they don't have any land costs. That's a plus. They're also building for the longer term instead of leasing space - also a plus.

And also, just because the building looks fancy doesn't mean it's actually more expensive to either build or operate than something that might look more mundane.


MJM says: (7/20/16 10:57 AM)
Buy a DC Water Bond and use the interest payments to pay your water bill. Revenge investing.


Blue says: (7/21/16 6:29 AM)
MJM - GREAT idea! And I love the concept of revenge investing too!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

conngs0 on Transportation Study Meeting: JD, thanks for passing along the update on the Capper Seniors building. I suppo...
jdc on Transportation Study Meeting: @RMP - in what manner? Nothing special, or no one went?
RMP on Transportation Study Meeting: Luluemon Grand Opening Weekend seems like it was a total bust.
202_cyclist on Transportation Study Meeting: With “Vice” opening in theaters soon, which movies and tv shows have been filmed...
JD on Transportation Study Meeting: The Capitol Hill Corner blog says that demolition of the Capper Seniors building...
202_cyclist on Transportation Study Meeting: It looks like there has been significant construction for Dacha.
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 12/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 12/09/18
1100 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 12/08/18
900 B/O 1ST ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/06/18
UNIT B/O N ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 12/05/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 12/01/18
1200 B/O HALF ST SE   ROBBERY  11/30/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/28/18
700 B/O L ST SE   THEFT
Shoplifting
 11/26/18
1255 1ST ST SE   ASSAULT WITH A DANGEROUS WEAPON  11/25/18
1200 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/23/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/13/18
150 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 11/12/18
400 B/O M ST SE   THEFT FROM AUTO
Theft Of Motor Vehicle Parts Or Accessories
 11/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle) - Convenience Store
 11/11/18

Recent Issued Building Permits Archive  
1346 4TH ST SE   
12/07/18 
FC 1346 LLC / null
FB1900031 / SUPPLEMENTAL
1000 5TH ST SE   
11/16/18 
UNITED STATES OF AMERICA / BRANDON M WILSON
BP1900670 / POST CARD
2 I ST SE   
11/14/18 
MCDONALDS CORPORATION / JUSTIN BISHOP
SP1800022 / CONSTRUCTION
Construct a 614 sqft in-ground, concrete swimming pool. All MEP, decking, and fencing work to be done under separate permit.
10 I ST SE   
11/14/18 
CAPITOL HILL RACQUET CLUB / BOB BIROONAK; N/A
SG1900075 / CONSTRUCTION
revision to existing approved sign permit SG1900026 Change to the footer only
250 M ST SE   
11/28/18 
SQUARE 769 LLC. / CONOR LAW
BCIV1800147 / CONSTRUCTION
New construction of erosion and sediment controls, domestic water service, fire service, sanitary sewer service, storm sewer service, curb & gutter, street trees, misc. landscaping, sidewalk, storm water management.
   
12/05/18 
null
E1902214 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE STE# 420   
11/27/18 
SQUARE 742 LLC / JAMES W LASHER
E1901850 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
11/16/18 
SQUARE 742 LLC / IAN AND LEON COMMUN-ET LLC
B1901037 / CONSTRUCTION
EXISTING CONDITIONS TO BE DEMOLISHED AND NEW OFFICE SPACE BUILT TO TENANTS STANDARDS. OFFICE CONSISTS OF OPEN OFFICE AND PRIVATE OFFICES WITH SUPPORT AREAS. SUPPORT AREAS INCLUDE BREAK ROOM / PRODUCTION ROOM COMBINATION, SERVER ROOM WITH DEDICATED A / C, MOTHERS / WELLNESS ROOM AND CONFERENCING.
   
11/20/18 
SQUARE 742 LLC / null
E1901715 / SUPPLEMENTAL
   
11/26/18 
SQUARE 742 LLC / null
P1901600 / SUPPLEMENTAL
   
11/26/18 
SQUARE 742 LLC / null
M1900652 / SUPPLEMENTAL
   
11/29/18 
SQUARE 742 LLC / JOE SAFFER
P1901753 / SUPPLEMENTAL
   
12/04/18 
SQUARE 742 LLC / PAUL WHITLEY
AN1900004 / CONSTRUCTION
This project consists on installing (9)proposed antennas , RRU's, and hybrid cables on an existing building, and removing (9) existing antennas, RRU's, TMA's, and hybrid cables.
   
12/05/18 
SQUARE 742 LLC / JOHN M. GIUSEPPE
B1900960 / CONSTRUCTION
renovations to 3rd floor office space SUITE 300 NATIONAL ASSOCIATION OF AREA AGENCIES ON AGING as shown on the electronically submitted mech., plumb., elect., fire protection, demolition, and architectural dwgs. Interior work only. No change in use. NO structural work involved. 7000 sf. **LEVEL 2 ALTERATION, DEMOLITION
125 O ST SE 2-6FL   
11/28/18 
DISTRICT OF COLUMBIA / ANDREW KLEIN 2408991526
E1901923 / SUPPLEMENTAL
125 O ST SE   
11/14/18 
DISTRICT OF COLUMBIA / CARL LAVENDT 2408821268
E1901525 / SUPPLEMENTAL
   
11/27/18 
DISTRICT OF COLUMBIA / MICHAEL P. LYONS
E1901853 / SUPPLEMENTAL
   
11/27/18 
DISTRICT OF COLUMBIA / WILLIAM H. JONES
E1901854 / SUPPLEMENTAL
   
11/29/18 
DISTRICT OF COLUMBIA / WESLEY R. DAVIS
E1901951 / SUPPLEMENTAL
   
11/29/18 
DISTRICT OF COLUMBIA / null
P1901748 / SUPPLEMENTAL
79 POTOMAC AVE SE   
11/27/18 
RIVERFRONT HOLDINGS LLC / null
AH1900270 / CONSTRUCTION
AFTER HOURS 7PM TO 7AM FINAL CONNECTION OF RELOCATED 8” SANITARY LINE
71 POTOMAC AVE SE   
11/26/18 
RIVERFRONT HOLDINGS I LLC / JUSTIN BELLOW
B1804337 / CONSTRUCTION
New 264-Unit 13-Stories Apartment House
   
12/03/18 
RIVERFRONT PROPERTIES LLC / null
P1901813 / SUPPLEMENTAL
300 TINGEY ST SE STE# 140   
11/13/18 
FC BOILERMAKER LLC / ANTHONY DIRENZO
E1901464 / SUPPLEMENTAL
227 TINGEY ST SE   
11/30/18 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
AH1900285 / CONSTRUCTION
Yards Parcel L-2. Afterhours permit for the purpose of installing precast concrete façade panels. Work to take place 7PM to 7AM, 12 / 5 / 2018 to 1 / 5 / 2019.
300 TINGEY ST SE   
11/16/18 
FC BOILERMAKER LLC / ANTHONY L HARRISON
E1901597 / SUPPLEMENTAL
   
12/04/18 
FC BOILERMAKER LLC / STEPHEN ADAMS 2403042373
E1902120 / SUPPLEMENTAL
   
12/06/18 
FC BOILERMAKER LLC / GARY BRENT; N/A
SG1900027 / CONSTRUCTION
Install 1 illuminated edge-lit wall logo sign, 1 illuminated halo-lit letter sign, 1 double-sided push thru edge-lit blade sign - LULULEMON
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.