Since January, 2003
            
 Sliding from Before to After

If you are wandering by the southeast corner of South Capitol and M Streets next week and are wondering about seeing a bunch of well-dressed VIPs wielding shovels, it's not a new job training program--it'll be a ceremonial groundbreaking for the new headquarters for the National Association of Broadcasters at One M Street SE, being developed by Monument Realty.
The real work of construction, I'm told, is slated to start later this summer, but the NAB bigwigs were apparently going to be gathering in DC for a board meeting this month and so will take the opportunity to mark the occasion.
(And of course there is no statutory requirement that ceremonial groundbreakings take place x number of days before or after the start of actual digging.)
This headquarters will be a 120,000-square-foot offering with about 4,800 square feet of ground floor retail, and is expected to open in 2018. NAB and Monument announced the deal in April of 2015, calling it the "culmination of a rigorous search for a location with easier access to Capitol Hill that will allow NAB to improve its advocacy efforts."
Monument also tells me that the current plan is to also start this summer on 10 Van Street, the NAB HQ's 163-unit residential sibling immediately to the south, which you can see here and on my One M/10 Van project page.
And the big news that I'm burying all the way down here is that Monument tells me that the decision has been made that 10 Van will be condos, with a mix of one-, two- and three-bedroom units as well as multi-level two-bedroom townhouses facing both Van and South Capitol.
Once it gets started, the NAB HQ would be the second office project under construction, joining Skanska's on-spec 99 M a couple of blocks to the east. The 10 Van project will become part of the long list of residential projects currently being built, and will be the second in this block of South Capitol Street, along with JBG's 290-unit rental building at 1244 South Capitol that is expected to be completed in 2017. These will also be the first projects to get underway in 2016, unless the Yards Parcel O condo and rental buildings get started first.
I guess we'll know for sure that NAB/10 Van construction is truly at hand when the surface parking lot there stops accepting Nats gameday parking....
Comments (8)
   
 
 More About Development News

JDLand.com Home

Comments

NavyYardGuy says: (6/15/16 3:02 PM)
Condos. We need more condos.

Great news JD.


dude says: (6/15/16 10:29 PM)
More cool looking buildings. And of course that awesome Public Storage.


ras92 says: (6/16/16 9:35 AM)
YAY CONDOS FINALLY!!!


conngs0 says: (6/16/16 10:24 AM)
Nice little influx of condo buildings coming into the neighborhood with this and the PN Hoffman project across from the Banfield and Vida that's supposed to get underway this summer.


jdc says: (6/17/16 8:25 AM)
Who would want to face S. Capitol? Not at all an attractive view from anything below maybe the 5th or 6th floor. That said, another big boon to this area of JDLand, and I cannot wait.


jdc says: (6/18/16 7:57 AM)
Between these 2 buildings and then 1244 South Capitol, the storage facility sticks out like a sore thumb....If indeed the parcel off I street becomes a self storage facility (where there is no better use of that land), I wonder if at some point this site will just be too attractive to remain this use and the owners (who owns it JD?) redevelop it into apartments or *gasp* condos?


jdc says: (6/18/16 8:03 AM)
And one last point: I wondering how much concern (and competition there will be) over filling in all of the retail near the stadium? 1244 S. Cap. will have 26,000 sf retail, 25 M St will have 20,000 sf retail, JBG Half St. will have 65,000 sf, and Half St. hole parcel is set for over 60,000 sf of retail. (Is there any empty retail at 55 M anymore?) That's 171,000 sf of retail in the next 2-3 years, NOT including any retail going up on 1st St as part of those office/residential/dedicated 7k retail buildings. For comparison, the size of an average Wal-Mart supercenter is 179,000 square feet.


JD says: (6/18/16 9:11 AM)
As for all the retail space, I wrote a post not all that long ago very similar to what you wrote, laying out all the retail space coming soon, and that it will be interesting to watch how long it takes, and what type of retail comes in. And hardly anyone commented on it, so I guess it's not very interesting. :)

No big developer owns the self storage between JBG and Monument's projects. Though I'm guessing that whoever does own it gets an awful lot of phone calls!

{Actually, now that I think about it, maybe the big breaking down of coming retail space was in a comment on a post. Trying to find it.}


