Since January, 2003
            
 Page Through from Before to After

If you are wandering by the southeast corner of South Capitol and M Streets next week and are wondering about seeing a bunch of well-dressed VIPs wielding shovels, it's not a new job training program--it'll be a ceremonial groundbreaking for the new headquarters for the National Association of Broadcasters at One M Street SE, being developed by Monument Realty.
The real work of construction, I'm told, is slated to start later this summer, but the NAB bigwigs were apparently going to be gathering in DC for a board meeting this month and so will take the opportunity to mark the occasion.
(And of course there is no statutory requirement that ceremonial groundbreakings take place x number of days before or after the start of actual digging.)
This headquarters will be a 120,000-square-foot offering with about 4,800 square feet of ground floor retail, and is expected to open in 2018. NAB and Monument announced the deal in April of 2015, calling it the "culmination of a rigorous search for a location with easier access to Capitol Hill that will allow NAB to improve its advocacy efforts."
Monument also tells me that the current plan is to also start this summer on 10 Van Street, the NAB HQ's 163-unit residential sibling immediately to the south, which you can see here and on my One M/10 Van project page.
And the big news that I'm burying all the way down here is that Monument tells me that the decision has been made that 10 Van will be condos, with a mix of one-, two- and three-bedroom units as well as multi-level two-bedroom townhouses facing both Van and South Capitol.
Once it gets started, the NAB HQ would be the second office project under construction, joining Skanska's on-spec 99 M a couple of blocks to the east. The 10 Van project will become part of the long list of residential projects currently being built, and will be the second in this block of South Capitol Street, along with JBG's 290-unit rental building at 1244 South Capitol that is expected to be completed in 2017. These will also be the first projects to get underway in 2016, unless the Yards Parcel O condo and rental buildings get started first.
I guess we'll know for sure that NAB/10 Van construction is truly at hand when the surface parking lot there stops accepting Nats gameday parking....
Comments (8)
   
 
 More About Development News

JDLand.com Home

Comments

NavyYardGuy says: (6/15/16 3:02 PM)
Condos. We need more condos.

Great news JD.


dude says: (6/15/16 10:29 PM)
More cool looking buildings. And of course that awesome Public Storage.


ras92 says: (6/16/16 9:35 AM)
YAY CONDOS FINALLY!!!


conngs0 says: (6/16/16 10:24 AM)
Nice little influx of condo buildings coming into the neighborhood with this and the PN Hoffman project across from the Banfield and Vida that's supposed to get underway this summer.


jdc says: (6/17/16 8:25 AM)
Who would want to face S. Capitol? Not at all an attractive view from anything below maybe the 5th or 6th floor. That said, another big boon to this area of JDLand, and I cannot wait.


jdc says: (6/18/16 7:57 AM)
Between these 2 buildings and then 1244 South Capitol, the storage facility sticks out like a sore thumb....If indeed the parcel off I street becomes a self storage facility (where there is no better use of that land), I wonder if at some point this site will just be too attractive to remain this use and the owners (who owns it JD?) redevelop it into apartments or *gasp* condos?


jdc says: (6/18/16 8:03 AM)
And one last point: I wondering how much concern (and competition there will be) over filling in all of the retail near the stadium? 1244 S. Cap. will have 26,000 sf retail, 25 M St will have 20,000 sf retail, JBG Half St. will have 65,000 sf, and Half St. hole parcel is set for over 60,000 sf of retail. (Is there any empty retail at 55 M anymore?) That's 171,000 sf of retail in the next 2-3 years, NOT including any retail going up on 1st St as part of those office/residential/dedicated 7k retail buildings. For comparison, the size of an average Wal-Mart supercenter is 179,000 square feet.


JD says: (6/18/16 9:11 AM)
As for all the retail space, I wrote a post not all that long ago very similar to what you wrote, laying out all the retail space coming soon, and that it will be interesting to watch how long it takes, and what type of retail comes in. And hardly anyone commented on it, so I guess it's not very interesting. :)

No big developer owns the self storage between JBG and Monument's projects. Though I'm guessing that whoever does own it gets an awful lot of phone calls!

{Actually, now that I think about it, maybe the big breaking down of coming retail space was in a comment on a post. Trying to find it.}


Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 
 Recent Posts

Westnorth on I'm Dreaming of: XO sauce is fish-based, as with many Cantonese sauces: https://en.wikipedia.org/...
NavyYardGuy on I'm Dreaming of: @hamburgular --I had the XO spaghetti last week too VERY fishy taste -- they sai...
Hamburglar on I'm Dreaming of: I took my wife over to try out ABC Pony for dinner. Be careful with the SPAGHET...
JD on I'm Dreaming of: And, has no one noticed the cool slideshows I've now added to the top of the hom...
RMP on Wednesday Tidbits: What's the deal with the makeshift front desk at Guild (a guy with a laptop at a...
conngs0 on Wednesday Tidbits: They might have chocolate covered donuts too. Or if the weather is good, just ge...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
No records added or modified in the past two weeks.

