Since January, 2003
            
 Sliding from Before to After

The grapevine informs me that Forest City is moving forward with plans for a new residential building on "Parcel L," the site at the Yards along 3rd Street south of Tingey between DC Water and the Foundry Lofts where a parking lot currently sits.
It would have 270 rental units and two levels of underground parking, and currently has a targeted completion date of 2019 (which just isn't as far away as it used to be).
No renderings are available for public (or blogger) consumption, but my understanding is that it has a "terraced" design, and will be a U-shaped building with a courtyard that opens southward toward the Yards Park and the river. There will be retail along 3rd Street, but I don't know the exact amount.
Also, it should be noted that for the very north end of this parcel, along Tingey, there are also plans to have a "boutique" hotel, but there's no time frame for that.
Forest City is on the agenda for next Monday's ANC 6D meeting to give an initial presentation on the residential plans, in advance of heading off to Zoning Land later in the year.
This is not the only Yards residential project in the near-term pipeline, as the condo and apartment projects two blocks east on "Parcel O" at 4th Street are expected to begin construction in coming months. These projects would join the lineup of already completed Yards residential buildings Foundry Lofts, Twelve12, and Arris. It's also expected that there will be additional residential buildings along 1st Street SE near the planned movie theater.
Comments (17)
   
 
 More About Development News

JDLand.com Home

Comments

jdc says: (6/7/16 12:08 PM)
Wow, things will really be rocking and rolling in that swatch of parcels from Dock 79 to the Navy Yard and up toward M Street (especially along Half St. corridor/1st St. Corridor). And I thought things were booming just a bit further north along I/L.


CJBabyDaddy says: (6/7/16 12:30 PM)
Things are moving so quickly, we had better accelerate the plan to get the City Council to officially designate the area as JDLand-Land once and for all.


JD says: (6/7/16 12:32 PM)
...



202_cyclist says: (6/7/16 12:51 PM)
Thank you for posting. Are there any plans for the grass parcel immediately next to the Navy Yard chiller and air conditioning equipment east of Yards Park? It would be a nice area to have some large trees along the river.


JD says: (6/7/16 12:55 PM)
South of Parcel O, next to the parking lot? Eventually yes--but I bet it's going to be used as Parcel O construction staging.



JHUGrad says: (6/7/16 1:08 PM)
With all of these new housing options coming online in the next 2,3 years, it looks like the Capitol Riverfront will be DC's fastest growing neighborhood.


202_cyclist says: (6/7/16 1:31 PM)
JD- thanks for your response but I don't think this was used for construction staging . It is the small grass parcel immediately between the between the Anacostia riverwalk and the chiller/air conditioning equipment. It is just a small parcel which probably can't be developed because of the proximity to the Navy Yard but I was thinking if it is going to remain grass, it would be nice to add some trees.


MJM says: (6/7/16 2:30 PM)
Think that is supposed to be Living Classrooms building by chiller??


JD says: (6/7/16 2:41 PM)
@MJM, yes, though whether that is still part of the plan, I don't know.

@202, I meant that it may be used upcoming for Parcel O, not that it has been in the past.


Jaybird says: (6/8/16 12:26 PM)
Cool!

JD, have you thought of making a percentage thingy, like a temperature gauge, that would show the progress of JDLand heading towards full build out?



JD says: (6/8/16 12:31 PM)
Add Insignia on M (1111 NJ) to the lineup of projects having Topping Out parties--theirs is right now, apparently.


202_cyclist says: (6/8/16 1:06 PM)
@JD:

Where were our invitations?


JD says: (6/8/16 1:17 PM)
I don't think I've been invited to a topping out since 2007. But that one was a good one.

link



202_cyclist says: (6/8/16 1:51 PM)
In other 'news' our building had a happy hour event for residents at the Hampton Inn rooftop bar. It is a very nice setting, with stunning views of the greater JD Land neighborhood, Anacostia river, and Nats Park. I'd recommend visiting.


