Since January, 2003
            
 (a random before-and-after moment)
August 21, 2003
May 26, 2013
2nd (West) at K, Looking South-Southwest (see more)

With the 305-unit Dock 79 apartment building very close to completion, the developers of the site on the Anacostia River that us oldsters still refer to as Florida Rock have now filed with the Zoning Commission their plans* for the project's next phase, a 130-foot-tall 253-unit residential building with 12,500 square feet of retail at 71 Potomac Avenue.
There will be at least two levels of underground parking, with a third level being pondered "given the parking demands of [Nationals Park] and the pending soccer stadium." And although the building is not covered by the city's Inclusionary Zoning laws, the filing says that eight percent of the units will be set aside for households with incomes up to 80 percent of the Area Median Income.
The construction of this building will also bring the completion of "Florida Rock Alley," running between 71 Potomac and Dock 79 and providing another route for pedestrians to move between Potomac Avenue and the waterfront along with the access to parking and loading for both buildings. The waterfront Esplanade will also be extended along 71 Potomac's frontage.
The 12,500 square feet of retail is an increase the previously approved 5,600 square feet. In the filing statement, developers Florida Rock Properties and MRP Realty mention that "based on the success in leasing retail space in Dock 79, the Applicant is confident that there is a retail market along Potomac Avenue," and that "the desire for retailers to locate in this area has only increased" since the previous plans were approved in 2013.
The site plans are very helpful to not only understand where this Phase 2 building at 71 Potomac will be, but how the eventual third and fourth phases are dependent on the construction of the new Douglass Bridge and its accompanying traffic oval, and the demolition of the existing bridge. (The filing mentions DDOT's current estimated schedule of a notice to proceed on the new bridge in 2017 and completion in 2020, but We Shall See.)
There are a slew of renderings in the zoning packet, which of course I'm snagging (we'll call it a one-for-one exchange for all of the photos of mine they used in the site overview portion of the package!).
These plans will require ANC presentations and a vote and zoning hearings and building permits and financing, so don't pack your bags just yet.
*For those to whom such things matter, this is a second-stage PUD filing.
Comments (12)
   
 
 More About Development News

JDLand.com Home

Comments

202_cyclist says: (7/16/16 10:43 AM)
Thanks for the post. At 130 ft tall, this should have some spectacular views.

I think it is the FL Rock Alley--I noticed nice decorative overhead lights had been strung across this space. It should be a nice area when Dock 79 opens.


202_cyclist says: (7/16/16 10:49 AM)
I also like the solar panels above the dock in the rendering. Hopefully Forest City can do that with the Yards Park marina as well.


walt says: (7/16/16 3:43 PM)
image 7 looks strikingly like Velocity.


jdc says: (7/16/16 4:46 PM)
Doesn't look as nice on outside to me, IMO. I like the color palette of Dock 7.


dude says: (7/17/16 8:44 AM)
Looks fine, nothing special. Let's hope they build the larger garage. Can never have too much parking.


202_cyclist says: (7/17/16 9:43 AM)
Dude:

" Let's hope they build the larger garage. Can never have too much parking."

No offense but wrong, wrong, wrong. Much has been written about the adverse impacts of parking but abundant parking undermines transit ridership and walking/biking, significantly adds to the cost of housing, and ensures that the building is designed around accommodating vehicles rather than other aesthetic priorities.

link


dude says: (7/17/16 10:52 PM)
Oh right, people love riding metro.


RMP says: (7/18/16 8:10 AM)
I notice that Parcel O is now on the Highlighted Projects map. Look forward to following that progress.


jdc says: (7/18/16 8:36 AM)
I can imagine a future - maybe 2019/2020 - where the empty lots that plague JD Land are only the parcels around canal park and parcel A. Not that those aren't significant vacant land.


202_cyclist says: (7/18/16 10:54 AM)
@Dude-- I can't excuse the inexcusable with metro's performance.


FYI-- when I was running this morning, I noticed a needle in the vacant lot next to the charter school. Watch out if you are walking your dog there.


jdc says: (7/20/16 3:47 PM)
Does anyone see the office space or hotel in later phases not ever occurring, and instead it being changed to condos or apartments? I guess of the two, I think a hotel may be a bit more likely because of its proximity to the soccer stadium and Ft. McNair. But I cannot see office space really being a) needed or b) needed there.


jdc says: (7/20/16 3:49 PM)
I also see they're pulling the permit for the pool at Dock 79.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts
  

CJBabyDaddy on August Tidbit Roundup: @Smitty: JD’s Tingey Square link above reveals all. Think Times Square but with...
smitty2k1 on August Tidbit Roundup: So what's with Tingey Square? Just a new traffic pattern? It seems to be quite t...
RMP on August Tidbit Roundup: Work is progressing at Hatoba (formerly 100 montaditos) but to the untrained eye...
walt on August Tidbit Roundup: Well, I finally ate at El Bebe and loved their tacos.
GAK on Tidbits: WestHalf is now leasing and has floor plans and pricing posted on the website
GarfieldPark on Tidbits: DC Vedgefest was today @ Nats Park. A lot of people and a lot of vendors. Was de...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
150 B/O L ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 08/18/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/19
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/15/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/15/19
100 B/O M ST SE   THEFT
Theft First Degree (purse-snatching)
 08/14/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/14/19
500 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/14/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/12/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 08/06/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/06/19
800 B/O VIRGINIA AVE SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 08/05/19
UNIT B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/04/19
400 B/O M ST SE   THEFT
Shoplifting
 08/01/19
900 B/O 3RD ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/26/19
600 B/O M ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/25/19
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/25/19