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

CJ1 on Inching from Quarantining: Oh wow... I live at Ore82 and didn't know about any of this.
GarfieldPark on Inching from Quarantining: @JD: Apparently, ORE will be eliminating (or making them smaller) some of it's ...
JD on Inching from Quarantining: Some interesting design notes found in the approved building permit for the thre...
KEWEE on Inching from Quarantining: Jeni's Splendid Ice Creams is coming to the retail space located at The Bower co...
CJBabyDaddy on Inching from Quarantining: Serious workplace accident on the ground this morning at the Chemonics construct...
MJM on Inching from Quarantining: Welcome to the neighborhood Pivot Physical Therapy. Its located behind Sprint (w...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
400 B/O K ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 07/06/20
1200 B/O HALF ST SE   THEFT
Theft First Degree (all Other Larceny)
 07/05/20
100 B/O H ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/03/20
100 B/O O ST SE   ROBBERY  07/03/20
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/28/20
1200 B/O 1ST ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/25/20
1200 B/O SOUTH CAPITOL ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 06/23/20
1200 B/O NEW JERSEY AVE SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 06/20/20
1000 B/O 3RD PLACE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/20
800 B/O SOUTH CAPITOL ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/14/20
400 B/O M ST SE   THEFT
Shoplifting
 06/12/20
1000 B/O M ST SE   ROBBERY
Unarmed Carjacking
 06/09/20
UNIT B/O M ST SE   ASSAULT WITH A DANGEROUS WEAPON  06/07/20

Recent Issued Building Permits Archive  
1300 4TH ST SE RU-2   
06/18/20 
AP BOWER RETAIL LLC / MELISSA BRENT
SG2000335 / CONSTRUCTION
Install 1 illuminated wall sign & 1 illuminated blade sign - JENIs ICE CREAM
150 I ST SE   
06/15/20 
SQUARE 737 LLC / BOB BIROONAK; NA; NA
SG2000323 / CONSTRUCTION
two illuminated building sign
151 M ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI; NA
SB2000292 / CONSTRUCTION
WSP will be advancing approximately 50 soil borings to 30 feet, and an additional 8 borings to 4 feet via direct push. A water sample will be collected from 3 of the deep borings. All borings will be abandoned via bentonite grout mix. Investigation derived waste will be stored in DOT 55-gallon steel drums. Private and public utility locating will take place prior to the work beginning
250 M ST SE   
06/19/20 
WILLIAM C SMITH / null
E2008622 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
M2002834 / SUPPLEMENTAL
   
06/24/20 
SQUARE 769 LLC / null
P2006931 / SUPPLEMENTAL
300 M ST SE   
06/16/20 
FEDERAL CENTER LP / null
E2008501 / SUPPLEMENTAL
   
06/18/20 
FEDERAL CENTER LP / null
E2008587 / SUPPLEMENTAL
111 N ST SE   
06/16/20 
BROOKFIELD PROPERTIES / NA; CHRIS CRESCI
SB2000293 / CONSTRUCTION
WSP will advance 22 soil borings to 25 feet and 8 soil borings to 4 feet via direst push. A groundwater sample will be collected from 2 of the deep borings by installing a temporary well to be in the ground for just a couple hours. Borings will be backfilled with bentonite / grout mix. IDW will be stored in DOT 55-gallon drums. A private and public utility mark out will be completed prior to b...
861 NEW JERSEY AVE SE   
06/10/20 
CXS TRANSPORTATION INC / ;
P2006604 / SUPPLEMENTAL
   
06/19/20 
CXS TRANSPORTATION INC / ;
P2006843 / SUPPLEMENTAL
   
06/22/20 
GREYSTAR GP LLC / KIM MITCHELL
B1903035 / CONSTRUCTION
The proposed project is three structures which are connected by a shared below-grade garage, which is one story deep on the east half of the site and two stories deep on the west half of the site. Two structures will be residential, with a total of 756 units, and the third will be a 225-key hotel. The west residential structure (Building 3) is planned to be 13 stories with ground and roof level am...
   
06/25/20 
CXS TRANSPORTATION INC / ;
P2006972 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/10/20 
SQUARE 742 LLC, C/O SPAULDING & SLYE/STE 100, / PAUL WHITLEY
AN1900284 / CONSTRUCTION
PROJECT CONSISTS OF: REMOVING: (2) EXISTING EQUIPMENT CABINETS, (3) EXISTING ANTENNA'S, (1) EXISTING RRU'S AND ANCILLARY EQUIPMENT / CABLE AND INSTALLING: (6) PROPOSED ANTENNA'S, (3) PROPOSED RRU'S, AND(2) PROPOSED EQUIPMENT CABINETS ON AN EXISTING TELECOM FACILITY
1111 NEW JERSEY AVE SE   
06/12/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TRACIE CLAXTON; NA; NA
SG2000257 / CONSTRUCTION
One Wall Mounted Sign illuminated
   
06/24/20 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / null
P2006938 / SUPPLEMENTAL
401 WATER ST SE   
06/18/20 
BROOKFIELD PROPERTIES / CHRIS CRESCI
SB2000294 / CONSTRUCTION
WSP will advance 23 soil borings to 30 feet and 8 additional borings to 4 feet using direct push. A groundwater sample will be collected from 2 of the deep borings by installing a temporary well. Soil boirngs will be abandoned with bentonite / grout mix. IDW will be stored for disposal in DOT 55-gallon drums. A private and public utility mark out will be completed priot to starting intrusive w...
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Thompson Hotel ('20)
West Half ('19)
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2020 JD.