202_cyclist says: (6/8/16 1:52 PM)
Also, your competitor has a rundown of much of the development in the neighborhood. I think it is an incomplete list, however.


JD says: (6/8/16 1:56 PM)
You'd think they'd have been able to copy and paste as well as they usually do.


202_cyclist says: (6/14/16 2:46 PM)
I don't want to upstage anyone but it looks like the brick cladding is being installed at 1111 NJ Ave.

Add a Comment:

Comments are closed for this post.

JDLand Comments RSS Feed


 More News


See All Current News Items | Full Blog Archive

 

JDLand.com's Official Unofficial Guide, Updated for 2018!
 Recent Posts

CJBabyDaddy on June Construction Update: How long before the Nats debut your “JDLand All-Star Hooligan“ merchandise line?
NavyYardRes on June Construction Update: This yellow brick has got to stop. They clearly bought together in bulk. Not a...
JD on June Construction Update: Thanks, fixed. (assuming you were talking about the Square 696 "rendering" link)
jdc on June Construction Update: JD - the link in the post says it points to a non-existent item.
conngs0 on June Construction Update: I guess there must be a very good price for that beige brick? Not a good look f...
Get JDLand Updates In Your Inbox!



City Government Data for Near Southeast Records added or updated recently displayed here; click the "archive" links to see additional detail and older records. All data from DC Government databases and RSS feeds. JDLand takes no responsibility for errors, omissions, etc. (read CapStat disclaimer). Data is retrieved daily.

Recent Crime Incidents Archive  
300 B/O VIRGINIA AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
1100 B/O NEW JERSEY AVE SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/18/18
800 B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/18/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/16/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 06/11/18
1100 B/O 8TH ST SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 06/10/18
UNIT B/O L ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 06/09/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/06/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 06/04/18
700 B/O L ST SE   THEFT
Theft 2nd Degree (all Other Larceny)
 05/29/18
1000 B/O NEW JERSEY AVE SE   MOTOR VEHICLE THEFT
Theft First Degree (Stolen Auto)
 05/28/18
1100 B/O 10TH ST SE   THEFT FROM AUTO
Theft 2nd Degree (theft From Motor Vehicle)
 05/26/18
1100 B/O 9TH ST SE   THEFT FROM AUTO
Theft (theft From Motor Vehicle)
 05/25/18
UNIT B/O I ST SE   THEFT
Theft First Degree (all Other Larceny)
 05/25/18
400 B/O M ST SE   THEFT
Theft 2nd Degree (theft From Building)
 05/22/18

Recent Issued Building Permits Archive  
1100 2ND PL SE   
06/19/18 
CAPPER CARROLLSBURG VENTURE LLC / null
E1807795 / SUPPLEMENTAL
1018 3RD ST SE   
06/06/18 
DAVID A LEINER / SCOTT STERL
F1800474 / CONSTRUCTION
REPLACEMENT OF AN EXISTING CHAIN LINK FENCE TO A WOODEN FENCE 6FT. TALL.
1212 4TH ST SE   
06/06/18 
null / THAIS NA PEACHER
EHOP18924304 / HOME OCCUPATION
100 H ST SE   
06/19/18 
DISTRICT OF COLUMBIA / RUSSELL COX
FD1800083 / CONSTRUCTION
Construction of foundation only
101 H ST SE   
06/05/18 
SQUARE 737 LLC / JOHN SONNER 4438727277
E1807389 / SUPPLEMENTAL
   
