Since January, 2003
            
 Sliding from Before to After

The grapevine informs me that Forest City is moving forward with plans for a new residential building on "Parcel L," the site at the Yards along 3rd Street south of Tingey between DC Water and the Foundry Lofts where a parking lot currently sits.
It would have 270 rental units and two levels of underground parking, and currently has a targeted completion date of 2019 (which just isn't as far away as it used to be).
No renderings are available for public (or blogger) consumption, but my understanding is that it has a "terraced" design, and will be a U-shaped building with a courtyard that opens southward toward the Yards Park and the river. There will be retail along 3rd Street, but I don't know the exact amount.
Also, it should be noted that for the very north end of this parcel, along Tingey, there are also plans to have a "boutique" hotel, but there's no time frame for that.
Forest City is on the agenda for next Monday's ANC 6D meeting to give an initial presentation on the residential plans, in advance of heading off to Zoning Land later in the year.
This is not the only Yards residential project in the near-term pipeline, as the condo and apartment projects two blocks east on "Parcel O" at 4th Street are expected to begin construction in coming months. These projects would join the lineup of already completed Yards residential buildings Foundry Lofts, Twelve12, and Arris. It's also expected that there will be additional residential buildings along 1st Street SE near the planned movie theater.
Comments (17)
   
 
 More About Development News

JDLand.com Home

Comments

jdc says: (6/7/16 12:08 PM)
Wow, things will really be rocking and rolling in that swatch of parcels from Dock 79 to the Navy Yard and up toward M Street (especially along Half St. corridor/1st St. Corridor). And I thought things were booming just a bit further north along I/L.


CJBabyDaddy says: (6/7/16 12:30 PM)
Things are moving so quickly, we had better accelerate the plan to get the City Council to officially designate the area as JDLand-Land once and for all.


JD says: (6/7/16 12:32 PM)
...



202_cyclist says: (6/7/16 12:51 PM)
Thank you for posting. Are there any plans for the grass parcel immediately next to the Navy Yard chiller and air conditioning equipment east of Yards Park? It would be a nice area to have some large trees along the river.


JD says: (6/7/16 12:55 PM)
South of Parcel O, next to the parking lot? Eventually yes--but I bet it's going to be used as Parcel O construction staging.



JHUGrad says: (6/7/16 1:08 PM)
With all of these new housing options coming online in the next 2,3 years, it looks like the Capitol Riverfront will be DC's fastest growing neighborhood.


202_cyclist says: (6/7/16 1:31 PM)
JD- thanks for your response but I don't think this was used for construction staging . It is the small grass parcel immediately between the between the Anacostia riverwalk and the chiller/air conditioning equipment. It is just a small parcel which probably can't be developed because of the proximity to the Navy Yard but I was thinking if it is going to remain grass, it would be nice to add some trees.


MJM says: (6/7/16 2:30 PM)
Think that is supposed to be Living Classrooms building by chiller??


JD says: (6/7/16 2:41 PM)
@MJM, yes, though whether that is still part of the plan, I don't know.

@202, I meant that it may be used upcoming for Parcel O, not that it has been in the past.


Jaybird says: (6/8/16 12:26 PM)
Cool!

JD, have you thought of making a percentage thingy, like a temperature gauge, that would show the progress of JDLand heading towards full build out?



JD says: (6/8/16 12:31 PM)
Add Insignia on M (1111 NJ) to the lineup of projects having Topping Out parties--theirs is right now, apparently.


202_cyclist says: (6/8/16 1:06 PM)
@JD:

Where were our invitations?


JD says: (6/8/16 1:17 PM)
I don't think I've been invited to a topping out since 2007. But that one was a good one.

link



202_cyclist says: (6/8/16 1:51 PM)
In other 'news' our building had a happy hour event for residents at the Hampton Inn rooftop bar. It is a very nice setting, with stunning views of the greater JD Land neighborhood, Anacostia river, and Nats Park. I'd recommend visiting.


202_cyclist says: (6/8/16 1:52 PM)
Also, your competitor has a rundown of much of the development in the neighborhood. I think it is an incomplete list, however.


JD says: (6/8/16 1:56 PM)
You'd think they'd have been able to copy and paste as well as they usually do.