Recent Issued Building Permits Archive  
1100 2ND PL SE   
08/06/19 
DC WATER / JEFF NOLD
AH1901095 / CONSTRUCTION
CCTV inspection of Sanitary Sewer sytem at the corner of 2nd Place and L Street SE.
808 3RD ST SE   
07/29/19 
LAURA R JENKINS / BRANDON K. VIERNES; BRANDON K. VIERNES
M1903669 / SUPPLEMENTAL
913 4TH ST SE   
08/07/19 
JANE SESSA / KYLE YOST; KYLE YOST
SOL1901388 / CONSTRUCTION
rooftop solar pv system, less than 4' above roof.
   
08/14/19 
JANE T SESSA / null
E1910482 / SUPPLEMENTAL
1331 4TH ST SE 719   
08/07/19 
null / NA NA NA
EHOP19936898 / HOME OCCUPATION
1346 4TH ST SE   
07/24/19 
FC 1346 HOLDCO I LLC / null
P1908097 / SUPPLEMENTAL
1346 4TH ST SE 20011   
08/16/19 
FC 1346 HOLDCO 1 LLC / null
E1910605 / SUPPLEMENTAL
312 K ST SE   
08/05/19 
HENRY LOWNDES MAURY TRUSTEES / null
E1910076 / SUPPLEMENTAL
   
08/07/19 
HENRY L MAURY / BJORN FALK; ANTHONY COLELLA
SOL1901686 / CONSTRUCTION
Install 6.54 solar PV system using 20 327-watt solar panels, roof mounted, with micro-inverters.
100 M ST SE   
07/29/19 
SQUARE 743 INC / KIM MITCHELL; MONUMENT REALITY
B1909745 / CONSTRUCTION
CONSTRUCTION OF OFFICE SPACE ON THE 7TH FLOOR - MULTI TENANT FLOOR IN AN EXISTING OFFICE BUILDING. THE SPACE IS IN SHELL CONDITION, NOT PREVIOUSLY OCCUPIED. THIS IS AN EXPANSION OF AN EXISTING TENANT ON THE 7TH FLOOR
   
08/06/19 
SQUARE 743 INC / PAUL THIEBERGER; PAUL THIEBERGER
P1908468 / SUPPLEMENTAL
   
08/16/19 
SQUARE 743 INC / BRIAN QUINN; NA
B1911537 / CONSTRUCTION
Interior renovation for new tenant in existing office space on partial area of the 9th floor.
300 M ST SE   
08/08/19 
FEDERAL CENTER LP / MIKE BOONE
AH1901148 / CONSTRUCTION
PEPCO-WO#15676746 / 02-ALLEN / CHESTER-CREWS WILL BE INSTALLING CABLE. 300 BLK M ST SE 400 BLK M ST SE 400 BLK TINGEY ST SE 1200 BLK 4TH ST SE THEY WILL BE TAKING PARKING LANE AND MIDDLE LANE M-F 11PM-7AM
800 NEW JERSEY AVE SE   
08/14/19 
NEW JERSEY AT H LLC / null
E1910458 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
08/07/19 
809-853 NEW JERSEY AVE ACQUISITION LLC / JOSEPH M MAGNOLIA; JOSEPH M MAGNOLIA
P1908508 / SUPPLEMENTAL
   
08/08/19 
GRAYSTAR GP 11,LLC / KIM MITCHELL
SH1900015 / CONSTRUCTION
Support of excavation for entire site for two below grade parking levels
   
08/14/19 
GRAYSTAR GP 11 LLC / MITCH A. PERMUY; MITCH A. PERMUY
E1910454 / SUPPLEMENTAL
   
08/14/19 
GRAYSTAR GP 11 LLC / MITCH A. PERMUY; MITCH A. PERMUY
E1910455 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
07/26/19 
SQUARE 742 LLC / WILLIAM SNODDY; TBD
B1911194 / CONSTRUCTION
Tenant Finish Out. Existing Condition to be demolished and new office space built to tenant's standards. Office consists of open office and private offices.
   
07/30/19 
SQUARE 742 LLC / null
P1908231 / SUPPLEMENTAL
   
08/06/19 
SQUARE 742 LLC / ;
P1908470 / SUPPLEMENTAL
   
08/06/19 
SQUARE 742 LLC / null
M1903804 / SUPPLEMENTAL
520 TINGEY ST SE   
08/12/19 
US GENERAL SERVICES ADMINISTRATION / JOHN WICKLIFFE; NA
TN1900153 / CONSTRUCTION
Install 100ft x 90ft Tent No Cooking, No Propane, No Stages, No Smoking Installed Aug 16, 2019 - Feb 9, 2020 Events Daily 8:00 am - 10:00 pm
227 TINGEY ST SE   
07/31/19 
UNITED STATES OF AMERICA / BILL SAUNDERS; BILL SAUNDERS
P1908289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.