06/06/18 
SQUARE 737 LLC / null
P1806501 / SUPPLEMENTAL
2 I ST SE   
05/31/18 
CRESCENT CAPITOL VIEW / null
E1807278 / SUPPLEMENTAL
4 I ST SE   
06/18/18 
CRESCENT COMMUNITIES / KIM MITCHELL
B1804349 / CONSTRUCTION
VELOCITY - 4 I ST SE- IS THE PHASE II OF A MIXED-USE RESIDENTIAL PROJECT LOCATED AT 2 I ST SE. IT SITS AT TE CORNER OF I ST & SOUTH CAPITOL ST SE. PHASE II CONSIST OF 184 RESIDENTIAL UNITS AND ROUGHLY 3,800 SF OF RETAIL ON 1ST FLOOR FACING I STREET. TWO LEVELS OF UNDERGROUND PARKING GARAGE SERVES BOTH PHASES OF THE PROJECT. BUILDING HEIGHT IS 130 FEET. INCLUDING 3 ELEVATORS.
202 M ST SE   
05/29/18 
null
E1807211 / SUPPLEMENTAL
   
05/29/18 
null
P1806323 / SUPPLEMENTAL
100 M ST SE   
06/05/18 
SQUARE 743 INC / ROBERT L HUNTER 703-404-0303
M1802631 / SUPPLEMENTAL
202 M ST SE   
05/31/18 
UNITED STATES OF AMERICA / null
P1806387 / SUPPLEMENTAL
300 M ST SE   
05/25/18 
FEDERAL CENTER LP / GARY BRENT; CARLOS DIAZ
SG1800308 / CONSTRUCTION
Install 2 illuminated wall signs and 1 temporary Banner - Sprint
   
06/01/18 
FEDERAL CENTER LP / SAM HOLLEN
B1809520 / CONSTRUCTION
INTERIOR RENOVATION TO 8TH FLOOR OFFICE SPACE. PARTITIONS, FURNITURE, MECHANICAL, ELECTRICAL AND LIFE SAFETY. NO PLUMBING OR STRUCTURAL. 860 SQUARE FEET. STRATEGIC INSIGHT
410 M ST SE   
05/30/18 
DISTRICT OF COLUMBIA HOUSING AUTHORITY / SCOTT NICHOLS
AN1800023 / CONSTRUCTION
AT&T proposes to add three new antennas to an existing rooftop telecommunications facility.
1115 NEW JERSEY AVE SE   
06/07/18 
DONOHOE REAS ESTATE SERVICES / null
E1807467 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE 20003   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807687 / SUPPLEMENTAL
   
06/14/18 
GALLERY CAPITOL RIVERFRONT PROPERTY LLC / THOMAS P MCGUIRE 410-766-7463
E1807698 / SUPPLEMENTAL
1115 NEW JERSEY AVE SE   
06/12/18 
GALLERY CAPITOL WATERFRONT PROPERTY LLC / null
P1806653 / SUPPLEMENTAL
1100 NEW JERSEY AVE SE   
06/12/18 
SQUARE 742 LLC / CLIFFORD DIXON
B1807730 / CONSTRUCTION
REVISION: REVISE B1804348 5TH FLOOR OFFICE SPACE TO EXTEND THE OFFICE INTO ADDITIONAL SPACE TO CREATE A LARGER OPEN OFFICE
1200 NEW JERSEY AVE SE 20590   
06/20/18 
JBG/FEDERAL CENTER LLC / ALFRED F JORDAN 202-437-5067
E1807865 / SUPPLEMENTAL
71 POTOMAC AVE SE   
05/30/18 
FORIDA ROCK PROPERTIES INC / ANKIT K SINGH
UT1800044 / CONSTRUCTION
Removal of an Underground storage Tank (UST) 7 feet in diameter and approximately 16 feet long (approximately 6,000 gallons). Suspected Fuel Tank. Tank is filled with water and soil. Tank will be cleaned, removed and disposed off as per the appropriate standards and requirements.
221 TINGEY ST SE   
06/05/18 
GONE YARD HOTEL OWNER LLC / MITCH PERMUY 7272100491
E1807017 / SUPPLEMENTAL
227 TINGEY ST SE   
05/25/18 
FOREST CITY WASHINGTON / MELISSA DIAZ
B1801871 / CONSTRUCTION
Yards Parcel L-2. New 11-story mixed use building with residential, retail on ground level, and underground parking garage. TPR
   
