Since January, 2003
            
 (a random before-and-after moment)
January 19, 2003
October 16, 2016
Van at M, Looking East-Northeast (see more)

Another construction project is now confirmed to be starting soon, with the announcement earlier this month that Skanska has signed a $60 million contract to build the new DC Water headquarters on the banks of the Anacostia River.
For those who haven't been following along, the new building will be built as a "surround" to the existing red-brick O Street Pumping Station (no, not the historic Main Pumping Station).
Skanska's press release says that construction will begin this year, and is slated for completion in late 2017.
The Anacostia Riverwalk Trail bridge between the Yards Park and Diamond Teague Park will offer a prime viewing location for the construction, as you can see in the latest renderings passed along with the announcement (and I've included one of my shots of the existing O Street building for those who need refreshing).
This is the second office project that Skanska currently has in the neighborhood, as it is building the on-spec 99 M office building a few blocks to the north.
Comments (14)
   
 
 More About Development News

JDLand.com Home

Comments

jdc says: (7/19/16 9:33 AM)
Game changer. That entire area is such an eyesore.


JES says: (7/19/16 9:59 AM)
Wish there was a way to block this from starting until they move their stupid trucks off the theater site first...


dude says: (7/19/16 10:55 AM)
@jdc If they can clean up the tons and tons of trash on the water at that spot it'll also help.


JD says: (7/19/16 10:57 AM)
I will miss the twisted staircase down to the water, though.


202_cyclist says: (7/19/16 11:14 AM)
This is a great looking modern building. It is a nice change from all of the 10-story square boxes that usually get built in DC.


walt says: (7/19/16 11:19 AM)
I hate to be a downer because the building is really beautiful and will add a lot to the area, but we've had 3 increases to our water bill in the past 2 years. Is there typically an analysis when rate hikes are being considered to determine whether they really need a building THIS fancy?
And I left my hose on overnight last week so now I'm going to have a huge bill! :(


GoNavy says: (7/19/16 12:22 PM)
@Walt I think maybe a majority of the cost savings can really come from effective contracting and buying of bulk materials for this. I doubt that the cost of this building has impact on water rates. Like 202 said I am very happy to see such a beautiful design for the waterfront especially considering the eyesore there now. Now lets DO hope for no cost overruns or delays!


JES says: (7/19/16 2:40 PM)
Also, breaking ground this year and finished by next year? Seems awfully optimistically fast.


JD says: (7/19/16 2:42 PM)
It's just a surround, so little excavation, and only six-ish stories tall. 17 months to do that doesn't seem impossible.


conngs0 says: (7/19/16 3:22 PM)
Super excited for this building as well. I think the modern-looking HQ next to the historic pumping station will be a great contrast. However, JES is absolutely correct that DC Water shouldn't get their shiny new building until they vacate the theater site.


202_cyclist says: (7/19/16 3:29 PM)
@JES:

As a wise man once said, steel and glass construction goes very quick.


Alex B. says: (7/20/16 9:19 AM)
"but we've had 3 increases to our water bill in the past 2 years. Is there typically an analysis when rate hikes are being considered to determine whether they really need a building THIS fancy?"

This isn't driving the rate hikes. The massive, needed, and legally required tunnel projects are driving the rate hikes.

Relocating DC Water's HQ from Blue Plains to somewhere else opens up more space in Blue Plains for stuff that can only happen there (e.g. sewage treatment). So that part makes sense.

Once you decide to move, where do you move to? Given that they're building on a site they already own, they don't have any land costs. That's a plus. They're also building for the longer term instead of leasing space - also a plus.

And also, just because the building looks fancy doesn't mean it's actually more expensive to either build or operate than something that might look more mundane.


MJM says: (7/20/16 10:57 AM)
Buy a DC Water Bond and use the interest payments to pay your water bill. Revenge investing.


Blue says: (7/21/16 6:29 AM)
MJM - GREAT idea! And I love the concept of revenge investing too!