Recent Issued Building Permits Archive  
1402 1ST ST SE   
11/25/19 
UNITED STATES OF AMERICA / DAVID C POSTLEWAITE
SB1900412 / CONSTRUCTION
Parcel G2:WSP will complete four borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). The proposed boring locations would be in the four quadrants of Parcel G2 to check for spatial variability in contaminant concentrations. WSP will collect and analyze three soil samples from each boring from depths corresponding to potential subgrade elevations (i.e. 10-12 ft. bgs, 20-22 ...
1212 4TH ST SE   
11/25/19 
FC 1212 LLC / TAMIKA STATON; OTIS
ER2000409 / SHOP DRAWING
Replace governor car #2 - Part #: TBA20641H6 Replace hoist belts #1 and #4 - Part #: SB0003119
1300 4TH ST SE   
11/15/19 
ASANA PARTNERS / DEBRA MARSHALL; THE DONOHOE COMPANIES INC
B2001773 / CONSTRUCTION
ADD EXTERIOR DOOR, ADD INTERIOR DOOR , ANY RELAYED,ELECTRICAL,PLUMBING, RELOCATING UNBUILT APPROVED NON LOAD BEARING FIRE RATED PARTITIONS @ FIRST FLOOR APPROVED UNDER PERMIT #B1711970. ATTACHED
300 M ST SE   
11/11/19 
FEDERAL CENTER LP / null
P2001215 / SUPPLEMENTAL
861 NEW JERSEY AVE SE   
11/15/19 
CSX TRANSPORTATION INC / ERICKA CLARK; DGS CONSTRUCTION
TC2000008 / CONSTRUCTION
(2) tower cranes
   
11/26/19 
GREYSTAR GP I I, LLC / KIM MITCHELL; KIM MITCHELL
FD1900040 / CONSTRUCTION
TWO BELOW GRADE PRKING LEVELS, CONCRETE FOUNDATION WALLS, SLAB ON GRADE, COLUMNS ELEVATED DECKS UP TO GRADE WITH UNDERGROUND UTILITIES (MECHANICAL, PLUMBING, ELECTRICAL)
   
12/05/19 
MIKE ALLEN / JANE MCCRAY
AH2000244 / CONSTRUCTION
WO# 1611441 - Mike Allen / P. Helgeson. Pepco to install network transformer
1111 NEW JERSEY AVE SE   
11/15/19 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / TANYA HILL; THYSSENKRUPP
ER2000366 / SHOP DRAWING
REPLACE EXISTING 8MM WORN HOIST CABLES WITH LIKE IN KIND ON ELEVATOR #4. WORK TO ALLOW UNIT TO BE RETURNED TO SERVICE.
1299 NEW JERSEY AVE SE   
11/12/19 
BROOKFIELD DEVELOPMENT / JUSTIN BELLOW
BP2000489 / POST CARD
125 O ST SE   
11/25/19 
DISTRICT OF COLUMBIA / DAVID C POSTLEWAITE
SB1900411 / CONSTRUCTION
WSP will complete three borings up to the deepest potential subgrade elevation (approx. 32 ft. bgs). WSP assumes that borings will not be installed inside the fleet maintenance facility due to access restrictions imposed by DC Water. The proposed boring locations form an ā€˜Lā€™ shape around the eastern and southern sides of the fleet maintenance facility. WSP will collect and analyze three soil samp...
201 TINGEY ST SE   
11/14/19 
BROOKFIELD PROPERTIES / DFM DEVELOPMENT SERVICES, LLC
AH2000197 / CONSTRUCTION
Afterhours work at Tingey Square Project. The work performed will be forming, prepping and paving at Tingey Square park. Friday and Saturday the 15th & 16th, from 7PM to midnight. If required, Sunday the 17th from 7AM to 3PM. ANC Support provided. Associated Permit Include PA328164-R1 and PA10760162.
227 TINGEY ST SE   
12/02/19 
FC 227 LLC / KAYLA SHATTUCK; BROOKFIELD PROPERTIES MANAGEMENT LLC.
RW1900122 / CONSTRUCTION
Construction of new retaining wall located between Canal Street St and Third Street, SE.
300 TINGEY ST SE   
12/04/19 
FC BOILERMAKER LLC / ROBERT S. WATTS; ROBERT S. WATTS
E2002289 / SUPPLEMENTAL
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
Novel South Capitol ('19)
Yards/Guild Apts. ('19)
Capper/The Harlow ('19)
New DC Water HQ ('19)
Yards/Bower Condos ('19)
Virginia Ave. Tunnel ('19)
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2019 JD.