202_cyclist says: (6/14/16 2:46 PM)
I don't want to upstage anyone but it looks like the brick cladding is being installed at 1111 NJ Ave.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

202_cyclist on Peet's Grand Opening: Folks-- it looks like there may have been an assault recently on along South Cap...
NavyYardNittany on Peet's Grand Opening: I suppose if the comparison you’re using for this Harris Teeter is other DC groc...
snakegriffin on Peet's Grand Opening: @Ampersand: You are 100% correct, it is still the best grocery store with proxim...
Ampersand on Peet's Grand Opening: Besides the sometimes insanely long lines, I’ve never really understood the Navy...
202_cyclist on Peet's Grand Opening: @Dude— I suppose being disappointed in August will save us from the annual Octob...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
800 B/O L ST SE   THEFT FROM AUTO
Theft First Degree (theft From Motor Vehicle)
 08/15/18
1500 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/14/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/13/18
UNIT B/O N ST SE   THEFT
Theft First Degree (all Other Larceny)
 08/13/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/11/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/11/18
900 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
1000 B/O HALF ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/11/18
700 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 08/09/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/07/18
1400 B/O SOUTH CAPITOL ST   THEFT
Theft 2nd Degree (all Other Larceny)
 08/05/18
UNIT B/O N ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 08/03/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (theft From Building)
 08/01/18
100 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/31/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/25/18
1400 B/O SOUTH CAPITOL ST   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 07/22/18
1000 B/O 1ST ST SE   ROBBERY  07/22/18
400 B/O M ST SE   THEFT
Shoplifting
 07/21/18
1000 B/O 5TH ST SE   ASSAULT WITH A DANGEROUS WEAPON
Assault W/i To Kill
 07/21/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 07/19/18
200 B/O I ST SE   ROBBERY  07/17/18

Recent Issued Building Permits Archive  
1300 4TH ST SE   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801082 / SHOP DRAWING
Install 1 new elevators - 4000LBS@3500FPM Contract 639114, Elevator 1
   
07/24/18 
PN HOFFMAN AND ASSOCIATES, INC. / TAMIKA STATON; OTIS
EN1801083 / SHOP DRAWING
Install 1 new elevator 3500LBS@350FPM 12 Floors
4 I ST SE   
08/02/18 
CRESCENT COMMUNITIES / DANIEL P. THOMPSON
P1808039 / SUPPLEMENTAL
2 I ST SE   
08/02/18 
MCDONALDS CORPORATION / DONNA G GRAHAM
AH1801184 / CONSTRUCTION
WR #3573836 - VAETH / BRUNO-WARD 6-20003-PEPCO CREWS WITH BE WORKING #2 I ST SE - MAY NEED TO BLOCK "I" ST ON OCCASION TO INSTALL NETWORK TRANSFORMERS AND INSTALL CABLE - CREW WILL BE WORKING AT NIGHT DURING THE WEEK (MONDAY THRU FRIDAYS) FROM 9 PM TO 7 AM - WILL ALSO BE WORKING WEEKENDS (SAT & SUN) FROM 6AM TIL 6PM - WORK WILL START AUGUST 4TH, 2016 THROUGH AUGUST 31. 2018
300 M ST SE   
07/31/18 
FEDERAL CENTER LP / SAM HOLLEN
B1810089 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MEP AND LIFE SAFETY. NO STRUCTURAL. 2646 SQUARE FEET. SPEC SUITE 875
400 M ST SE   
07/25/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY (LAND) / DONNA G GRAHAM
AH1801155 / CONSTRUCTION
WR #3476633 / VAETH / BRUNO / WARD 6 / 20003 / PEPCO CREWS WORKING THE 300-400 BLK OF M ST SE SPLICING CABLE - WORKING SATURDAY 7 / 28 / 18 AND SUNDAY 7 / 29 / 18 FROM 6AM TIL 6PM
   
07/30/18 
CAPPER SENIOR II LIMITED PARTNERSHIP (IMPS) / DEBORAH MCCROSSIN
SOL1800691 / CONSTRUCTION
Installation of a 142.56 Kw roof mounted solar array.
861 NEW JERSEY AVE SE   
07/25/18 
CONSOLIDATED RAIL CORPORATION / NA CSX TRANSPORTATION, INC.
AH1801151 / CONSTRUCTION
Work in public ROW within the Virginia Avenue Tunnel Reconstruction Project LOD for utility, demolition, and concrete structure construction activities.
1111 NEW JERSEY AVE SE   
07/31/18 
null / NA NA NA
EHOP18941202 / HOME OCCUPATION
201 TINGEY ST SE   
08/02/18 
JBG/SEFC 170 LLC / BARBARA ANN STEDMAN
AH1801189 / CONSTRUCTION
WR#3570726 - CABLE SPLICING - MANHOLE ACCESS - ANTHONY PRICE
227 TINGEY ST SE   
07/27/18 
FOREST CITY WASHINGTON / null
P1807872 / SUPPLEMENTAL
   
07/27/18 
UNITED STATES OF AMERICA / null
P1807874 / SUPPLEMENTAL
300 TINGEY ST SE   
08/02/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1808020 / SUPPLEMENTAL
(1) Chiller (1) Water dispense
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.