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

bdj on Nom News: There’s some signs up on the Tishman Speyer development on 1st and K/I that name...
conngs0 on Nom News: The return of Congressional Cleaners if fantastic news! Same ownership and ever...
JD on Nom News: It will be the return of Congressional Cleaners (the place that used to be at Ca...
GarfieldPark on Nom News: Good news for I and NJ Ave residents: signs on door of I ST space has a dry clea...
conngs0 on Nom News: I agree that it's strange that the senior center appears untouched (perhaps work...
walt on Nom News: Anybody have an update on the reconstruction for the Senior Center? It's nice ...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 05/25/19
300 B/O TINGEY ST SE   SEX ABUSE
2nd Degree Sex Abuse-threats
 05/25/19
1000 B/O 1ST ST SE   BURGLARY
Burglary Two
 05/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/23/19
1000 B/O 7TH ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 05/22/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/17/19
500 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/17/19
400 B/O M ST SE   THEFT
Theft 2nd Degree - Felony (all Other Larceny)
 05/17/19
1100 SOUTH CAPITOL ST SE   ROBBERY
Assault W/i To Commit Robbery (simple Assault)
 05/16/19
1000 B/O NEW JERSEY AVE SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/15/19
300 K ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/14/19
70 B/O I ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/12/19
1100 B/O 1ST ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/11/19
200 B/O K ST SE   ROBBERY  05/11/19
300 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/10/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/08/19
1300 B/O 4TH ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/08/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 05/01/19
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 04/29/19
1500 B/O SOUTH CAPITOL ST   THEFT
Theft First Degree (theft From Building)
 04/26/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
04/30/19 
CBRE / HELEN M MAPPLEBECK
TL1900080 / CONSTRUCTION
First generation finish out of Suite #100 at Square 769N Building, first floor for a 1,374 SF hair salon
   
05/17/19 
CAPPER 769N CONDOMINIUM / WILLIAM J. ANDERSON
P1906344 / SUPPLEMENTAL
   
05/22/19 
HELEN M. MAPPLEBECK / HEE YEOL HWANG
E1907663 / SUPPLEMENTAL
   
05/22/19 
CBRE / DOMINIC E TOTARO
M1902700 / SUPPLEMENTAL
1331 4TH ST SE CU   
05/01/19 
FC 1331 LLC / BEN BEDDO; BEN BEDDO
SG1900282 / CONSTRUCTION
INSTALL WALL MOUNTED BLADE SIGN WITH EXTERNAL ILLUMINATION. SIGN DOES NOT ENCROACH PUBLIC SPACE.
   
05/09/19 
FC 1331 LLC / BEN BEDDO
B1908465 / CONSTRUCTION
INSTALLATION OF RESTAURANT SUMMER GARDEN WITHIN PROPERTY LINE.
1331 4TH ST SE R-2   
04/29/19 
FC 1331 LLC / ALAN W. CARTER
E1906870 / SUPPLEMENTAL
   
04/29/19 
FC 1331 LLC / ALAN W. CARTER
E1906871 / SUPPLEMENTAL
1017 4TH ST SE   
05/17/19 
MIKE MORAWSKI / KYLE YOST; KYLE YOST
SOL1901148 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof
150 I ST SE   
05/21/19 
WILLIAM C SMITH CO / null
E1907650 / SUPPLEMENTAL
250 M ST SE   
05/20/19 
SWUARE 769 LLC / PATRICK B. MCATEER
P1906137 / SUPPLEMENTAL
   
05/20/19 
SQUARE 769 LLC / CHRISTOPHER J. PETRAKES
M1902543 / SUPPLEMENTAL
880 NEW JERSEY AVE SE   
04/29/19 
880 NEW JERSEY AVE LLC / null
M1902401 / SUPPLEMENTAL
   
05/02/19 
880 NEW JERSEY AVENUE LLC / null
M1902440 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 7TH FL 20590   
05/13/19 
JBG/FEDERAL CENTER LLC / null
P1906172 / SUPPLEMENTAL
1200 NEW JERSEY AVE SE 7TH 20590   
05/01/19 
JBG/ FEDERAL CENTER LIC / null
P1905855 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
05/02/19 
SQUARE 742, LLC / SAM HOLLEN; NA
B1909008 / CONSTRUCTION
INTERIOR RENOVATION TO 6TH FLOOR OFFICE SPACE. DEMISING PARTITIONS, FURNITURE, MECHANICAL , ELECTRICAL AND LIFE SAFETY. 980 SQUARE FEET. ALION SCIENCE AND TECHNOLOGY
1200 NEW JERSEY AVE SE 20590   
05/09/19 
JBG/FEDERAL CENTER LLC / CARLOS E. MONTES
P1906111 / SUPPLEMENTAL
79 POTOMAC AVE SE   
05/08/19 
RIVERFRONT HOLDINGS I LLC / null
E1907222 / SUPPLEMENTAL
227 TINGEY ST SE   
05/10/19 
FOREST CITY WASHINGTON / DFM DEVELOPMENT SERVICES, LLC
B1909472 / CONSTRUCTION
First Extension to B1801871, to Expire on 11 / 25 / 2019. Original Scope: Yards Parcel L-2. New 11-story mixed use building with residential, retail on ground level, and underground parking garage. TPR. 6-month extension of permit B1801871.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.