05/31/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806388 / SUPPLEMENTAL
(2) Backwater valve
   
06/07/18 
UNITED STATES OF AMERICA / MICHAEL ERIC CAMPBELL 571-229-1360
M1802664 / SUPPLEMENTAL
Equipment Manufacturer Equipment Model AAON DOAS, RTU and AHU DAIKIN VRF and split systems DESERT AIRE LC06R7NFDDMLAERD
   
06/07/18 
FOREST CITY WASHINGTON / DANIEL P. THOMPSON
P1806553 / SUPPLEMENTAL
REVISION TO P1806388. IN LIEU OF 753 SINKS SHOULD READ 264 SINKS, 489 BASINS
   
06/18/18 
UNITED STATES OF AMERICA / MITCH PERMUY 7272100492
E1807256 / SUPPLEMENTAL
300 TINGEY ST SE   
06/04/18 
FC BOILERMAKER LLC / ALBERT E. WILLIAMS 443-532-0991
M1802615 / SUPPLEMENTAL
   
06/04/18 
FC BOILERMAKER LLC / null
P1806437 / SUPPLEMENTAL
   
06/05/18 
FC BOILERMAKER LLC / CARLOS E. MONTES
P1806464 / SUPPLEMENTAL
355 WATER ST SE   
06/14/18 
UNITED STATES OF AMERICA / EDUARDO LOPEZ 2023884000
E1807680 / SUPPLEMENTAL
355 WATER ST ST SE   
06/13/18 
UNITED STATES OF AMERICA / KIMBERLY SPEED
TN1800127 / CONSTRUCTION
The Great Lawn at Yards Park will be the site of the California State Society Annual Summer Picnic. The contract specifies the licensee to obtain permits for tents and generators on the lawn. The large tent is 100 x 40 - which I have the Certificate of Flame Resistance), as well as a generator. I have the generator specifications from the distributor.
AH = After Hours; B = Alteration & Repair; D = Demolition; E = Electrical; FB = Boiler; M = Mechanical; P = Plumbing and Gas; PC = Post Card; R = Raze; SG = Sign; TL = Tenant Layout; TN = Tent; RW = Retaining Wall;

Real Property Sales Archive  
No commercial transaction records added or modified in the past two weeks.


Project Directory
Completed
99 M ('18)
Agora ('18)
1221 Van ('18)
District Winery ('17)
Insignia on M ('17)
F1rst/Residence Inn ('17)
One Hill South ('17)
Homewood Suites ('16)
ORE 82 ('16)
The Bixby ('16)
Dock 79 ('16)
Community Center ('16)
The Brig ('16)
Park Chelsea ('16)
Yards/Arris ('16)
Hampton Inn ('15)
Southeast Blvd. ('15)
11th St. Bridges ('15)
Parc Riverside ('14)
Twelve12/Yards ('14)
Lumber Shed ('13)
Boilermaker Shops ('13)
Camden South Cap. ('13)
Canal Park ('12)
Capitol Quarter ('12)
225 Virginia/200 I ('12)
Foundry Lofts ('12)
1015 Half Street ('10)
Yards Park ('10)
Velocity Condos ('09)
Teague Park ('09)
909 New Jersey Ave. ('09)
55 M ('09)
100 M ('08)
Onyx ('08)
70/100 I ('08)
Nationals Park ('08)
Seniors Bldg Demo ('07)
400 M ('07)
Douglass Bridge Fix ('07)
US DOT HQ ('07)
20 M ('07)
Capper Seniors 1 ('06)
Capitol Hill Tower ('06)
Courtyard/Marriott ('06)
Marine Barracks ('04)


Overviews
Capper/Carrollsburg
Anacostia Riverwalk
New Jersey Avenue
M Street
South Capitol Street
The Yards
Lower 8th Street
East M Street
Boathouse Row





                  © Copyright 2018 JD.